Imagine US is a startup that offers high-definition 3-D prenatal ultrasounds for high-end customers. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses):

Activity 1: Welcome a patient and explain the procedure. (7 minutes)

Activity 2: Prep the patient (e.g., show them to the room, apply ultrasound gel). (3 minutes)

Activity 3: Take images. (14 minutes)

Activity 4: Analyze images. (9 minutes)

Activity 5: Discuss diagnostic with patient. (23 minutes)


They have three workers. Suppose they are to assign activities to workers such a. that each activity is assigned to only one worker and each worker must be assigned consecutive tasks. What would be the maximum capacity of this process (patients per hour)?

Suppose tasks are assigned to three workers and now workers are able to do

b. multiple tasks and their assigned tasks do not need to be consecutive. What would be the maximum capacity of this process (patients per hour)?

Imagine US is a startup that offers high-definition 3-D prenatal ultrasounds for high-end customers. The service process incl


7 0
Add a comment
✔ Recommended Answer
Answer #2

Question a)

Conditions are

1. Each activity should be assigned to only one worker

2. Each worker must assign consecutive tasks

then work assigned to each worker as below

WORKERASSIGNEDTIME
W1A17
W1A23
W2A314
W3A49
W3A523

TOTAL56

Activity 1 and 2 capacity = 10 minutes

Activity 3 and 4 capacity = 23 minutes

Activity 5 = 23 minutes 

Maximum capacity = 60/23 = 2.61 patients per hour

Question b

Conditions-

1. Workers can do multiple task

2. Assigned task do not needto be consecutive. That is it can be consecutive also.

If so each worker can attend each patient at a time. then


W1W2W3



StartStopStartStopStartStop
A1070707
A2710710710
A3102410241024
A4243324332433
A5335633563356

If one worker is there then he could complete the job in 56 minutes.

Capacity = 60/56 = 1.07patients per hour

Now there three workers

capacity = 1.07 x 3 = 3.21 patients per hour


answered by: Jared D.
Add a comment
Answer #1

As per above given instruction the the job sequence should be as below

(AL) A2 - A3 A+ 2A5 27 a 14 3 구

Question a)

Conditions are

1. Each activity should be assigned to only one worker

2. Each worker must assign consecutive tasks

then work assigned to each worker as below

WORKER ASSIGNED TIME
W1 A1 7
W1 A2 3
W2 A3 14
W3 A4 9
W3 A5 23
TOTAL 56

Total time for attending one patient = 56 min

Maximum capacity = 60/56 = 1.07 patients per hour

Question b

Conditions-

1. Workers can do multiple task

2. Assigned task do not needto be consecutive. That is it can be consecutive also.

If so each worker can attend each patient at a time. then

W1 W2 W3
Start Stop Start Stop Start Stop
A1 0 7 0 7 0 7
A2 7 10 7 10 7 10
A3 10 24 10 24 10 24
A4 24 33 24 33 24 33
A5 33 56 33 56 33 56

If one worker is there then he could complete the job in 56 minutes.

Capacity = 60/56 = 1.07patients per hour

Now there three workers

capacity = 1.07 x 3 = 3.21 patients per hour

Add a comment
Know the answer?
Add Answer to:
Imagine US is a startup that offers high-definition 3-D prenatal ultrasounds for high-end customers. The service...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coin

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Mr. K’s is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services...

    Mr. K’s is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described next (the time required for each activity is shown in parentheses): Activity 1: Welcome a guest and offer homemade herb tea (12 minutes). Activity 2: Wash and condition hair (12 minutes). Activity 3: Neck, shoulder, and back stress-release massage (12 minutes)....

  • The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there...

    The White Tooth Device Company is a manufacturer of high-end electric toothbrushes. For each toothbrush, there are a sequence of assembly steps performed by five workers. Each worker does two tasks. Workers are paid $24 per hour. Time (seconds) Task Worker T1 A 51 A T2 44 В тЗ 10 В T4 13 C Т5 29 C T6 14 T7 20 D T8 17 Е T9 44 Е T10 38 Instruction: Round "cost of direct labor" and "average labor utilization"...

  • PA 4-4 (Algo) Mr. K's is a very popular hair salon. It... Mr. K's is a...

    PA 4-4 (Algo) Mr. K's is a very popular hair salon. It... Mr. K's is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described next (the time required for each activity is shown in parentheses): Activity 1: Welcome a guest and offer homemade herb tea (9 minutes). Activity 2: Wash and condition hair...

  • Samson & Me is a very popular hair salon. It offers high-quality hair-styling and physical relaxation...

    Samson & Me is a very popular hair salon. It offers high-quality hair-styling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes these activities that are conducted in the sequence described below. (The time required for each activity is shown in parenthesis): Activity 1: Welcome a guest and offer homemade herb tea. (8 minutes) Activity 2: Wash and condition hair. (10 minutes) Activity 3: Design the hairstyle and style the hair....

  • QUESTION 4 Mr. K's is a very popular hair salon. It offers high-quality hair styling and...

    QUESTION 4 Mr. K's is a very popular hair salon. It offers high-quality hair styling and physical relaxabon services at a reasonable price, so I always has unlimited demand. The service process includes five activities that are conducted in the sequence described below. The time required for each activity is shown in parenthesis Activity 1: Welcome a guest and offer homemade herb tea (10 minutes) Activity 2: Wash and condition hair (10 minutes) Activity 3: Neck, shoulder and back stress...

  • Mr.K's Hair Salon (Q1-Q10) Mr.K's is a hair salon whose service process includes six activities conducted...

    Mr.K's Hair Salon (Q1-Q10) Mr.K's is a hair salon whose service process includes six activities conducted in the sequence described below. (The time required for each activity is shown in parentheses): Activity 1: Welcome guests and serve herb tea. (10 minutes) Activity 2: Offer styling suggestions. (15 minutes) Activity 3: Condition hair. (10 minutes) Activity 4: Do the hair. (30 minutes) Activity 5: Wash hair. (10 minutes) Activity 6: Check out the guest. (5 minutes) Three servers (S1, S2, and...

  • Mr. K's is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reas...

    Mr. K's is a very popular hair salon. It offers high-quality hairstyling and physical relaxation services at a reasonable price, so it always has unlimited demand. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parenthesis):Activity 1: Welcome a guest and offer homemade herb tea. (10 minutes)Activity 2: Wash and condition hair. (10 minutes)Activity 3: Neck, shoulder, and back stress release massage. (10 minutes)Activity 4: Design...

  • QUESTION 2 One Hour Loan offers customized loans. Customers call a toll free number with a...

    QUESTION 2 One Hour Loan offers customized loans. Customers call a toll free number with a specific loan request, and obtain a response within an hour One Hour Loan's business process includes tv sequence described below. (Theme required for each activity is shown in parenthesis: which must be conducted Activity 1. Answer customer call and record key information 4 minutes) Activity 2: Other and format the information obtain credit scores, organize Bustomer specie need for analysis 5 minutes Activity 3:...

  • PART I: Multiple Choice Write all answers to the following questions. No partial credit available. Consumption...

    PART I: Multiple Choice Write all answers to the following questions. No partial credit available. Consumption utility is composed of price and convenience. True or False? A firm reduces inefficiencies by making trade-offs. True or False? A firm can increase its profitability by: A. increasing costs and reducing price. B. moving away from the efficient frontier. C. increasing inefficiencies. D. reducing inefficiencies. Operations comes from the Latin word "opus," which means: A. activity. B. helping people. C. improvement. D. work....

  • High-End Lifts uses a volume-based, plant-wide approach to allocating overhead. They use direct-labor hours as the...

    High-End Lifts uses a volume-based, plant-wide approach to allocating overhead. They use direct-labor hours as the cost driver for determining the budgeted rate. You will need to derive the predetermined overhead rate for them. First few images are information for the actual problems. Please help!! Challenge 2: Job-Order Costing for Customized Work Based on your advice, High-End Lifts has moved forward and set up the production process to build all of its residential elevators in- house. In the past, High-End...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT