pls provide detail explanations on how to plot the cumulative number of blows/penetration curve. pls provide...

Cluil Enginuring Sie Invatgation Dynamie Con Penetro muter Erample bcP teat (byname Co Penetromaur) Ih resuts from Im on a se

pls provide detail explanations on how to plot the cumulative number of blows/penetration curve.
pls provide detail explanations on how to determine the CBR of the various layers.

Cluil Enginuring Sie Invatgation Dynamie Con Penetro muter Erample bcP teat (byname Co Penetromaur) Ih resuts from Im on a secthon a 1 elown to a cle ptl af aloout he neo labo ratory budel ing parking for shown below: Penetrahon Alo 1Do oo 300 400500 600 00 00q001000 Blows 3 20 22 3 of IG Penetraton-i Cmm) a Plot 4he Cumu latwe number af. blows Penetraton Cuve b) betermin the numbur op layers anal thielene s3 of layer's +he var ous the various layers +e CBR of beter min sub sucpace conelrton su93eateal J bescribe the by e results Avel Memory Log (ceR)
0 0
Add a comment
Answer #1

No. of Blows

Cumulative No. of Blows (1)

Cumulative Penetration (mm) (2)

DCP Penetration/blow (mm)(3)

CBR (%) (4)

Average DCP Penetration/blow (mm) (5)

Average CBR Per Layer (%)(6)

Layer Thickness (mm) ( c)(7)

Soil Type (d) (8)

0

0

0

0

6.388888889

42.52706595

300mm (Layer 1)

Sand

16

16

100

6.25

43.52660775

16

32

200

6.25

43.52660775

15

47

300

6.666666667

40.65635696

3

50

400

33.33333333

7.418518196

41.66666667

5.859806599

Layer 2

(400mm)

Clay

2

52

500

50

4.832687417

3

55

600

33.33333333

7.418518196

2

57

700

50

4.832687417

20

77

800

5

55.104708

6.388888889

56.9264908

Layer 3

(300mm)

Gravelly Sand

20

97

900

5

55.104708

22

119

1000

4.545454545

60.94537781

Penetration Curve Blows 20 40 60 80 100 120 140 0,0 16, 100 Layer 1 200 32, 200 -47,300 400 50, 400 Layer 2 52,500 600 55, 60

Detailed Solutions

  1. Since the number of blows per 100 mm penetration is given, cumulatively add the total number of blows for each successive 100 mm penetration, (Refer Column number (1)).

For calculating the DCP Penetration per blow ( Refer column No. (3)), divide the penetration required for 100mm by corresponding number of blows.

For eg. , DCP penetration per blow for 400mm penetration = (400-300)/ 3 = 33.33mm. Now plot the graph as shown in the above chart.

  1. For finding the number of layers, identify the slope change of the penetration curve. Every change in slope represents a change in layer type.(Refer Chart)

Thickness of layer is the cumulative penetration (Refer Column (2)) at the bottom of the layer subtracted by the cumulative penetration at the top of the layer.

Calculate the average DCP penetration per blow for each layer (Refer column (5))

  1. From the following given equation,

                log10CBR = 2.48 – 1.057 log10(DCP Penetration / blow)

            The CBR value of each layer can be computed as:

            Layer Average CBR = 102.48 – 1.057 log10(Average DCP Penetration per blow (mm) for corresponding layer)

  1. The reference book: User Guide to the Dynamic Cone Penetrometer by Office of Minnesota Road Research has been used to correlate the CBR and DCP penetration values with soil type. Soil Type CBR Range DPI Range Clay (CL) Sand (S-W) Gravel (G-W) 53-100 5-2.7 2-17 127-15 17-45 15-6 Loose sands and gravel wi
Add a comment
Know the answer?
Add Answer to:
pls provide detail explanations on how to plot the cumulative number of blows/penetration curve. pls provide...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coin

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.