i need to know how to ger the 13% = IRR. pls show step by step as i have been trying to solve and unable to get the 13%.
Calculate 609201 $200,000 $300,000 $300,000 $200,000 $200,000 $160.000 (1+IRR) (1+ IRR) (1+ IRR) (1+ IRR)* (1+IRR) (1+IRR) By
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Trial and error is u have to keep making guess and zeroing on the correct IRR

We will start with a random number and calculate Right Hand Side RHS. If it comes larger than LHS 927917 , Increase the IRR otherwise decrease the IRR. Continue the process till RHS=LHS=927917

Try with IRR=10%

RHS=200000/1.1+300000/1.1^2+300000/1.1^3+200000/1.1^4+200000/1.1^5+160000/1.1^6=1006249.291

As this is more than 927917

Increase IRR to 15%

RHS=200000/1.15+300000/1.15^2+300000/1.15^3+200000/1.15^4+200000/1.15^5+160000/1.15^6=880969.4249

As this is less than 927917

Decrease IRR to 13

RHS=200000/1.13+300000/1.13^2+300000/1.13^3+200000/1.13^4+200000/1.13^5+160000/1.13^6=927916.9013

Stop the process as we have reached the value

So IRR=13%

Add a comment
Know the answer?
Add Answer to:
i need to know how to ger the 13% = IRR. pls show step by step...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The answer is 1 day. I need to know how to solve this step by step....

    The answer is 1 day. I need to know how to solve this step by step. thank you The moon has a period of 27.3 d and is an average distance from Earth of 3.84 × 105km. A communications satellite is placed in an Earth orbit at 4.23 × 104 km from the center of Earth. What is the period of this satellite?

  • Solve step by step without excel. 13-15 The after-tax cash flows for two mutually exclusive projects...

    Solve step by step without excel. 13-15 The after-tax cash flows for two mutually exclusive projects have been esti mated, and the following information has been provided: Expected Net Cash Flows Year Machine D Machine Q $(2,500) 2,000 900 100 100 $(2,500) 1,800 1,000 900 The company's required rate of return is 14 percent, and it can get unlimited funds at that cost. What is the IRR of the better project? (Hint: Note that the better project might not be...

  • These are the correct answers. This has been graded already. I need to know how to...

    These are the correct answers. This has been graded already. I need to know how to solve this to get these correct answers.

  • Pls show step by step, on how to get the ans? 3. Simplify the following expressions:...

    Pls show step by step, on how to get the ans? 3. Simplify the following expressions: sin t t2 +2 [e' cos(3t-60)]δ(t) δ(t)-O sin t-2) d) 2-1)

  • How do you solve 10x + 5 2mod(13)? I know how to solve this without the...

    How do you solve 10x + 5 2mod(13)? I know how to solve this without the + 5 on the left hand side. But how does the approach to the problem change when you have addition or subtraction on the left side? We were unable to transcribe this imageWe were unable to transcribe this image

  • Pls solve this A standard IRR method (test f IRR dis he folloveing cash flow S....

    Pls solve this A standard IRR method (test f IRR dis he folloveing cash flow S. (10 peints) more Nkely to have a problems in which A)-CR D) in both A and B E) In boch B and C F) In boch A and C $1,000 (a fixed money) 6 (Bpoints) Assume that you can invest maximum n four projects at the same disco 150 20% 160 18% 150 19% 130 21% Project Project 2 500 Project4 A) Project I...

  • please please give step by step instructions i know answer i need know how to do...

    please please give step by step instructions i know answer i need know how to do it Let X be a uniformly distributed continuous random variable that lies between 1 and 10. i. Sketch the probability density function for X. ii. Find the formula for the cumulative distribution for X and use it to compute the probability that X is less than 6.

  • Need every step to the solution, and how you get the answer. You may know how...

    Need every step to the solution, and how you get the answer. You may know how to get it but I don't. Thanks (x+10y) in the 3. State the cross section of the surface z-f(x.y)=e' direction of x-axis passing through the point A-(1,2). Show your work

  • I KNOW THE ANSWER BUT I NEED A STEP BY STEP EXPLANATION ON HOW TO GET...

    I KNOW THE ANSWER BUT I NEED A STEP BY STEP EXPLANATION ON HOW TO GET THE ANSWER. A marketer wants to construct a 95% confidence interval for variance and is assuming that the population standard deviation for the number of energy drinks consumed each week is 1.4. The study found that for a sample of 8 teenagers the standard deviation of the number of energy drinks consumed per week is 1.3. Choose the upper and lower limits (UL and...

  • Can you please show me step by step? I am lost. I don't know where to...

    Can you please show me step by step? I am lost. I don't know where to start. I can not use excel. I have the answer. I just don't know how to get it. a 0.05 n100 40 21 |The President of UTA is interested in estimating the proportion of Statistics students who drop BUSA 3321 this semester with an UPPER ONE-TAILED 100*(1 a)% confidence interval (a is shown on right). This semester there were n students enrolled in 3321...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT