1. For this question, you will review a process, identify problem areas ( such as wastes, cycle time inefficiencies, etc), and suggest an improved process. Open and read the Process Improvement (Final Q 1)
document which describes the process steps in words and also includes a process map as a visual tool for understanding what's going on in each step. You will need to respond to the following three subquestions:
a. Of the 9 process steps in the Process Improvement (Final Q 1) document, which specific steps in that process are experiencing lean wastes and/or process cycle time issues (please note, there is more than one step experiencing issues). In your response, name the process step, and/or the transfer interface between steps, and what waste(s) or cycle time issue is involved. Be sure to use standard lean/six sigma terminology that we used in the course when referring to any of the quality concepts; e.g., transportation waste when referring to situations involving a lot of moving around from one place to another. When writing about a lean waste, this would be excellent place for including your citation reference for question 1.
b. Which of the process steps you identified in part a do you believe could benefit from process improvement and why?
c. What changes would you institute in the process to improve the steps you cited in part b of this question and describe how those changes improves the process. Be specific about which process step(s) your improving and thoroughly describe the improvement to that step. [Note: This question ties to what you decided was important in part b question above.] Also, when answering how you would improve a given process step, assume you have an unlimited budget and personnel resources and you can do mostly anything you want as long as it doesn't violate the laws of physics or the judicial system. Be cautious though because process improvement is designed to save time, money, and resources in doing the needed work.For example, automation is good, and also potentially expensive, so is it worth it for the improvement? - you will have to be the judge of that.
Answer :
Steps to improve a process as below-
1. Select the process- Select the process which we want to improve or which in the bottleneck process for the plant.
2. Establish the objective to achieve- Set the proper Objective like- improve the productivity, Reduce the rejection level etc.
3. Understand the current process. - Break down each process operation in very minuet information.
4. Measure the current state. – Measure the information in quantity like -%, PPM, Downtime %.
5. Analysis Data and develop the plan. – According analyse the data and develop the plan
6. Simplify the process. - Understand the process step and try to eliminate the unnecessary activity.
7. Implement change / Plan. - Implement he change and inform the stack holder for change.
8. Test the change and collect data. - Check the change for its benefits and collect data.
9. Standardize the process – After improvement established make the standardization by update the process document like work instruction, process sheet, control plan etc.
Answer a)
We take on example of a manufacturing process plant.

Step 1- Improve the productivity and achieve new take time 78 sec for customer demand.
Step 2 – Set the objectives-
· Improve the Productivity by 20%.
· Improve the OEE( overall equipment efficiency) from 10 % to 80 %.
Step 3- Understand the Process and Step 4 Measure the data


Step 5 – Analyse the data and develop the plan
When we put the data into the line balancing graph, we identify the bottleneck operation of the process in grinding operation

Waste available in grinding Operation -
· Defect – defect rate is high.
· Down time of process in high.
· Non value add time -Inspection time is high.
· Non value add time -100 % Inspection. As defect rate is high.
Action Plan-
· Project 1- Project given to maintenance team to improve the Uptime of grinding process.
· Project 2- Manufacturing team to reduce the rejection rate.
· Project 3- Quality – reduce inspection by introduce in process inspection.
In process inspection – in this process part check during process itself in machine, one additional gauge integrates with machine.by this out side 100 % inspection we can eliminate.
Answer b) :
We step 5 of process improvement we identify the 3 projects by we can reduce the waste of process and achieve the required take time of process.
Answer c) :
In step 6 and Step 7 – we do the require change in process to reduce the process waste.
The improvement action points come from project 1 and project 2 need to implement in this step.
Incorporate the in-process inspection in grinding operation. By this we can reduce unnecessary inspection
In step 8 – Test the improvement of process and verify for some time.
By putting action plan the grinding process cycle time reduce from the take time, so the process can capable to achieve new set targets.
Step 9 – Standardize the process-
Need to update the process control plan according to the project outcome,
Update the work instruction where applicable.
Recognize the Team for their effort.
_____________________________________________________________
Please Please up vote this answer. Your up vote is so valuable to me. Please. Thank you so much.
1. For this question, you will review a process, identify problem areas ( such as wastes,...
1. For this question, you will review a process, identify problem areas ( such as wastes, cycle time inefficiencies, etc), and suggest an improved process. Open and read the Process Improvement (Final Q 1) document which describes the process steps in words and also includes a process map as a visual tool for understanding what's going on in each step. You will need to respond to the following three subquestions: a. Of the 9 process steps in the Process Improvement...
1. For this question, you will review a process, identify
problem areas ( such as wastes, cycle time inefficiencies, etc),
and suggest an improved process.
the document which describes the process steps in words and also
includes a process map as a visual tool for understanding what's
going on in each step. You will need to respond to the following
three sub-questions:
A. Of the 9 process steps in the Process Improvement (Final
Q 1) document, which specific steps in...
Referencing Figure 6.1: "Ten process design and improvement steps"
on page 74 of the textbook, select one of the four defined phases.
Use a business process example you are familiar with to explain the
steps of the phase to a new hire on your team by describing how to
perform each step in the identified example.
4:36 Aa 7» Q R 74 The ITSM Process Design Guide Maturity Assessments and Metrics performance and Continual Process Improvement Requirements Definition Requirements Definition...
Interview QUESTION 1. Describe a time when you attempted to improve a process or procedure and you were met with resistance. How did you handle it? 2. Tell me about a time when your diplomacy skills were really put to the test.
Please read the opening vignette about Community Medical Center
in Missoula. How have they used lean management approaches to
efficiently utilize resources (human resources and processes),
eliminate waste, incorporate Total Quality Management, and also
motivated the Respect for People
I have uploaded the figures from 10.1 to 10.6 to give you more
details. Please use them when explaining the question. Thank
you!
Orthopedic surgeon Doug Woolley was frustrated. A bottleneck in the recovery room at the Community Medical Center in...
Please read the opening vignette about Community Medical Center
in Missoula. How have they used lean management approaches to
efficiently utilize resources (human resources and processes),
eliminate waste, incorporate Total Quality Management, and also
motivated the Respect for People
I have uploaded the figures from 10.1 to 10.6 to give you more
details. Please use them when explaining the question. Thank
you!
Orthopedic surgeon Doug Woolley was frustrated. A bottleneck in the recovery room at the Community Medical Center in...
Buckeye Technologies is a manufacturer of semiconductors for mobile consumer electronic devices, such as laptop computers, smart phones, and digital cameras. Ms. Sabina Norton has been working at Buckeye Technologies for about a year as a production manager. The volatile demand of the semiconductor industry has been an obstacle in designing an accurate production schedule. The unstable demand causes the company to carry high amounts of safety stock and incur other types of wastes. Sabina is wondering if the operation...
Create a flow chart that sets out the steps to develop a service agreement. For each step, describe any areas you might use negotiation to develop an agreement more suitable for each party’s needs. (1–2 pages) ( your response needs to relate to the steps in developing a service level agreement, eg. Step 1 - Identify neeeds and expectations of customers Step 2 - define service levels ..... Also explain as part of your answer where negotiation can assist during...
Bakground: Duraweld is a British plastic binding manufacturer established in 1959 and the result of a merger between two local small and medium enterprises (SMEs) in 1970. This company has sailed through the recent economic downturn and has reinvented itself thanks to following lean principles. Duraweld produces customized plastic elements, such as stationery, and decided to move away from standardization to resist the growing competition from Asia on higher volume items resulting in low volume/high variety production profile. Their website...