Question

The installation cost of a 20 m3 (cubic meter) stainless-steel tank in 1975 was $5000. The tank is cylindrical with flat top and bottom, and the diameter is 6 m. If the entire outer surface of the tank is to be covered with 2-in. thickness of Magnesia block, estimated the present total cost for the insulated tank at 1980. The cost for the 2-in. magnesia block was $1.40 per m2 (square meter) while the labor for installing the insulation was ?($3.00 per m2 (square meter) (1980

يجب اخذ ثلاث مراتب بعد الفارزة في النواتج The installation cost of a 20 m3 (cubic meter) stainless-steel tank in 1975 was $50

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Solution 7 V= 20m² d =6m In 1975 Cost = $5 5000 In 1975 Cost Andex= 444 # In 1980 Cost Index = 560 # V = I d²h as A d² h 20m*# Total cost in 1975 Cost Index in 1975 Total cost in 1980 1975 (1980 Cost Index în 1980 $53075 444 560 C1980 Answer C1980 =

In case of any doubt or you need any further help regarding this solution please comment below.

Thank you..........

Add a comment
Know the answer?
Add Answer to:
The installation cost of a 20 m3 (cubic meter) stainless-steel tank in 1975 was $5000. The...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • (The installation cost of a 20 m3 (cubic meter) stainless-steel tank in 1975 was $5000. The...

    (The installation cost of a 20 m3 (cubic meter) stainless-steel tank in 1975 was $5000. The tank is cylindrical with flat top and bottom, and the diameter is 6 m. If the entire outer surface of the tank is to be covered with 2-in. thickness of Magnesia block, estimated the present total cost for the insulated tank at 1980. The cost for the 2-in. magnesia block was $1.40 per m2 (square meter) while the labor for installing the insulation was...

  • Engineering economics I need a solution within half an hour The installation cost of a 20...

    Engineering economics I need a solution within half an hour The installation cost of a 20 m3 (cubic meter) stainless- steel tank in 1975 was $5000. The tank is cylindrical with flat top and bottom, and the diameter is 6 m. If the entire outer surface of the tank is to be covered with 2-in. thickness of Magnesia block, estimated the present total cost for the insulated tank at 1980. The cost for the 2-in. magnesia block was $1.40 per...

  • This question concerns the Engineering economics I needed the solution within half an hour يجب اخذ...

    This question concerns the Engineering economics I needed the solution within half an hour يجب اخذ ثلاث مراتب بعد الفارزة في النواتج. The installation cost of a 20 m3 (cubic meter) stainless-steel tank in 1975 was $5000. The tank is cylindrical with flat top and bottom, and the diameter is 6 m. If the entire outer surface of the tank is to be covered with 2-in. thickness of Magnesia block, estimated the present total cost for the insulated tank at...

  • summarizr the followung info and write them in your own words and break them into different...

    summarizr the followung info and write them in your own words and break them into different key points.   6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...

  • summatize the following info and break them into differeng key points. write them in yojr own...

    summatize the following info and break them into differeng key points. write them in yojr own words   apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT