What are the key elements and their associated risks of a work breakdown structure (WBS) in project development
of COVID-19 emergency response plan for a community of 5600 members and a project budget of $250,000?
Answer:
The key elements include:
1. Specialised hospital wards for the affected patients.
2. Protection measures for the people who are not infected.
3. Determining the number of people who have been contacted by the infected person and quarantining them
4. Resourcing the necessary equipments and things that are required for the treatment
5. Provisioning of the all necessary kits that are required for providing the treatment to the affected patients.
6. If the disease spreads among the 5600 people, then the budget allotted may be insufficient for the effective treatment.
Risk associated with the key elements:
1. Hospital wards should have separate sections for each of the patient so as to maintain appropriate gaps between them and each section should be insulated otherwise it would be difficult to control the treatment process.
2. Protection measures for the people who are not infected are very necessary so as to stop the spreading of the disease. Without appropriate protection measure, there is a risk of exponential spreading of the disease.
3. Numbers of people who have been contacted by the infected persons are hard to determine. However, it is very necessary that these people should be determined in exact numbers. This can be done by conducting interview of the infected person in the protect environment and analysing his mobile phone contacts to exactly determine whom the person has contacted.
4. Equipments and accessories that are required for the treatment are very necessary. It should be available in abundant numbers for the effective treatment of the patients. Their non availability is a greater threat to the community of 5600 people.
5. All the needed kits should be provided to the doctors. Non availability of the kits are a serious threat to the society and the doctors.
What are the key elements and their associated risks of a work breakdown structure (WBS) in...
Draw a work breakdown structure (WBS) with its key elements and their associated risks in project development of COVID-19 emergency response plan for a community of 5600 members and a limited project budget of $250,000 with following conditions: a. procurement, modification to, and set up of the vehicles carrying patients (ambulances) and supplying water, PPE and disinfection services. b. recruitment and hiring of drivers, buyers, logistics specialists, etc. c. training – all types d. supply chain establishment and original stock...
Project Management - Creating a Work-Breakdown Structure (WBS) Produce a WBS of at least 3 levels (1.1.1) for a "Fun Walk-or-Run" event, intended to raise money for the local community. A minimum of 6 tasks of at least 3 levels (1.1.1) need to be identified. Thank you.
What differentiates a list of project requirements from a work breakdown structure (WBS)? What is the importance of developing a WBS to manage a project? How does the WBS contribute to the success of a project? Once the project schedule is finalized, what are the tools you can use to monitor the schedule? How do you handle resource over allocation? What are the advantages and disadvantages of fast-tracking a project?
A Work Breakdown Structure is a tool used for project planning. It organizes the work to be done on a project. There is no specific model to follow for the development of a WBS. Prepare a WBS for making a salad. Feel free to include charts.
QUESTION 5 When planning a project there are several key points that must be considered. A bar chart based on the work breakdown structure (WBS) of a plant is a very clear means of presenting a programme of work. Draw a bar chart and a resource chart derived from the bar chart showing all salient values. [14]
QUESTION 5 When planning a project there are several key points that must be considered. A bar chart based on the work breakdown...
QUESTION 6 All of the following are true about a work breakdown structure (WBS)EXCEPT which one? A The team and the project manager should be involved in creating it B. The accumulation of the work in the WBS should be equal to the work of the project, C. The activity sequencing of the WBS can be done only in parallel D. If the work is not listed in the WBS, it is not in the project.
QUESTION 22 Is the conversion of a project work breakdown structure (WBS) into an operating timetable. O Project budget O Project schedule O Project scope O Project resources QUESTION 23 People are the most valuable resource in your project O True False QUESTION 24 A common mistake in project management is to appoint as project manager an individual with excellent skills but weak skills. O Technical; Managerial O Managerial: Technical O Technical: Social O Social: Managerial
When planning a project there are several key points that must be considered. A bar chart based on the work breakdown structure (WBS) of a plant is a very clear means of presenting a programme of work. Draw a bar chart and a resource chart derived from the bar chart showing all salient values.
Create a Work Breakdown Structure ( WBS) for a design & build project of your choosing (phone app) 10 – 15 tasks Establish precedents Determine critical path Determine finish date (or time)
Draw a tree diagram for the 3rd level Work Breakdown Structure (WBS) below: 1.1: Device Structure 1.1.1: Launcher Assembly 1.1.2: Support Materials 1.1.3: Attachment Material 1.1.4: Treat Dispenser 1.1.5: Initial Designs 1.1.6: Detailed Device Drawings 1.1.7: Team Lago 1.2: Electronics 1.2.1: Controller Circuitry 1.2.2: Power 1.2.3: Treat Dispenser Circuitry 1.2.4: Motor Circuitry 1.2.5: Components Research 1.2.6: Initial Circuitry Design 1.2.7: Finalized Circuitry Design 1.3: Project Management...