You only have two attempts for this quiz. If you are unsure of the correct answer feel free to check your notes or open anoth
You only have two attempts for this quiz. If you are unsure of the correct answer feel free to check your notes or open another tab and rewatch the previous videos. You will not be able to see the correct answers until after the due date has passed, 1 1 point When performing the high-low method, how should you choose your high and low points Identify the highest and lowest x point (volume), and the highest and lowest points (cost). Identify the highest and lowest points (volume), then take their corresponding y points (cost), Choose any points given it won't matter. 2 ОООО 1 point When calculating "rise over run," what exactly are you finding? Formula:(y-vl/bx-x) Othey intercept of the cost behavior line, which is y, the total cost the slope of the cost behavior line, which is the total fixed costs the slope of the cost behavior line, which is the variable cost per unit they intercept of the cost behavior line, which is the number of units 3 1 point When you have found your cost equation (after completing the high-low method, which of the following terms should be filled in with numbers instead of staying letters? у f OOOO х
0 0
Next > < Previous
ReportAnswer #1
Please give positive ratings so I can keep answering. It would help me a lot. Please comment if you have any query. Thanks!
Correct answer is second option.
Identify the highest and lowest x points (volume) and then take their corresponding y points (cost).
Correct answer is third option.
The Slope of the cost behavior line, which is the variable cost per unit.
Correct answer is third option.
X.
Know the answer?
Add Answer to:
You only have two attempts for this quiz. If you are unsure of the correct answer...
Your Answer: Your Name: What's your source?
Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • You only have two attempts for this quiz. If you are unsure of the correct answer,...

    You only have two attempts for this quiz. If you are unsure of the correct answer, feel free to check your notes or open another tab and re-watch the previous videos). You will not be able to see the correct answers until after the due date has passed, 1 point What is the cost equation? type your answer type your answer... type your answer + type your answer 0000 Toint Which numbers are the same no matter how many units...

  • A 1. For purposes of budgeting in the short run, the variable cost function is 'assumed...

    A 1. For purposes of budgeting in the short run, the variable cost function is 'assumed to be linear. This assumption is called: the relevant range' assumption b. the 'linear budgeting' assumption c. the 'variable costing' assumption 2. Which of the following components of factory overhead would most likely be considered a variable cost: straight-line depreciation on factory equipment indirect labor wages paid to the factory maintenance crew c. Indirect materials used in production the cost of factory rent 3....

  • ========================= MANAGERIAL ACCOUNTING QUESTIONS Please answer ALL in DETAILS to get upvote Thanks!!! Question 5: Cost...

    ========================= MANAGERIAL ACCOUNTING QUESTIONS Please answer ALL in DETAILS to get upvote Thanks!!! Question 5: Cost structure estimation activity volume month Oct Nov Dec in units 80 75 100 total costs $4,085 $4,250 $5,000 a) Which cost structure estimation method should we use? O account classification method O high-low method b) To identify the low and high points, we should look for O lowest/highest costs O lowest/highest activity c) Estimate the cost structure parameters: total FC unit VC Write down...

  • I had an assignment containing 45 problems, and I am unsure of 4, can you check and see if the answers are correct

    I had an assignment containing 45 problems, and I am unsure of 4, can you check and see if the answers are correct? 1. Write an equation of the line containing the given point and parallel line (5,-1), 3x-7y=9 My answer was: y=3/7x-22/7 2. Find the equation of the line having the given slope and containing the given point: m=-6,(7,8) My answer: y=-6x+373. Find the slope-intercept of the line that has the given characteristics: slope 8 and y intercept (0,7)My...

  • I had an assignment containing 45 problems, and I am unsure of 4, can you check and see if the answers are correct

    I had an assignment containing 45 problems, and I am unsure of 4, can you check and see if the answers are correct?1. Write an equation of the line containing the given point and parallel line(5,-1), 3x-7y=9My answer was: y=3/7x-22/72. Find the equation of the line having the given slope and containing the given point: m=-6,(7,8)My answer: y=-6x+503. Find the slope-intercept of the line that has the given characteristics: slope 8 and y intercept (0,7)My answer was y=8x-74. Find an...

  • I had an assignment containing 45 problems, and I am unsure of 4, can you check and see if the answers are correct

    I had an assignment containing 45 problems, and I am unsure of 4, can you check and see if the answers are correct? 1. Write an equation of the line containing the given point and parallel line (5,-1), 3x-7y=9 My answer was: y=3/7x-22/7 2. Find the equation of the line having the given slope and containing the given point: m=-6,(7,8) My answer: y=-6x+50 3. Find the slope-intercept of the line that has the given characteristics: slope 8 and y intercept...

  • Question Help E6-34A (similar to) Meyer Company, which uses the high-low method to analyze cost behavior,...

    Question Help E6-34A (similar to) Meyer Company, which uses the high-low method to analyze cost behavior, has determined that machine hours best predict the company's totale s cost. The company's cost and machine hour usage data fort first six months of the year follow (Click the loon to view the data) Requirements Using the high-low method, answer the following questions 1. What is the variable its cost per machine hour? 2. What is the red cost of its each month?...

  • My question is When you are determining the slope of the line using the High low...

    My question is When you are determining the slope of the line using the High low method Can we calculate this off of the High and low of the cost or does it have to be based off of The High and low of the Volume only? please reply me

  • You have to find the x and y coordinates:(She doesn't get it and neither do I) 2x + y = 9 The question doesn't go with the equation

    You have to find the x and y coordinates:(She doesn't get it and neither do I) 2x + y = 9The question doesn't go with the equation. I suspect it is a plotting exercise Make a table x y Put in for x 0, 1, 4 Solve for each corresponding y. Then graph the points, and connect them with a straight line. As is stands now, the problem as stated is confusing.Sorry,does this go with it: Be sure to put...

  • 1. Complete the two activities below. 1. To create the equation of a linear function in...

    1. Complete the two activities below. 1. To create the equation of a linear function in standard form, pick two coordinate points to be the x-intercept and y-intercept. o Write the equation in standard form and graph the equation using the intercepts. • Determine the slope and y-intercept of your line. Explain how to graph the line using the slope and y-intercept. • Discuss which method of graphing is easier and why you chose that one. • Is there a...

Free Homework App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.