Question

Summer Manufacturing has four categories of overhead. The four categories and expected overhead costs for each...

  1. Summer Manufacturing has four categories of overhead. The four categories and expected overhead costs for each category for next year are listed as follows:
    Maintenance $255,000
    Materials handling 125,000
    Setups 30,000
    Inspection 105,000

    Currently, overhead is applied using a predetermined overhead rate based upon budgeted direct labor hours. 100,000 direct labor hours are budgeted for next year.

    The company has been asked to submit a bid for a proposed job. The plant manager feels that obtaining this job would result in new business in future years. Usually bids are based upon full manufacturing cost plus 10 percent.

    Estimates for the proposed job are as follows:
    Direct materials $15,000
    Direct labor (8,000 hours) $12,000
    Number of material moves 100
    Number of inspections 120
    Number of setups 24
    Number of machine hours 4,000

    The plant manager has heard of a new way of applying overhead that uses cost pools and activity drivers. Expected activity for the four activity drivers that would be used are:
    Machine hours 60,000
    Material moves 20,000
    Setups 3,000
    Quality inspections 12,000

    What is the total cost of the proposed job if Summer Manufacturing uses direct labor hours as its only activity driver?

    a. $53,200

    b. $72,000

    c. $56,200

    d. $68,200

0 1
Add a comment Improve this question Transcribed image text
✔ Recommended Answer
Answer #1
Maintenance $255,000
Materials handling 125,000
Setups 30,000
Inspection 105,000
Estimated Overheads $515,000

Estimated direct labor hours = 100,000

Predetermined overhead rate =  Estimated Overheads/Estimated direct labor hours

= 515,000/100,000

= $5.15 per direct labor hour

Applied overhead = Actual direct labor hour x Predetermined overhead rate

= 8,000 x 5.15

= $41,200

Direct materials $15,000
Direct labor (8,000 hours) $12,000
Applied overhead $41,200
Total Cost $68,200

Correct option is d.

Please give a positive rating if you are satisfied with this solution and if you have any query kindly ask.

Thanks!!!

Add a comment
Know the answer?
Add Answer to:
Summer Manufacturing has four categories of overhead. The four categories and expected overhead costs for each...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • Calculator Summer Marvufacturing has four categories of overhead. The four categories and expected overhead costs for...

    Calculator Summer Marvufacturing has four categories of overhead. The four categories and expected overhead costs for each category for next year are listed as follows: Maintenance Materials handling Setups Inspection $255.000 125.000 30,000 105,000 Currently, overhead is applied using a predetermined overhead tate based upon budgeted direct later hours. 100.000 direct labor hours we budgeted for next year The company has been asked to submit a bid for a proposed job. The plant manager feels that in this job would...

  • our categories of overhead. The expected overhead costs for each category for Maintenance Materials handing 26....

    our categories of overhead. The expected overhead costs for each category for Maintenance Materials handing 26. Stanford Corporation has f next year are as follows: $210,000 90,000 75,000 150,000 Setups Inspection The company has been asked to submit a bid for a proposed job. The plant manacer mbanufacturing this job would result in new business in future years. Bids are usually based upon full manufacturing cost plus 30 percent. Estimates for the proposed job are as follows: Direct materials Direct...

  • . Graham Company has two categories of overhead: maintenance and inspection. Costs expected for these categories...

    . Graham Company has two categories of overhead: maintenance and inspection. Costs expected for these categories for the coming year are as follows: Maintenance Inspection $900,000 1,500,000 The plant currently applies overhead using direct labor hours and expected capacity of 100,000 direct labor hours. The following data has been assembled for use in developing a bid for a proposed job. Additionally, the total expected machine hours for all jobs during the year are 100,000, and the total expected number of...

  • XYZ Company has two categories of overhead: maintenance and inspection. Costs expected for these categories for...

    XYZ Company has two categories of overhead: maintenance and inspection. Costs expected for these categories for the coming year are as follows: Maintenance $420,000 Inspection $600,000 The plant currently applies overhead using direct labor hours and expected capacity of 100,000 direct labor hours. The following data has been assembled for use in developing a bid for a proposed job. Bid prices are equal to the full manufacturing cost plus a 30 percent markup. Direct materials $3,500 Direct labor $6,500 Machine...

  • The Lislevand plant has two categories of overhead: maintenance and inspection. Costs expected for these categories...

    The Lislevand plant has two categories of overhead: maintenance and inspection. Costs expected for these categories for the coming year are as follows: Maintenance $121645 Inspection $184402 The plant’s expected capacity is 88283 direct labour hours. The following data has been assembled for use in developing a bid for a proposed job. Direct materials $? Direct labour $5650 Machine hours 410 Number of inspections 9 Direct labour hours 749 Total expected machine hours for all jobs during the year is...

  • A company has identified the following overhead costs and cost drivers for the coming year:              ...

    A company has identified the following overhead costs and cost drivers for the coming year:                        Budgeted   Overhead Item   Cost Driver Budgeted Cost    Activity Level   Machine setup   Number of setups $ 12,000           150           Inspection   Number of inspections 85,000         4,250           Material handling   Number of material moves 66,000         5,500           Engineering   Engineering hours 11,000         550                 Budgeted direct labor cost was $87,000 and budgeted direct material cost was $241,600. The following information was collected on...

  • A company has identified the following overhead costs and cost drivers for the coming year: (CIA...

    A company has identified the following overhead costs and cost drivers for the coming year: (CIA adapted) Overhead Item Machine setup Inspection Material handling Engineering Cost Driver Budgeted Cost Number of setups $ 20,000 Number of inspections 130,000 Number of material moves 80,000 Engineering hours 50,000 Budgeted Activity Level 200 6,500 8,000 1,000 Budgeted direct labor cost was $100,000 and budgeted direct material cost was $280,000. The following Information was collected on three jobs that were completed during the year:...

  • The Molotov plant of Kaboom Industries has two categories of overhead: maintenance and inspection. Costs expected...

    The Molotov plant of Kaboom Industries has two categories of overhead: maintenance and inspection. Costs expected for these categories for the coming year are as follows: Maintenance $50,000 Inspection $97,000 Machine Hours 49,000 hrs The plant currently applies overhead using machine hours. The following data have been assembled for use in developing a bid for a proposed job: Direct materials $500 Direct labor $2,000 Machine hours 500 Number of inspections 4 Direct labor hours 800 Using machine hours to assign...

  • Merry Co. has two major categories of manufacturing overhead: material handling and quality control. The costs...

    Merry Co. has two major categories of manufacturing overhead: material handling and quality control. The costs expected for these categories for the coming year are as follows: Material handling $120,000 Quality inspection 200,000 The plant currently applies overhead based on direct labor hours. The estimated direct labor hours are 80,000 per year. The plant manager is asked to submit a bid and assembles the following data on a proposed job: Direct materials $4,000 Direct labor (2,000 hours) 6,000 What is...

  • Catalytic Chemical Corporation has a significant level of manufacturing overhead. After preparing their budget for the...

    Catalytic Chemical Corporation has a significant level of manufacturing overhead. After preparing their budget for the next year, management expects the following overhead costs (the cost driver for each overhead cost pool is also shown): Activity Total Cost Cost Driver Maintenance $20,000 Machine hours Materials receiving 80,000 Shipments received Machine setups 50,000 # of setups Inspection 30,000 # of inspections The expected activity for the year for various cost drivers is: Direct Labor Hours 40,000 Machine Hours 20,000 Shipments Received...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT