Question

Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An e
0 0
Add a comment Improve this question Transcribed image text
Answer #1
Case Non-Value-Added Cost Root Cause Cost Reduction
1

$26 per unit

Labor ((48-18) X 12 per hour) 6
Material ((5-3) X 10) 20
Total 26
Process design Activity reduction
2

$2841 per setup

Old setup time 14 hours
New setup time (28/60) 0.47 hours
Non value added time 13.53 hours
Cost per hour $210
Non value added cost $2841
Product design Activity reduction
3

$90

(6 moves X $15 per move)

Plant Layout Activity Elimination
4.

$415,000

Salary 130,000
Supplies(15,000 X 19) 285,000
  • Process design
  • Product design
Activity Elimination
5

$5,320

Componants before increasing quality 18.3
Componants after increasing quality 5
Non value added componant 13.3
Cost per componant $400
Non value added cost $5,320
Process design Activity Sharing
6 $220,000 per year Product design Activity reduction
Add a comment
Know the answer?
Add Answer to:
Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following...

    Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. b. The root causes of the activity cost (such as plant layout, process design, and product design). C. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection, 1. It takes 48 minutes and five pounds of material...

  • Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Varianc...

    Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company produces custom-made machine parts. Maquina recently has implemented an activity-based management (ABM) system with the objective of reducing costs. Maquina has begun analyzing each activity to determine ways to increase its efficiency. Setting up equipment was among the first group of activities to be carefully studied. The study revealed that setup hours was a good driver for the activity. During the last year, the company incurred...

  • Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Varianc...

    Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company produces custom-made machine parts. Maquina recently has implemented an activity-based management (ABM) system with the objective of reducing costs. Maquina has begun analyzing each activity to determine ways to increase its efficiency. Setting up equipment was among the first group of activities to be carefully studied. The study revealed that setup hours was a good driver for the activity. During the last year, the company incurred...

  • Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company pro...

    Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company produces custom-made machine parts. Maquina recently has implemented an activity-based management (ABM) system with the objective of reducing costs. Maquina has begun analyzing each activity to determine ways to increase its efficiency. Setting up equipment was among the first group of activities to be carefully studied. The study revealed that setup hours was a good driver for the activity. During the last year, the company incurred...

  • Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company produces custom-made...

    Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company produces custom-made machine parts. Maquina recently has implemented an activity-based management (ABM) system with the objective of reducing costs. Maquina has begun analyzing each activity to determine ways to increase its efficiency. Setting up equipment was among the first group of activities to be carefully studied. The study revealed that setup hours was a good driver for the activity. During the last year, the company incurred...

  • 1., Which of the following statements is(are) true about non value added activities? Non value added activities are oft...

    1., Which of the following statements is(are) true about non value added activities? Non value added activities are often unnecessary and dispensable Non value added activities maybe necessary but are being performed in an inefficient and improvable manner Non value added activities can be eliminated without deterioration of product quality, performance or perceived value A, b, and c A and b 2. Which of the following is least likely to be classified as a facility level activity in an activity-based...

  • A product currently requires 6 moves. By changing the plant layout, the number of moves can...

    A product currently requires 6 moves. By changing the plant layout, the number of moves can be reduced to 2. The cost per move is $40. Calculate the reduction in the nonvalue-added cost of the moving activity. a.$150 b.$30 c.$0 d.$7 e.$160

  • Pareto Chart and A report summarizing the costs, percent of total, and percent of sales by appraisal, prevention, internal failure, and external failure cost of quality categories.Cost of Quality Re...

    Pareto Chart and A report summarizing the costs, percent of total, and percent of sales by appraisal, prevention, internal failure, and external failure cost of quality categories.Cost of Quality Report for a Manufacturing Company The president of Mission Inc. has been concerned about the growth in costs over the last several years. The president asked the controller to perform an The study of employee effort and other business records to determine the cost of activities.activity analysis to gain a better...

  • Consider the following situations: (a) Three Hands Co. manufactures metal candleholders. Using a traditional manufacturing technique,...

    Consider the following situations: (a) Three Hands Co. manufactures metal candleholders. Using a traditional manufacturing technique, Three Hands can produce a batch of five hundred White Gothic candleholders using 500 kg of alloy metal, 100 hours of labour time, and 3 hours of set-up time. After a re-engineering study Three Hands can now produce the same size batch of candleholders with only 300 kg of alloy metal, 60 hours of labour time, and 2 hours of set-up time. The labour...

  • Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC boand assembly o...

    Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC boand assembly operation, a number。individuals are esponsible for assenting electronic components into pn te i ut boards. Each operator s es ons le r so den g e net erdg to a given set of instructions. Operators work on batches of s0 printed dircuit boards. Each board requires 4 minutes of board assembly time. After each...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT