Waymire Ltd. manufactures two products and currently allocates overhcad based on direct labour hours. For the coming year, the company is considering changing to an activity based costing system by allocating overhead based on 3 activities. The estimated amount of overhead traceable to the 3 activities for the coming year are given below Activity Purchase orders Maintenance Machine Cost driver Cost #oforders $873069 347 Product I Product 2 599 19282 2198 $448164 18218 hours Inspection #of S704819 1736 inspections Total estimated direct labour hours for the coming year are 27302 hours for Product 1 and 80250 hours for Product 2 What is the difference between total overhead allocated to Product 2 using activity based costing versus traditional costing? Note: a negative number indicates less total overhead allocated using activity based costing. Select one a. $334684 b. $-848996 c. $-334684 d. $-662744
0 0
Add a comment Improve this question Transcribed image text
Answer #1
Activity Cost Total activity Activity rate X Activity for Product 2 Overhead allocated to Product 2
Purchase orders 873069 946 922.91 599 552821
Maintenance 448164 37500 11.95 19282 230440
Inspection 704819 3934 179.16 2198 393796
Total 2026052 1177056
Traditional costing:
Total overhead 2026052
Divide by Total labor hours 107552 =27302+80250
Overhead rate 18.84
X Product 2 hours 80250
Overhead allocated 1511740
Difference = 1177056-1511740 = $-334684
Option C is correct
Add a comment
Know the answer?
Add Answer to:
Waymire Ltd. manufactures two products and currently allocates overhcad based on direct labour hours. For the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Krypton Ltd.’s budgeted information relating to the manufacture of two of its products is presented below:...

    Krypton Ltd.’s budgeted information relating to the manufacture of two of its products is presented below: # of times driver used Activity Cost Driver Product A Product B Setup $56501 # of batches 30 10 Engineering $121204 # of engineering hours 6657 9224 Machine Maintenance $89140 # of machine hours 7000 12000 Direct labour cost $11/hour $352180 $528909 Direct materials $126718 $96026 What would be the pre-determined overhead rate under a traditional costing model, with overhead allocated based on direct...

  • 2 sweredthe company has budgeted to produce 1718 units of one of its products. Each unit...

    2 sweredthe company has budgeted to produce 1718 units of one of its products. Each unit requires 2 hours of direct labour ut of Waymire Ltd. currently uses a traditional costing system based on direct labour hours to allocate overhead. This year For the coming year, the company is considering changing to an activity based costing system by allocating overhead based on 3 activities. The following are the activities, budgeted total cost and cost drivers per activity for the upcoming...

  • Coronado Company produces two products: MB-R and MB-X. Currently, Coronado allocates overhead based on direct labour...

    Coronado Company produces two products: MB-R and MB-X. Currently, Coronado allocates overhead based on direct labour hours. Overhead is estimated at $436,800. The cost accountant realizes that there are some differences in how resources are being used in producing these two components and is considering the use of ABC to allocate overhead. She determines that overhead is caused by testing and inspections, $112,000; machine setup, $84,000; machine stamping, $200,000; and plant maintenance, $40,800. Coronado estimates the following activities related to...

  • Goodwin Co, manufactures two products: R and W. The company uses activity-based costing to apply manufacturing...

    Goodwin Co, manufactures two products: R and W. The company uses activity-based costing to apply manufacturing overhead costs to products. The cost pools and related estimated overhead costs for 20x3 are as follows: Activity Cost Activity measure Overhead cost Pool Assembly Number of direct labour $33289 hours Inspection Number of inspections 153569 Product support Number of engineers 247332 The expected activity measures for the manufacturing of product R in 20x3 are: 135 direct labour hours, 4548 inspections, and 2 engineer(s)....

  • Derf Company allocates overhead on the basis of direct labour hours. Two direct labour hours are required for each unit of product. Continued

    Derf Company allocates overhead on the basis of direct labour hours. Two direct labour hours are required for each unit of product. Planned production for the period was set at 9000 units. Manufacturing overhead is estimated at $135,000 for the period (20 per cent of this cost is fixed). The 17,200 hours worked during the period resulted in the production of 8500 units. Variable manufacturing overhead cost incurred was $108,500 and the fixed manufacturing overhead cost was $28,000. Required(a)    Determine the...

  • Bernadette Inc. makes several products and uses one cost driver (direct labour hours) to assign overhead...

    Bernadette Inc. makes several products and uses one cost driver (direct labour hours) to assign overhead to the products. Bernadette has started to wonder whether the use of activity based costing (ABC) would be more appropriate. To start, Bernadette would like to investigate what the costing would look like for one product (Product A) using ABC.  Details are below. Current Unit Information of Product A (using direct labour hours as the overhead cost driver) Selling Price                $23 Direct Materials          $10 Direct Labour                  6 Overhead                        3...

  • Plaid Manufacturing Co. produces two products: G1 and M1. The company uses an activity based costing...

    Plaid Manufacturing Co. produces two products: G1 and M1. The company uses an activity based costing system. The following are the activities, budgeted total cost and cost drivers per activity for the year 20x9: Activity Budgeted Cost Cost Base Cost Base Volume Assembly $877831 # of DL hours 37167 Inspection $668988 # of units 20830 Shipping $339555 # of batches 186 Plaid Manufacturing has budgeted to produce 3,000 units of M1. M1 is manufactured in batches of 80 units and...

  • Question 2 (15 marks) - Topic 6 Nature Productions manufactures two products the company's products for...

    Question 2 (15 marks) - Topic 6 Nature Productions manufactures two products the company's products for next year are prov icts. Lightning and Flame. Estir for next year are provided below: Lightning Flame Estimated production volume 4,000 5,000 Direct material cost $25 / unit $30 / unit Direct labour per unit 4 hours @ $8/ hour 3 hours @ $8/ hour The company's estimated overhead of $800,000 activities: material handling ($150,000), ass ($90,000). These activities are driven by 9 hours,...

  • Hickory Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates

    Hickory Company manufactures two products—13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all $788,400 of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost PoolActivity MeasureEstimated Overhead CostExpected ActivityMachiningMachine-hours$ 238,80012,000MHsMachine setupsNumber of setups$ 93,100190setupsProduct designNumber of products$ 83,0002productsGeneral...

  • Carolina Industries manufactures two products, Product C and Product D

    Carolina Industries manufactures two products, Product C and Product D. The company estimated it would incur $ 160,790 in manufacturing overhead costs during the current period. Overhead currently is applied to the products on the basis of direct labour hours. Data concerning the current period's operations appear below:Required:a) Compute the predetermined overhead rate under the current method, and determine the unit product cost of each product for the current year. (8 Marks)b) The company is considering using an activity-based costing...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT