1.
The machine idle activities are Wait for maintenance service and Wait for next material
The machine set up activities are Remove Scrap, Change tool, Change material, Adjust die.
2.
Occurrence probability for machine idle activities = (53 + 25) / 400 = 0.195
Occurrence probability for machine set up activities = (48 + 17 + 12 + 23) / 400 = 0.25
Standard error of Occurrence probability for machine idle
activities =
= 0.0198
Standard error of Occurrence probability for machine set up
activities =
= 0.02165
z value for 95% confidence interval is 1.96
95% confidence interval for the Occurrence probability for machine idle activities is,
(0.195 - 1.96 * 0.0198, 0.195 + 1.96 * 0.0198)
(0.1562, 0.2338)
95% confidence interval for the Occurrence probability for machine set up activities is,
(0.25 - 1.96 * 0.02165, 0.25 + 1.96 * 0.02165)
(0.2076, 0.2924)
(c)
Given Margin of error = 3% = 0.03
For 2 limits, z =
2
Adequate sample size for machine idle activities = (z / E)2 * p(1 - p)
= (2 / 0.03)2 * 0.195 * (1 - 0.195) = 698 (Rounding to nearest integer)
Adequate sample size for machine set up activities = (z / E)2 * p(1 - p)
= (2 / 0.03)2 * 0.25 * (1 - 0.25) = 833 (Rounding to nearest integer)
For a industrial and systems engineering class Work Sampling Exercise This study is focusing on machine...
Elroy had been with Barnes Machine Company a year since finishing a BS in industrial engineering (IE). Barnes had been in business for over 50 years, but the company had only recently moved from Detroit to Gainesville, Georgia. The public reason for the move was the economics of the old facility. Privately, based on comments he had heard, Elroy believed a shift to nonunion labor was a larger motive. Elroy’s boss is the production supervisor, Mr. Hill. Because the plant...
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...