Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...

Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $40,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on May 1 with the following costs.

Job 27
Highlands Mall
Job 33
Pine Ridge Estates
Materials and equipment $ 15,975 $ 52,900
Direct labor 13,900 26,450
Overhead (applied) 4,170 7,935

Overhead has been applied at 30 percent of the costs of direct labor.


During May, Kim's Asphalt started two new jobs. Additional work was carried out on Jobs 27 and 33, with the latter completed and billed to Pine Ridge Estates. Details on the costs incurred on jobs during May follow.

Job 27 33 34 35
Materials and equipment $ 3,400 $ 5,200 $ 5,000 $ 3,300
Direct labor (wages payable) 4,900 7,150 6,300 2,000

Other May Events

  1. Received $12,900 payment on Job 24 delivered to customer in April.
  2. Purchased materials and equipment for $9,800 on account.
  3. Billed Pine Ridge Estates $134,000 and received payment for $95,000 of that amount.
  4. Determined that payroll for indirect labor personnel totaled $690.
  5. Issued supplies and incidental materials for current jobs costing $195.
  6. Recorded overhead and advertising costs for the operation as follows (all cash except equipment depreciation).
Property taxes $ 590
Storage area rental 715
Truck and delivery cost 360
Advertising and promotion campaign 640
Inspections 240
Telephone and other miscellaneous 365
Equipment depreciation 490

Required:

a. Prepare journal entries to record the flow of costs for operations during May.

b. Calculate the amount of over- or underapplied overhead for the month.

c. Determine inventory balances for Materials and Equipment Inventory and Work-in-process inventory.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Page Yourvo May 1. Trading Alo 4avo to opening stock e To wip (being bal. brought for card) Bank Mc, enthomer se To Iob 24) (Date: Page no 640 360 1320 2910 490 490 340 490 590 Property Tax Ac D 590 Adverelizing expensy Ale M Transportation exp. AlcDate: Page no (b) overhead Previously on sols :- $12105 Jolyt Job 33 $4170 $ 79 35 Total 3- m M expenses May on previous & ne

Add a comment
Know the answer?
Add Answer to:
Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...

    Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An Inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $47,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...

  • Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...

     Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An Inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $38,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...

  • Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...

    Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $45,000. The Work-in-Process Inventory account is maintained to record costs of work not yet complete. There were two such jobs on...

  • Kim’s Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as...

    Kim’s Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of raw materials is on hand at all times so that work can start as quickly as possible. On May 1, the Raw Materials inventory account had a balance of $24,000. As of May 1, the Work In Process (WIP) inventory account had two jobs not yet complete with the following costs: Job 27 Highlands Mall Job 33 Pine...

  • Problem 7-60 (Static) Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway...

    Problem 7-60 (Static) Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is ordered as required. On May 1, the Materials and Equipment Inventory account had a balance of $36,000. The Work-in-Process Inventory account is maintained to record...

  • Problem 7-53 Show Flow of Costs to Jobs I am having a hard time figuring out...

    Problem 7-53 Show Flow of Costs to Jobs I am having a hard time figuring out the 8th and 9th journal entry. Please show work :) Problem 7-53 Show Flow of Costs to Jobs (LO 7-2, 3) Kim's Asphalt does driveway and parking lot resurfacing work for large commercial clients as well as small residential clients. An inventory of materials and equipment is on hand at all times so that work can start as quickly as possible. Special equipment is...

  • Pedriani Company uses a job order cost system and applies overhead on the basis of direct...

    Pedriani Company uses a job order cost system and applies overhead on the basis of direct labor hours. On Jan01, 2017, Job No. 25 was the only job in process. Costs incurred prior to Jan01 on this job were as follows: direct materials $10,000; direct labor $6,000; and manufacturing overhead $9,000.  Job No. 23 had been completed at a cost of $42,000 and was part of finished goods inventory.  There was a $5,000 balance in the Raw Materials Inventory account. During the...

  • Post the entries to Work in Process Inventory, and prove the agreement of the control account...

    Post the entries to Work in Process Inventory, and prove the agreement of the control account with the job cost sheets. Exercise 15-02 a-b (Video) (Part Level Submission) Bonita Company uses a job order cost system. On May 1, the company has a balance in Work in Process Inventory of $3,890 and two jobs in process: Job No. 429 $2,540, and Job No. 430 $1,350. During May, a summary of source documents reveals the following. Materials Labor Time Job Number...

  • THIS QUESTION HAS MULTIPLE STEPS. 1) Pedriani Company uses a job order cost system and applies...

    THIS QUESTION HAS MULTIPLE STEPS. 1) Pedriani Company uses a job order cost system and applies overhead on the basis of direct labor hours. On Jan01, 2017, Job No. 25 was the only job in process. Costs incurred prior to Jan01 on this job were as follows: direct materials $10,000; direct labor $6,000; and manufacturing overhead $9,000. Job No. 23 had been completed at a cost of $42,000 and was part of finished goods inventory. There was a $5,000 balance...

  • On March 1 a dressmaker starts work on three custom- designed wedding dresses. The company uses...

    On March 1 a dressmaker starts work on three custom- designed wedding dresses. The company uses job order costing and applies overhead to each job (dress) at the rate of 40% of direct materials costs. During the month, the jobs used direct materials as shown below. Job 1 $5 000 Job 2 $7000 Job 3 $1.500 Direct materials used During the month, the jobs used direct labor as shown below. Jobs 1 and 3 are not finished by the end...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT