Question

Barnyard Construction sells and erects barn-shaped shell houses, that is, frame buildings that are finished on the exterior but are unfinished on the interior except for studded partition walls and flooring. These shells are sold to people who are have the time and skills to finish the homes themselves. > A ) Discuss ) Module ) Course Barnyard buys materials to build shell houses in kits from a manufacturer. When beginning business in an area, Barnyard buys land as a site for its local warehouse, office, and displays. Display houses are built at a cost from $ 0,000 to $60,000 which includes the cost of labor and materials. Old display houses are torn down after 3 to 7 years. Sample display houses have no salvage value. Instructions Hypothetically, the costs of the display houses could be (1) expensed in the periods in which the expenditure is made or (2) spread over more than one period. Discuss the advantages of each method.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

The advantage of expensing the entire cost in the period in which expenditure is made are :-

1. First of all this method is very simple and easy to use without any complexity.

2 . If it is to be expenses in different periods then selecting the relevant period to be used for expensing would be a difficult task and may involve individual objectivity.

Advantages of spreading over more than one period :-

1 . Since the salvage life of display houses are torn down only after 3 to 7 years only if they are not sold this it would be quite logical to spread their cost.

2. It takes time to build display house for more than one period thus thus spreading of their cost will be just.

3. If the cost will be shown in a single period then it will show a very distorted profit and loss account, since cost incurred on display houses is high and involves expenses incurred in different different periods since it takes time to build them.

4 . Spreading their cost either on the basis of percentage of completion method or spreading cost to the life of these houses will lead to showing true and fair view of financial statements .

Add a comment
Know the answer?
Add Answer to:
Barnyard Construction sells and erects barn-shaped shell houses, that is, frame buildings that are finished on...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Daniel Barenboim sells and erects shell houses, that is, frame structures that are completely finished on...

    Daniel Barenboim sells and erects shell houses, that is, frame structures that are completely finished on the outside but are unfinished on the inside except for flooring, partition studding, and ceiling joists. Shell houses are sold chiefly to customers who are handy with tools and who have time to do the interior wiring, plumbing, wall completion and finishing, and other work necessary to make the shell houses livable dwellings. Barenboim buys shell houses from a manufacturer in unassembled packages consisting...

  • CA2-9 Concepts for Analysis 71 Barenboim buys shell houses from a manufacturer in unassembled of all...

    CA2-9 Concepts for Analysis 71 Barenboim buys shell houses from a manufacturer in unassembled of all lumber, roofing, doors, win- new area, Barenboim buys uses are erected at a total cost he display houses is the unas- torn down or altered into new dows, and similar materials necessary to complete a shell house. Upon ons in a land as a site for its local warehouse, field office, and display hous 630,000 to $44,000 including the cost of the unassembled packages....

  • CA2-9 Concepts for Analysis 71 Barenboim buys shell houses from a manufacturer in unassembled r dows,...

    CA2-9 Concepts for Analysis 71 Barenboim buys shell houses from a manufacturer in unassembled r dows, and similar materials necessary to complete a shell house. Upon or leases land as a site for its local warehouse, field office, and display hou of $30,000 to $44,000 including the cost of the unassembled packages. The sembled packages, inasmuch as erection is a short, low-cost operation. Old ssmpie models every 3 to 7 years. Sample display houses have little salvage value because dis...

  • CA2-9 Concepts for Analysis 71 n of all lumber, roofing, doors, win- or leases land as...

    CA2-9 Concepts for Analysis 71 n of all lumber, roofing, doors, win- or leases land as a site for its local warehouse, field office, and display houses. Sample display houses are erected at a total cost Barenboim buys shell houses from a manufacturer in unassembled package dows, and similar materials necessary of $30,000 to $44,000 including to complete a shell house. Upon commencing operations in a new area, Barenboim the cost of the unassembled packages. The chief element of cost...

  • SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the...

    SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the company's new line of single-serve coffee pods or to await results from the product's launch in the United States. Key strategic decisions include choosing the target market to focus on and determining the value proposition to emphasize. Important questions are also raised in regard to how the new product should be branded, the flavors to offer, whether Kraft should use traditional distribution channels or...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT