In a series operation of 3 processes, process 1 has a finish rate of 3hrs per...

In a series operation of 3 processes, process 1 has a finish rate of 3hrs per unit, process 2 has a finish rate of 7hrs per unit, and process 4 has a finish rate of 4.5hrs per unit. The capacity of the system is what

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer: Capacity of system = 0.14 unit per hour

Explanation: The capacity of the system is the per hour production level of the slowest node. Among 1, 2 and 4, process 2 is the slowest with a duration of 7 hours in the production of one unit. The capacity of the system is 1/7 Unit per hours = 0.14 units per hour.

Add a comment
Know the answer?
Add Answer to:
In a series operation of 3 processes, process 1 has a finish rate of 3hrs per...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The following diagram shows a 4-step process that begins with Operation 1 and ends with Operation...

    The following diagram shows a 4-step process that begins with Operation 1 and ends with Operation 4. The rates shown in each box represent the effective capacity of that operation. a.  Determine the capacity of this process. b.  Which action would yield the greatest increase in process capacity: (1) increase the capacity of Operations 1 by 15 percent; (2) increase the capacity of Operations 2 by 10 percent; or (3) increase the capacity of Operations 3 by 10 percent?            12/hr.                        15/hr.                          11/hr.                             14/hr.    ?Operation 1?    ?    Operation...

  • a. A system has two processes and three identical resources. Each process needs a maximum of...

    a. A system has two processes and three identical resources. Each process needs a maximum of two resources. Is deadlock possible? Explain your answer. b. A system has 4 processes, P1 through P4, and 5 types of resources, R1 through R5. Existing resource vector E = (3, 2, 1, 2, 2) Current allocation matrix C = R1 R2 R3 R4 R5 P1 1 1 0 0 0 P2 0 0 1 0 0 P2 1 0 0 20 P4 0...

  • An ideal diatomic gas undergoes 3 processes in series: process 1-2: isothermal compression from pr-100kPa and...

    An ideal diatomic gas undergoes 3 processes in series: process 1-2: isothermal compression from pr-100kPa and V-0.1m2 to V0.025m; process 2-3: at constant pressure and process 3-1: isentropic process closing cycle. Determine: a) ratio of the maximum and minimum temperature of the cycle, b) heats of the processes, c) thermal efficiency of the cycle, d) sketch the processes on p-V and T-s diagrams. Gas constant is 287 J/(kgK), isentropic exponent is 1.4.

  • 1. A loan processing operation has a design capacity of 66 loans per day and an...

    1. A loan processing operation has a design capacity of 66 loans per day and an effective capacity of 54 loans per day. What is its utilization if it processes an average of 46 loans per day? (Your answer should be a percentage with one decimal point.) 2. The Utilitarian Principle states that the good done by an action should outweigh the harm it causes or might cause. 3. Identify the proper hierarchical sequence (first item is the most important):...

  • PA 3-3 Consider a process consisting of three... Consider a process consisting of three resources. Assume...

    PA 3-3 Consider a process consisting of three... Consider a process consisting of three resources. Assume there exists unlimited demand for the product. Resource 1 has a processing time of 2 minutes per unit. Resource 2 has a processing time of 6 minutes per unit. Resource 3 has a processing time of 4 minutes per unit. Resource 1 Resource2 Resource 3 All three resources are staffed by one worker. The flow diagram is shown above. Round "Capacity of resource" to...

  • (Process with Rework) Consider the following three-stage production process of glass ceramics, wh...

    Matching supply with Demand (3rd Edition) - Question 10.2 (Process with Rework) Consider the following three-stage production process of glass ceramics, which is operated as a worker-paced line. Q10.2 Components 6 min./unit 5 min./unit min. /unit Finished Units Rework The process is experiencing severe quality problems related to insufficiently trained work- ers. Specifically, 20 percent of the parts going through operation 1 are badly processed by the operator. Rather than scrapping the unit, it is moved to a highly skilled...

  • Part I – Process and Capacity Analysis Mortgage, Inc. processes loan applications in a “back-office” service...

    Part I – Process and Capacity Analysis Mortgage, Inc. processes loan applications in a “back-office” service facility. Each loan application must undergo a sequence of three separate processing activities before Mortgage, Inc. can make a decision to approve or decline the application. That is, a loan application first passes through Activity 1, then Activity 2, and finally Activity 3. Each activity has a fixed number of workers (given below). For example, there are three workers assigned to Activity 1 and...

  • 1. Increasing the capacity just before a bottleneck operation will improve the output of the process....

    1. Increasing the capacity just before a bottleneck operation will improve the output of the process. True or false 2. Increasing the capacity of the bottleneck resource always increases the capacity of process. True or false 3. If the process has an average inventory of 5 units and the flow time is 1 hr, than the actual cycle time is 12 minutes. True or false

  • ​A plant operation has fixed costs of $2,000,000 per year

    A plant operation has fixed costs of $2,000,000 per year, and its output capacity is 100,000 electrical appliances per year. The variable cost is $40 per unit, and the product sells for $90 per unit. a. What is the break-even point in terms of units? b. What is the break-even point in terms of dollars? c. How much capacity has been used? d. If the variable cost is increased to $55, what is the percent reduction (or increase) to the profit? What is the...

  • A plant operation has fixed costs of $2,000,000 per year, and its output capacity is 100,000 electrical appliances per year. The variable cost is $40 per unit, and the product sells for $90 per unit.

    A plant operation has fixed costs of $2,000,000per year, and its output capacity is 100,000 electricalappliances per year. The variable cost is $40 per unit, andthe product sells for $90 per unit.a. Construct the economic breakeven chart.b. Compare annual profit when the plant is operatingat 90% of capacity with the plant operation at 100%capacity. Assume that the first 90% of capacity outputis sold at $90 per unit and that the remaining 10% ofproduction is sold at $70 per unit.

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT