2)
Let, speed of motorboat in still water is k mph
Then for upstream rate is (k-4) mph & for returning rate is (k+4) mph.
So, for going in 30 minutes it goes 30(k-4)/60 mile = (k-4)/2 mile
For returning in 18 minutes it goes 18(k+4)/60 mile = 3(k+4)/10 mile
Accordingly , (k-4)/2 = 3(k+4)/10
Or, 10k - 40 = 6k + 24
Or, 4k = 64
Or, k = 16
So, speed of motorboat in still water is 16 mph.
So, rate in upstream is 12 mph and downstream is 20 mph.
Upstream take 30 minutes and downstream takes 18 minutes
Both cover the distance 6 mile. ( By putting k value in
upstreams and downstream goes distance).
2. A motorboat travels 30 min upstream against a 4-mph current. Returning with current takes 18...
the A motorboat travels 156 kilometers in 3 hours going upstream. It travels 204 kilometers going downstream in the same amount of time. What is the rate boat in still water and what is the rate of the current? kom Rate of the boat in still water 5 2 Rate of the current:
A small motorboat travelled downstream for 8 hours with a 1 km/h current to reach a campsite. The return trip against the same current took 9 hours. Find the speed of the motorboat in still water. Instructions: Enter your answer as a whole number, fraction or radical. When entering units, type without capitals, eg km/h, mph, feet, meters, yards, etc The speed of the motorboat in still water is Number Units
Solve the following using the 5-step process. The speed of a freight train is 75 mph slower than the speed of a passenger train. The freight train travels 340 miles in the same time that it takes the passenger train to travel 490 miles. Find the speed of each train. Instructions: Enter your answer as a whole number, fraction, or radical. When entering units, type without capitals e.g. mph, feet, meters, yards, etc. The freight train is travelling at Number...
1. A proton travels directly (head on) towards a stationary lead nucleus, with an initial speed v0, when the proton is a distance x0 from the nucleus. It undergoes an acceleration of magnitude a = kx−2 directed away from the nucleus, where x is the distance from the proton to the nucleus and k is a positive constant. (Assume the lead nucleus remains stationary throughout.) (a) Give an expression for how the velocity of the proton depends on x. (It...