Kim's Asphalt does driveway and parking lot resurfacing work for
large commercial clients as well as small residential clients. An
inventory of materials and equipment is on hand at all times so
that work can start as quickly as possible. Special equipment is
ordered as required. On May 1, the Materials and Equipment
Inventory account had a balance of $40,000. The Work-in-Process
Inventory account is maintained to record costs of work not yet
complete. There were two such jobs on May 1 with the following
costs.
| Job 27 Highlands Mall |
Job 33 Pine Ridge Estates |
|||||
| Materials and equipment | $ | 15,975 | $ | 52,900 | ||
| Direct labor | 13,900 | 26,450 | ||||
| Overhead (applied) | 4,170 | 7,935 | ||||
Overhead has been applied at 30 percent of the costs of direct labor.
During May, Kim's Asphalt started two new jobs. Additional work was
carried out on Jobs 27 and 33, with the latter completed and billed
to Pine Ridge Estates. Details on the costs incurred on jobs during
May follow.
| Job | 27 | 33 | 34 | 35 | ||||||||
| Materials and equipment | $ | 3,400 | $ | 5,200 | $ | 5,000 | $ | 3,300 | ||||
| Direct labor (wages payable) | 4,900 | 7,150 | 6,300 | 2,000 | ||||||||
Other May Events
| Property taxes | $ | 590 | |
| Storage area rental | 715 | ||
| Truck and delivery cost | 360 | ||
| Advertising and promotion campaign | 640 | ||
| Inspections | 240 | ||
| Telephone and other miscellaneous | 365 | ||
| Equipment depreciation | 490 | ||
Required:
a. Prepare journal entries to record the flow of costs for operations during May.
b. Calculate the amount of over- or underapplied overhead for the month.
c. Determine inventory balances for Materials and Equipment Inventory and Work-in-process inventory.



Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An Inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $47,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An Inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $38,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $45,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...
Kim’s Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of raw materials is on hand at all times so that work can start as quickly as possible. On May 1, the Raw Materials inventory account had a balance of $24,000. As of May 1, the Work In Process (WIP) inventory account had two jobs not yet complete with the following costs: Job 27 Highlands Mall Job 33 Pine...
Problem 7-60 (Static) Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $36,000. The Work-in-Process Inventory account is maintained to record...
Problem 7-53 Show Flow of Costs to Jobs
I am having a hard time figuring out the 8th and 9th journal
entry. Please show work :)
Problem 7-53 Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is...
Pedriani Company uses a job order cost system and applies overhead on the basis of direct labor hours. On Jan01, 2017, Job No. 25 was the only job in process. Costs incurred prior to Jan01 on this job were as follows: direct materials $10,000; direct labor $6,000; and manufacturing overhead $9,000. Job No. 23 had been completed at a cost of $42,000 and was part of finished goods inventory. There was a $5,000 balance in the Raw Materials Inventory account. During the...
Post the entries to Work in Process Inventory, and prove the
agreement of the control account with the job cost sheets.
Exercise 15-02 a-b (Video) (Part Level Submission) Bonita Company uses a job order cost system. On May 1, the company has a balance in Work in Process Inventory of $3,890 and two jobs in process: Job No. 429 $2,540, and Job No. 430 $1,350. During May, a summary of source documents reveals the following. Materials Labor Time Job Number...
THIS QUESTION HAS MULTIPLE STEPS.
1) Pedriani Company uses a job order cost system and applies
overhead on the basis of direct labor hours. On Jan01, 2017, Job
No. 25 was the only job in process. Costs incurred prior to Jan01
on this job were as follows: direct materials $10,000; direct labor
$6,000; and manufacturing overhead $9,000. Job No. 23 had been
completed at a cost of $42,000 and was part of finished goods
inventory. There was a $5,000 balance...
On March 1 a dressmaker starts work on three custom- designed wedding dresses. The company uses job order costing and applies overhead to each job (dress) at the rate of 40% of direct materials costs. During the month, the jobs used direct materials as shown below. Job 1 $5 000 Job 2 $7000 Job 3 $1.500 Direct materials used During the month, the jobs used direct labor as shown below. Jobs 1 and 3 are not finished by the end...