

i need the answers to all four of the problems. 1. A slot is milled the...
using this page for the final answers of the following
problems i need the right answer using these letters
problem 3
problem 4
problem 9
Your Answers will be graded based on this page only; any other solutions anywhere else will not be taken into consideration! Select the correct answer from all letters (a,b,c,d,e,f) and write the correct letter only in this column Question No. Select your answer from (a,b,c,d,e,f) and write your selection letter in the right column Write...
Properties for all problems Sut = 80 ksi, 5= 60 ksi, Sf = 40 ksi, q=0.85 (notch sensitivity), steel E = 30e6 psi Remember we use Modified-Goodman for all calculations Problem 1 A 1-inch diameter rod that is 8 inches long has a bearing at one end and another bearing at 6 inches (treat bearings as simple supports). A vertical load is applied at the end of the overhanging rod and a torque is transmitted through the length of the...
i need the answers to all four of the problems
AaBbCcl AaBbc AaBbCdAaBbcc AaBbCcD Emphasis Heading 1 Normal Strong Subtitle G Paragraph Styles 15. The address is a format for writing programs. a. Block b. Line c. Code d. Word 16. A is composed of words that represent a complete command to the CNC machine. a. Block b. Line c. Code d. Word 17. The distance from the bottom of the tool to the part Zo reference plane with the...
Question 1 2) Manufacturing processes can be classified into 2 (Two) major groups. Briefly describe the characteristics of each group. Aid your answer with hierarchy. (10 marles) 1) Sand casting is a process for casting metal in sand molds. Explain FIVE (3) sand casting benefits to the industry (marks) Riser, also known as feeder, is an important part in a sand mold. Briefly describe the function of a riser in a sand casting mold Hence, illustrate the possible types and...
i need the answers to all four of the problems.
9. Machine operator completes a job in 85% of the estimates time. The estimated time is 10.8 hours. How many hours does the job actually take? a. 9.18 b. 9.55 c. 9.79 d. 10.11 10. How many pounds of manganese bronze can be made with 876.0 pounds of copper if the manganese bronze is to contain 56% copper by weight? Round the answer to the nearest whole pound a. 1,428...
I need help with question 1 and 2, can anyone help me please. 1. steel wire is used to attach a balloon on a solar panel boom so that the actuators can be tested. Actuators are the devices that re used to extend the panels from their slowed position during launch to their final extended on- orbit configuration. The balloon must be filled with Helium gas such that the weight of the panels is balanced. Solar panels and their booms...
Question 1 A turning operation is carried out on aluminum. Based on the specific energy values in Table 20.2, determine material removal rate and cutting power in the operation under the following sets of cutting conditions: (a) Cutting speed 5.6 m/s, feed 0.25 mm/rev, and depth of cut 2.0 mm; and (b) cutting speed- 1.3 m/s, feed 0.75 mm/rev, and depth 4.0 mm. Question 2 Consider a turning operation performed on steel whose hardness 225 HB at a cutting speed...
I need ALL answers #1-6
please!!!!
College Physics 1 - Homework L Questions F 1. Two objects moving horizontally on a frictionless surface at the same initial speed collide and stick together as shown to the right. Object 1 is less massive than object 2. Which of the five post- collision paths are possible for this combined mass? Explain. 2. A turntable is rotating at 45 rpm when the power is turned off. If it rotates through 45° as it...
i only need help with Q3
CEE 216 Civil Engineering Materials Steel 1. A 32-mm rebar with a gauge length of 200 mm was subjected to tension to fracture according to ASTM E-8 method. The load and deformation data collected are shown in Table 1. Create a spreadsheet to complete the following. Table 1. Load and displacement data for a 32-mm rebar sample subjected to an increasing tensile load a. Create a plot of stress-strain. Label the axes and show...
Hydrology ENV 321 Homework #1 Due: Friday, September 6 at 1:00pm 1. Convert (show all conversion steps for full credit; convert only one unit for cach step as demonstrated in class): a) acre-feet/day to mgd (mgd is million gallons per day] b) cfs to cms c) inches/hr rainfall to mm/day rainfall d) short tons/acre-day to Mg/hectare-year [Mg is megagrams e) inches"F to cm/ C [be careful, this one may trick you] 2. Define the hydrologic cycle component and indicate how...