A power generation system with a turbine and a generator is located at a dam, where the water falls from 119.002 m height to the turbine. Assuming turbines having 100% efficiency, what should be the flow rate of water (in kg/s) to produce 7.608 MW of power? (Take gravitational acceleration as 9.81 m/s2
A power generation system with a turbine and a generator is located at a dam, where...
A power generation system with a turbine and a generator is located at a dam, where the water falls from 106.074 m height to the turbine. Assuming turbines having 100% efficiency, what should be the flow rate of water (in kg/s) to produce 7.486 MW of power? (Take gravitational acceleration as 9.81 m/s2.
water 248 m 945 ml 2 Water Pipe GENERATOR TURBINE 1) A dam in somewhere with a height of 248 m, is one of the tallest dam in the world. Water flows with a volumetric flow rate of 65 m'ls to a turbine, where electric power is generated. The total irreversible head los in the piping system from point 1 to point 2 (excluding the turbine unit) is determined to be 95 m. The pressure difference due to elevation cannot...
a) The following figure shows a water dam built for a hydroelectric power project running constantly round the year. During a dry season, it acts as water reservoir of constant height 80 m. Meanwhile rainy season, water flow of 3 m/s is added to the system. (Water density 10x10 kg/m' and volume flow, V = 45x10 m/s respectively and the gravitational acceleration is about 9.8 kg/m for both seasons). Evaluate the followings: Ravet afsec RE Figure 2: Water flow utilization...
25. In a hydroelectric dam, water falls 25 m and then spins a turbine to generate electricity. a) What is U, of 1.0 kg of water? b) Suppose the dam is 80% efficient at converting the water's potential energy to electrical energy. How many kilograms of water must pass through the turbines each second to generate 50 MW of electricity? This is a typical value for a small hydroelectric dam.
9) Electrical power is to be generated by installing a hydraulic turbine-generator at a site 70 m below the free surface of a large water reservoir that can supply water at a rate of 1500 kg/s steadily. If the mechanical power output of the turbine is 800 kW and the electric power generation is 350 kW, determine the turbine efficiency and the combined turbine-generator efficiency of this plant. Neglect losses in the pipes. (10pts).
ENGR 320 Exam2 Name 1: (15+5 pts) A hydroelectric power plant takes in 25 m's of water through its turbine and discharges it to the atmosphere at V2-I m/s. The head loss in the turbine and penstock system is 10 m. Assuming turbulent flow, a -1.12, (a) What it the power in MW extracted by the turbine? () If the efficiency of the turbine and electrical generator is 85% what is the net power (in MW) generated by this plant?...
Required information NOTE: This is a multi-part question. Once an answer is submitted, you will be unable to return to this part. The water in a large lake is to be used to generate electricity by the installation of a hydraulic turbine-generator at a location where the depth of the water is 57 m. Water is to be supplied at a rate of 5000 kg/s. If the electric power generated is measured to be 1862 kW and the generator efficiency...
1. The Davis Dam was constructed 67 miles downstream from the Hoover Dam. The reservoir formed by the dam is called Lake Mohave. The reservoir has a total storage capacity of 1,818,300 acre-feet. Given the average head of the reservoir is 136 feet, determine the potential energy of the water in the reservoir. 2. When the effective head of water behind the Davis Dam is 41 meters, a penstock 22 feet in diameter will flow 42,000 gallons of water per...
The state of Iowa is among the top three states in U.S. in wind power generation. In 2016, over 20 billion kWh of electrical energy in Iowa was generated by wind power. Assuming that wind speed at the altitude of wind turbine is in average of 6 m/s, the efficiency of converting wind energy to the electricity is 80 %, and all wind turbines work constantly throughout the year. We can further assume that the air in Iowa has an...
Required information NOTE: This is a multi-part question Once an answer is submitted, you will be unable to return to this part The water in a large lake is to be used to generate electricity by the installation of a hydraulic turbine-generator a location where the depth of the water is 62 m. Water is to be supplied at a rate of 5000 kg/s. If the electric power generated is measured to be 1862 kW and the generator efficiency is...