Question

4. (15 points) Which option should be selected based on a present worth comparison at an interest rate of 10%? First cost, $
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Option Xs life is 3 years, but that of option Y is 6 years. Thus, to compare the two options, the cash flow of option X willTo find out which option should be selected, find the present worth of option Y and compare it with that of option X. Present

Add a comment
Know the answer?
Add Answer to:
4. (15 points) Which option should be selected based on a present worth comparison at an...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 4. (15 points) Which option should be selected based on a present worth comparison at an...

    4. (15 points) Which option should be selected based on a present worth comparison at an interest rate of 10%? First cost, $ Annual operating & maintenance cost, $/year Salvage value, $ Life, in years Option X -230,000 -9,000 12,000 Option Y -380,000 -12,000 140,000 6 a. Draw the cash flow diagram for Option X. b. Calculate the present worth for Option X. c. Which option should be selected? Why?

  • Your company is considering one of two product lines. Using present worth analysis, which option should be selected...

    Your company is considering one of two product lines. Using present worth analysis, which option should be selected. Assume a 6% interest rate. Both products cost $1 in material, labor and supplies are sold for $2 per unit. Option 1: A special piece of equipment is purchased for $3000 to produce the product. There is no additional maintenance or tooling required. The first year 1000 units are produced. The second year 800, the third year 600, the fourth thru tenth...

  • Use which Present worth Analysis to option should be taken Determine in 200 I Around Lake...

    Use which Present worth Analysis to option should be taken Determine in 200 I Around Lake 0 1 Under Lake (2) Length, first cost Maintenance Useful Life salvage Annual Power loss Annual Taxes 15 km $5,000/km & 200/km/yr 15 yrs $3000/km $500/pm 2 90 of First Cust 5km $25,000/km $400 /km/ur 15 yrs $5,000/km $500/km 290 of First cost * Draw CFDs & Show wa

  • For the below Me alternatives, which machine should be selected based on the future worth analysis....

    For the below Me alternatives, which machine should be selected based on the future worth analysis. MARR-10% First costs Annual cost, s/year Salvage value, $ Life, years Machine A Machine B 15000 36,202 10000 4,808 4,000 5,000 Machine C 10000 4,000 1,000 Answer the below questions: B. Future worth for machine B, FW B-

  • Question 1 A. Using Ms Excel, find out which alternative should be selected on the basis...

    Question 1 A. Using Ms Excel, find out which alternative should be selected on the basis of the Present Worth method, if the rate of interest is 8% per year. • Alternative 1: Initial purchase price = $2500000, Annual operating cost $45000 at the end of 1st year and increasing by $3000 in the subsequent years till the end of useful life, Annual income = $120000, Salvage value = $550000, Useful life = 3 years. Alternative 2: Initial purchase price...

  • 2. A company has to choose one of three different assembly methods. Method A will have...

    2. A company has to choose one of three different assembly methods. Method A will have a first cost of $30,000, an annual operating cost of $9,000, and a service life of 2 years. Method B will cost $80,000 to buy and will have an annual operating cost of $6,000 over its 4-year service life. Method C will cost $130,000 initially with an annual operating cost of $4000 over its 8-year life. Methods A and B will have no salvage...

  • show the formula   Compare the following alternatives on the basis of Present worth Analysis at an...

    show the formula   Compare the following alternatives on the basis of Present worth Analysis at an interest rate of 6% per year.|| First Cost, $ Annual Operating cost, $ /year Annual Revenues, $/year Salvage Value, $ Life years Petroleum Based Feedstock -350,000 -130,000 300,000 45,000 Inorganic Based Feedstock -120,000 -60,000 290,000 34,000 You should consider Least Common Multiple of 6 and 4) which is 12 years in your analysis instead of 4 or 6 years! Petroleum Based Feedstock Inorganic Based...

  • the present worth of the do nothing option = 0 the duration of window analysis is 15 years use this interest rate =8.32% the difference in present worth between Option A and Option B over the analysi...

    the present worth of the do nothing option = 0 the duration of window analysis is 15 years use this interest rate =8.32% the difference in present worth between Option A and Option B over the analysis window= 10.28 millions Question 6 ncorrect 0.00 points out of 1.00 You are considering two options for a production line. The expected market for the product is 15 years. IF you go forward with the project, you expect to borrow the money at...

  • QUESTION 1 i) A metallurgical engineer is considering two materials for use in a space vehicle. All estimates are made....

    QUESTION 1 i) A metallurgical engineer is considering two materials for use in a space vehicle. All estimates are made. Which should be selected on the basis of Annual worth comparison at an interest rate of 15% per year? (10) Material Y Material X First cost, $ Maintenance cost, S per year9,000 Salvage value, $ Life, years -15,000 35,000 2,000 20,000 Solution: ii) Select which alternative using AW and i= (10) 12% - per year. First Cost, $ -200,000 80,000...

  •    can you solve it by using Excel You have been asked to evaluate two alternatives,...

       can you solve it by using Excel You have been asked to evaluate two alternatives, X and Y, that may increase plant capacity for man- ufacturing high-pressure hydraulic hoses. The pa- 5.7 rameters associated with each alternative have been estimated. Which one should be selected on the basis of a present worth comparison at an inter- est rate of 12% per year? Why is yours the correct choice? Y X Alternative -58,000 -45,000 First cost, $ -4,000 -8,000 Maintenance...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT