CONCRETE COLUMN

TIMBER COLUMN

STEEL COLUMN

phases criteria for concrete column :-

1. column layout 2.column reinforcement work 3. formwork 4. pourong of concrete

phases criteria for Timber column :-

Architect Design Engineer Form-finding Detailed design Contractor Structural analysis Carpenter Scaffolding Site prepration C

phases criteria for steel column :-

1. Concept Design 2. Design Development 3. Detailed Design 4. Shop Drawings 5. Pre-Erection

6. Fabrication and Transportation 7. Daily Erection

Add a comment
Know the answer?
Add Answer to:
hi,i want 1 picture of construction phases and phases criterias of the following columns: concrete columns,timber...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Hi ,i want real life photos exaples of the following please: A:Columns: 1-Reinforced Concrete column 2-Steel...

    Hi ,i want real life photos exaples of the following please: A:Columns: 1-Reinforced Concrete column 2-Steel column 3-Timber column i want 1 picture of each , with construction phases photo ,and their construction phase criterias photos. :all explained by building site photos B:Shear (Load-bearing Walls): photo Examples of construction phases ,and their construction phase criterias: explained by photos C:Structural and Non-structural wall photos examples Note: please i want real life building site photos,thank you 1-pictures of (A):each type of the...

  • An old existing timber bridge with a concrete deck is currently in service in the south west of W...

    An old existing timber bridge with a concrete deck is currently in service in the south west of Western Australia. It has been proposed to increase the strength of the bridge by adding steel plates to the timber beams to enable larger trucks to use the road on which the bridge is located. The existing bridge has 460* 100mm timber beams at 1.8 metre centres. The concrete deck (which is fixed to the timber beams to enable composite action) is...

  • An old existing timber bridge with a concrete deck is currently in service in the south...

    An old existing timber bridge with a concrete deck is currently in service in the south west of Western Australia. It has been proposed to increase the strength of the bridge by adding steel plates to the timber beams to enable larger trucks to use the road on which the bridge is located. The existing bridge has 460* 100mm timber beams at 1.8 metre centres. The concrete deck (which is fixed to the timber beams to enable composite action) is...

  • connected to the advantages, i que 2. Why is fireproofing used in a steel frame construction?...

    connected to the advantages, i que 2. Why is fireproofing used in a steel frame construction? Why is it not used on a concrete frame? 3. What are the advantages of a flat roof design? What are the disadvantages? What materials are used in flat roof construction? 4. How is precast concrete used in roofing systems? How is a roof made waterproof? Why is aggregate used on flat roofs? 5. What materials are used for formwork for columns? How are...

  • I know how to solve it but i want to know what if the equation HI...

    I know how to solve it but i want to know what if the equation HI (g) 1/2 H2(g) + 1/2 I2(g) did not have 1/2 instead it had 3 or 2 how would the calculation change? The value of Keq for the equilibriumH2(g) + I 2(g)= 2 HI (g) is 794 at 25°C. At this temperature, what is the value of Keq for the equilibrium below? HI (g) 1/2 H2(g) + 1/2 I2(g) A.0.035 B.0.0013 C.28D.397E.1588

  • Hi...please I want the solution of this problem of steel design of civil Engineering by using...

    Hi...please I want the solution of this problem of steel design of civil Engineering by using ACI_318 Amarican code Example: At a certain section in the cover plated beam of figure shown, the external factored shears are Vu=275k. Determine the spacing required for (7/8)in A325 bolts used in a bearing type connection. Assume that the bolt threads are excluded from the shear plane (A325-X), the edge distance is 3.5in, Fy=50ksi, and Fu=65 ksi. Deformation at bolt holes is a design...

  • 1. (i) For the lightweight concrete consider the following statements. I. Light weight concrete improves the...

    1. (i) For the lightweight concrete consider the following statements. I. Light weight concrete improves the thermal properties of the structure. II. Lightweight concrete reduces the fire resistance for the (a) Both I and II are true. (b) Both I and II are false (c) Statement I is true and statement II is false. (d) Statement II is true and statement I is false. (ii) Determine the net vertical deflection at the free end for a cantilever carries a UDL...

  • 4. A two story office building has interior columns spaced 25 ft apart in two perpendicular...

    4. A two story office building has interior columns spaced 25 ft apart in two perpendicular directions. The columns are fixed at the roof, the second floor and the ground floor in both directions. Consider the dead load (4 inch-thick reinforced concrete slab at the roof and 6 inch thick reinforced concrete slab at the floor) as well as appropriate live load. Ignore other dead weight other than shown. Determine the following using A992 steel: (20 points) 1) Dead load...

  • Idaho Lumber Company grows, harvests, and processes timber for use in construction. The following data pertain...

    Idaho Lumber Company grows, harvests, and processes timber for use in construction. The following data pertain to the firm's sawmill during November. $ 92,200 130,400 Work in process, November 1 Direct material Conversion Costs incurred during November Direct material Conversion $448,000 963,000 The equivalent units of activity for November were as follows: 7,300 equivalent units of direct material and 2,200 equivalent units of conversion activity. Required: Calculate the cost per equivalent unit, for both direct material and conversion, during November....

  • Idaho Lumber Company grows, harvests, and processes timber for use in construction. The following data pertain...

    Idaho Lumber Company grows, harvests, and processes timber for use in construction. The following data pertain to the firm's sawmill during November. $ 86,700 121,000 Work in process, November 1 Direct material Conversion Costs incurred during November Direct material Conversion $382,500 525,000 The equivalent units of activity for November were as follows: 6,800 equivalent units of direct material and 1,700 equivalent units of conversion activity. Required: Calculate the cost per equivalent unit, for both direct material and conversion, during November....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT