Question
The Value of Variance

The Value of Variance, Subscribe More often than not, when we are presented with statistics we are given only a measure of ce
Example: Say you are an executive in an automobile manufacturer, and you are told that, for a particular model of new car tha
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Mean and variance is the two most commonly used method of data summarization. but if the data value is not normally distributed and it is more complex then other methods are needed to understand the data. So-

When you run the descriptive statistics, you get a lot of numbers – the sample size, average, standard deviation, range, maximum, minimum and a host of other numbers. You spy two numbers: the skewness and kurtosis. What do these two statistics tell you about your sample?

skewness and kurtosis are two commonly listed values when you run a software’s descriptive statistics function. Many books say that these two statistics give you insights into the shape of the distribution.

Skewness is a measure of the symmetry in distribution. The asymmetrical dataset will have a skewness equal to 0. So, a normal distribution will have a skewness of 0.   Skewness essentially measures the relative size of the two tails.

Kurtosis is a measure of the combined sizes of the two tails. It measures the amount of probability in the tails. The value is often compared to the kurtosis of the normal distribution, which is equal to 3. If the kurtosis is greater than 3, then the dataset has heavier tails than a normal distribution (more in the tails). If the kurtosis is less than 3, then the dataset has lighter tails than a normal distribution (less in the tails). Careful here. Kurtosis is sometimes reported as “excess kurtosis.” Excess kurtosis is determined by subtracting 3 forms the kurtosis. This makes the normal distribution kurtosis equal to 0. Kurtosis originally was thought to measure the peakedness of a distribution.   Though you will still see this as part of the definition in many places, this is a misconception

The mean and variance are raw moments, and the skewness and kurtosis are normalized/standardized moments (normalized with standard deviation). Unlike mean and variance, skewness and kurtosis are unit-free/dimensionless moments. For example, if our data is in inches (height), then mean and variance will be in inches, but skewness and kurtosis will be unit-free (not in inches). Therefore, skewness and kurtosis will not be affected by any linear change in the scale of the data (inches to the centimeter).

Add a comment
Know the answer?
Add Answer to:
The Value of Variance The Value of Variance, Subscribe More often than not, when we are...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1.3)   More often than desired, engineers are required to estimate quantities related to some aspect of...

    1.3)   More often than desired, engineers are required to estimate quantities related to some aspect of a system because the necessary data is not available. Systems engineers often have to estimate quantities related to the meta-system. There has been quite a bit of attention to estimation in K-12; a common example is to estimate the number of gas stations in the 48 continental states of the United States. a) How would you go about this? What are several ways to...

  • can you give the Answers to E,F,G,H? 2. Model : We will replace our data with...

    can you give the Answers to E,F,G,H? 2. Model : We will replace our data with a probability mass function. In other words assume we know that of all the world's beers 70% are low alcohol, 20% are medium alcohol and 10% are high alcohol. We also assume all low alcohol beers are 5.13% ABV, medium are 6.85% ABV and high is 10.20% ABV. Let X be a random variable representing the ABV of a randomly selected beer. a. (4pts)...

  • This week we have been discussing collecting data. As a consumer of data, it is important...

    This week we have been discussing collecting data. As a consumer of data, it is important to understand how readily the results of a survey or experiment can be manipulated. Consider the scenario below which data, or claims from data, can be misrepresented based on sampling bias, wording bias or exaggerated claims. Scenario 2: A large high school would like to know how many students are currently using tobacco products. Eighty students are called to the nurses office at random...

  • P value State your conclusion. Would we perform post-hoc procedures for this data? A highway safety...

    P value State your conclusion. Would we perform post-hoc procedures for this data? A highway safety institution conducts experiments in which cars are crashed into a fixed barrier at 40 mph. In the institute's 40-mph offset test, 40% of the total width of each vehicle strikes a barrier on the driver's side. The barrier's deformable face is made of aluminum honeycomb, which makes the forces in the test similar to those involved in a frontal offset crash between two vehicles...

  • ou Decide Scenario Summary Aero Motors, a subsidiary of GenMax world-wide, has a great reputation for...

    ou Decide Scenario Summary Aero Motors, a subsidiary of GenMax world-wide, has a great reputation for producing high-end, luxury cars for primarily the European and Asian markets. The flagship model, the Pinnacle, starts at $50,000 and goes up from there. While the cars enjoy a devoted following and great customer reputation in those markets, the sales of the cars have never taken off in the U.S., primarily because the cars were not attractively priced and had a very limited service...

  • For Java Program In this lab you will gain experience using all the concepts we learned...

    For Java Program In this lab you will gain experience using all the concepts we learned to this point, which include classes, methods, collections, and file input/output. Also, you will gain experience in team programming. This assignment will be completed by teams of 2. Each member must complete an equal amount of the work in order to receive credit for this assignment. You must write the programmer’s name in a comment for each method you write. You need to create...

  • Me and my friend are developing a web-app in Python + Flask + PostgreSQL. We have...

    Me and my friend are developing a web-app in Python + Flask + PostgreSQL. We have been working on it for the past few months and have developed a lot of schema/use-cases specific to Python + Flask + PostgreSQL. Now, all of a sudden, we plan to move to another NoSQL database (Neo4j) because it somehow fits better to what the core of our web-app is going to be. Python supports Neo4j through embedded/rest api bindings, but uses a technology...

  • In this question, we will think about how to answer shortest path problems where we have more than just a single sourc...

    In this question, we will think about how to answer shortest path problems where we have more than just a single source and destination. Answer each of the following in English (not code or pseudocode). Each subpart requires at most a few sentences to answer. Answers significantly longer than required will not receive full credit You are in charge of routing ambulances to emergency calls. You have k ambulances in your fleet that are parked at different locations, and you...

  • Net Present Value Analysis; Uncertain Cash Flows“I’m not sure we should lay out $500,000 for that...

    Net Present Value Analysis; Uncertain Cash Flows“I’m not sure we should lay out $500,000 for that automated welding machine,” said Jim Alder, president of the Superior Equipment Company. “That’s a lot of money, and it would cost us $80,000 for software and installation, and another $3,000 every month just to maintain the thing. In addition, the manufacturer admits that it would cost $45,000 more at the end of seven years to replace worn-out parts.” “I admit it’s a lot of...

  • Question to the Scenario below: Keeping in mind that it takes time/energy to implement systems to...

    Question to the Scenario below: Keeping in mind that it takes time/energy to implement systems to retrieve data, which HR metrics should start Paul capturing? Scenario: “John, our production numbers are getting worse,” said Roy, who is John’s manager at the small plastic molding company. “What’s going on?” “ We've laid off several people in my area,” replied John. “Can't you get them to work harder? asked Roy. “Before the layoff, we had a lot of people quitting,” said John....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT