pls provide detail explanations on how to plot the
cumulative number of blows/penetration curve.
pls provide detail explanations on how to determine the CBR of the
various layers.
|
No. of Blows |
Cumulative No. of Blows (1) |
Cumulative Penetration (mm) (2) |
DCP Penetration/blow (mm)(3) |
CBR (%) (4) |
Average DCP Penetration/blow (mm) (5) |
Average CBR Per Layer (%)(6) |
Layer Thickness (mm) ( c)(7) |
Soil Type (d) (8) |
|
0 |
0 |
0 |
0 |
6.388888889 |
42.52706595 |
300mm (Layer 1) |
Sand |
|
|
16 |
16 |
100 |
6.25 |
43.52660775 |
||||
|
16 |
32 |
200 |
6.25 |
43.52660775 |
||||
|
15 |
47 |
300 |
6.666666667 |
40.65635696 |
||||
|
3 |
50 |
400 |
33.33333333 |
7.418518196 |
41.66666667 |
5.859806599 |
Layer 2 (400mm) |
Clay |
|
2 |
52 |
500 |
50 |
4.832687417 |
||||
|
3 |
55 |
600 |
33.33333333 |
7.418518196 |
||||
|
2 |
57 |
700 |
50 |
4.832687417 |
||||
|
20 |
77 |
800 |
5 |
55.104708 |
6.388888889 |
56.9264908 |
Layer 3 (300mm) |
Gravelly Sand |
|
20 |
97 |
900 |
5 |
55.104708 |
||||
|
22 |
119 |
1000 |
4.545454545 |
60.94537781 |

Detailed Solutions
For calculating the DCP Penetration per blow ( Refer column No. (3)), divide the penetration required for 100mm by corresponding number of blows.
For eg. , DCP penetration per blow for 400mm penetration = (400-300)/ 3 = 33.33mm. Now plot the graph as shown in the above chart.
Thickness of layer is the cumulative penetration (Refer Column (2)) at the bottom of the layer subtracted by the cumulative penetration at the top of the layer.
Calculate the average DCP penetration per blow for each layer (Refer column (5))
log10CBR = 2.48 – 1.057 log10(DCP Penetration / blow)
The CBR value of each layer can be computed as:
Layer Average CBR = 102.48 – 1.057 log10(Average DCP Penetration per blow (mm) for corresponding layer)

pls provide detail explanations on how to plot the cumulative number of blows/penetration curve. pls provide...