There are four steps in the manufacturing process of a stuffed toy: cutting, stuffing, sealing, and packaging. There are two employees each for cutting and stuffing but one each for sealing and packaging. The processing times of cutting, stuffing, sealing, and packaging are 9, 4, 2, and 2.5 seconds per toy per employee.
a) What is the designed cycle time for stage "cutting" (in [min/unit])?
b) What is the designed cycle time for stage "sealing" (in [min/unit])?
c) Which stage is the bottleneck? What is the process capacity in [units/hour]? If you add one employee in parallel at the bottleneck stage, what should be the capacity of the new employee so that you increase the process capacity as much as possible?
thank you.
a)
Ccle time is the average time between completing the task. For cutting we have 2 employees and each can complete the task in 9 seconds. This mean 1 min we can make 2*60/9 = 13.33 units. This means the cycle time is 1/13.33 = 0.075 min/unit
b)
In 1 min, we can seal 60/2 = 30 units. This means the cycle time 1/30 = 0.033 min/unit
c)
The capacity at each stage in units/hour
Cutting = 2*(60*60/9) = 800 units
Stuffing = 2*(60*60)/4 = 1800 units
Sealing = (60*60)/2 = 1800 units
Packaging = (60*60)/2.5 = 1440 units
The system capacity = min(800,1800,1800,1440) = 800 unit/hour
The bottleneck stage is cutting. If we add one more employee at the cutting stage the capacity will be 3*(60*60)/9 = 1200 units per hour
There are four steps in the manufacturing process of a stuffed toy: cutting, stuffing, sealing, and...
C&A Fast Food has four activities in serving a customer: greet customer, take order, process order, and deliver order. Each activity is staffed by one employee (for a total of four employees). The processing time for each activity is given as follows: Activity Processing time per customer Greet customer 2 seconds Take order 30 seconds Process order 60 seconds Deliver order 5 seconds a.What is the average labor utilization? b.Assume demand is unlimited. If one additional employee is added to...
Part 1.C&A Fast Food has four activities in serving a customer: greet customer, take order, process order, and deliver order. Each activity is staffed by one employee (for a total of four employees). The processing time for each activity is given as follows: ActivityProcessing time per customer Greet customer 2 seconds Take order 30 seconds Process order 60 seconds Deliver order 5 seconds. a. What is the average labor utilization? b.Assume demand is unlimited. If one additional employee is added...
Anguilla Manufacturing is interested in using the data collected during value stream mapping to evaluate the current state of performance of the capacity of its manual assembly line process under different batch size assumptions. The availability of processing per shift, after accounting for breaks and a midshift employee meeting, is 436 minutes. The current operating characteristics of each processing step are found in the accompanying table. Note that each step can only process one part at a time and all...
ANSWER #23
22. An Ice cream shop in Queens offers a wide selection of ice cream and frozen yogurt. It has three employees. Assuming that there is unlimited demand. Employee #1 – greets the customer and takes an order – 3 minutes per customer. Employee #2 - prepares an order- 6 min per customer. Employee #3 – takes payments – 5 min per customer. 22. a. Capacity of Employee 1 =Flow rate * 60=1/3 *60 =20 customers per hour b.Bottle...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units.hr 1.8 units/hr Assembly a Sawing 0.8 units/hr Sanding Welding 5 units/hr Assembly 0.8 units/hr Driling 5 units.hr Assembly 0.8 units/hr a) Sanding is the bottleneck b) The bottleneck...
13. manufacturing is interested is in using the data Collected Stream mapping to Curosent state perstormance of its manual under UUUUUUU Anguilla interested dusing value evaluate the of the Capacity assembly line process different butch Size assumptions. The cuandbility of processing pero shift, after accounting for breaks and a midshift employee meeling is L36 mimutesThe current Opexeting Characterstics of each processing Step Com, only process one pest cat a time and all steps the must process Same Sized betches. 20...
What is the process time of the system?
b) What is the bottleneck time of this work cell?
c)What is the process cycle time?
d) If the firm operates 10 hours per day, 5 days per week, what is
the weekly capacity of this work cell?
The three-station work cell illustrated in the figure below has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2. o Capacity:...
1. The capacity of server 3 is ______ orders per hour?
2. The capacity of Server1 + Server 2 is ______ orders per
hour?
3. Which one is the bottleneck?
4. The capacity of the process is ______ orders per hour.
5.The cycle time of Server 1 + Server 2 is ______ minute(s)?
6. The flow time of the process is ______ minutes?
Server 1 Download Server 2 Server 3 [ → Finished →L-Download- Validate Order order 2 min/order For...
Part I – Process and Capacity Analysis Mortgage, Inc. processes loan applications in a “back-office” service facility. Each loan application must undergo a sequence of three separate processing activities before Mortgage, Inc. can make a decision to approve or decline the application. That is, a loan application first passes through Activity 1, then Activity 2, and finally Activity 3. Each activity has a fixed number of workers (given below). For example, there are three workers assigned to Activity 1 and...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units/hr Sawing 2.1 units/he Sanding Assembly 0.8 unitsthe Welding 6 units.hr Assembly 0.8 units Drilling 5 unitshe Assembly 0.8 untui is the bottleneck 0.7 units/hr a) Drilling is the...