Question

2. Which of the following is not a dimension of service quality? Select one: a. responsiveness...

2. Which of the following is not a dimension of service quality? Select one:

a. responsiveness

b. conformance

c. tangibles

d. assurance

e. convenience

4. A Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results : Machine #1 measurements [13, 16, 21, 16]; Machine #2 measurements [ 22, 24, 23, 21]; Machine #3 measurements [ 15, 24, 13, 12]. Using the factors for three sigma control limits, what are x-bar chart upper and lower control limits?

Select one:

a.

26.15and 10.51

b.

20.4and 16.26

c.

23.93and 12.74

d.

41.33and -4.667

13. Which of the following is not a step in the quality control planning process?

Select one:

a.Define the quality characteristic to be controlled.

b.Determine a quality control point in the process.

c.Plan corrective action

d.Eliminate all defects found.

e.Plan how inspection is to be done

15.

In the basic EOQ model, if annual demand is 185, holding cost is $4.42 (per unit per year), and total inventory related cost on the basis of EOQ is $370, the EOQ(rounded to the next whole number) is:

Select one:

a.84

b.185

c.92

d.10

1 0
Add a comment Improve this question Transcribed image text
✔ Recommended Answer
Answer #1

2. Conformance.

The major dimensions of service quality are :

Tangibles

Responsiveness

Assurance

Convenience

Empathy

(*as per HOMEWORKLIB RULES ,I've answered the first question.*)

Add a comment
Know the answer?
Add Answer to:
2. Which of the following is not a dimension of service quality? Select one: a. responsiveness...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • 4. A Quality Analyst wants to construct a control chart for determining whether three machines, all...

    4. A Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results : Machine #1 measurements [13, 16, 21, 16]; Machine #2 measurements [ 22, 24, 23, 21]; Machine #3 measurements [ 15, 24, 13, 12]. Using the factors for three sigma control limits, what are x-bar chart...

  • 13. Which of the following is not a step in the quality control planning process? Select...

    13. Which of the following is not a step in the quality control planning process? Select one: a.Define the quality characteristic to be controlled. b.Determine a quality control point in the process. c.Plan corrective action d.Eliminate all defects found. e.Plan how inspection is to be done

  • Aitehicles at one location keeps track of the mumber out- of service each day (see VEHICLE)....

    Aitehicles at one location keeps track of the mumber out- of service each day (see VEHICLE). Out of service is use for four or more hours Number Out of Service Proportionn 248 0.004 248 10 0.012 248 0.008 0024 248 15 16 0.032 19 0.016 the centerline and control limits for the appropriate control chart b. Are there any indications of a lack o a lack of control? onstant 224 Part Two Tools and Meshods olytc Sis Exercises afcturer of...

  • 1st*variability is: in control/out of control 2nd*no samples fall/one/two/more 3rd* in control/out of control The following...

    1st*variability is: in control/out of control 2nd*no samples fall/one/two/more 3rd* in control/out of control The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. X Sample R 1 95.72 1.0 95.24 2 0.9 0.9 95.18 95.42 0.4 4 5 95.46 0.5 95.32 1.1 6 7 95.40 0.9 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12...

  • Problem5 While efficiency in the production operation is important to profitability,ACME Valve is also known for...

    Problem5 While efficiency in the production operation is important to profitability,ACME Valve is also known for high quality fieished products. Parts that do not meet specifications cannot be "reworked, so that both the raw material cost and the machine time to produce them are detrimental to profitability. Drills can become holes, and machines can get out of callbration as well For the parts in your department the critical dimension is the diameter of the center hole and design specifications require...

  • 5. Which one of the following concepts is not involved when implementing total quality control? Workers being given responsibility Enforce compliance Fail-safe methods Automatic inspection Level sche...

    5. Which one of the following concepts is not involved when implementing total quality control? Workers being given responsibility Enforce compliance Fail-safe methods Automatic inspection Level schedule the factory 14. Which one of the following are suggestions for developing a focus forecasting system? Use a seasonality index. Keep rules simple. Keep the people using the forecasts separate from those who make the forecasts. The faster the growth, the higher the tracking signal. Set control limits that will keep the forecasters...

  • Which one of the following is not generally regarded as part of the budgetary process? Select...

    Which one of the following is not generally regarded as part of the budgetary process? Select one: Preparation of master budget. Communication of objectives. Designing an absorption costing system. On-going review of budgets. - A company's budgeted variable overheads for a period amounted to £24,000. During this period, the company spent £23,760 on variable overheads. The company’s level of production was expected to require 12,000 labour hours but the actual amount of labour hours used was only 10,800 hours. What...

  • 8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 pe...

    8. If a line is balanced with 80 percent efficiency, the "balance delay" will be: 20 percent. B. 80 percent. C. 100 percent. D. unknown, since balance delay is not related to efficieney. E. depends on the next operation. 9. A common goal in designing process layouts is: A. minimizing the number of workers. B. minimizing number of machines. minimizing transportation costs. maximizing workstation productive time E. maximizing transportation distances. 07) vnit 10. The maximum allowable cycle time is computed...

  • Which of the following is an advantage of technology in nursing practice? a. inclination of nurses...

    Which of the following is an advantage of technology in nursing practice? a. inclination of nurses to focus on the equipment rather than the patient b. increased ability to monitor patients remotely c. increased confidentiality of patient information d. reliability of internet resources 2. When using computers in direct patient care, it is important to remember to: a. assess the patient and provide care based on the individual's needs b. look up the clinical practice guidelines for each illness use...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT