Solution
a. Cost of Labour per Hour $10
Time of Worker 1: Steps 1 & 2: 30sec & 25sec =55 sec
Time of Worker 2: Steps 3 & 4: 35sec & 25sec =60 sec
Time of Worker 3: Step 5 : 25sec =25 sec
Time of Worker 4: Step 6 : 50sec =50 sec
Time of Worker 5: Step 7 : 40sec =40 sec
Total Time for manufacturing a bicycle= 55+60+25+50+40=230secs
if $10 is for 1 hour = 60 min =60*60 = 3600 secs
then for 230 secs =10/3600*230 = $ .64 per unit of bicycle
Thus Cost of direct labour per unit of bicycle = $ .64
b. Time required for 1 bicycle: 230 secs
No. of bicycles in 1 hour or 3600secs=1/230*3600=15.65 = 15 approx.
Selling Price of 15 Bicycle = $6*15 =$ 90
Less: Direct Labour per hour =$ 10
: Sourced Part for 15 Bicycle. = $1*15 =$ 15
: Fixed Cost per hour i.e.for 15 Bicycle. =$
Help Save Saw Homework Asas Inc. is a toy bicycle manufacturing company producing a five-inch small...
Atlas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: Step 1 (30 sec.): The plastic tube for the frame is cut to size. Step 2 (20 sec.): The tube is put together. Step 3 (35 sec.): The frame is...
Atlas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: • Step 1 (25 sec.): The plastic tube for the frame is cut to size. • Step 2 (25 sec.): The tube is put together. • Step 3 (20 sec.):...
Atlas Inc. is a toy bicycle manufacturing company producing a five inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: Step 1 (50 sec.): The plastic tube for the frame is cut to size. Step 2 (40 sec.): The tube is put together. Step 3 (55 sec.): The frame...
PowerToys Inc. produces a small remote-controlled toy truck on a conveyor belt with nine stations. Each station has, under the current process layout, one worker assigned to it. Stations and processing times are summarized in the following table: Station Task Processing Times (seconds) 1 Mount battery units 70 2 Insert remote control receiver 80 3 Insert chip 90 4 Mount front axle 60 5 Mount back axle 65 6 Install electric motor 50 7 Connect motor to battery unit 75...
A company produces gold picture frames. The cost per
picture frame is:
Materials
$9
Packaging
$1
Decorations on the frame
$5
Shipping and
handling
$1.5
Each worker earns $30,000 annually in salary
and benefits. The number of workers changes based on the level of
production. This means this is a variable cost.
The artist who creates the designs on the picture frames is paid
$25,000 annually. Senior management are paid a
total of $200,000 annually. Other
annual costs are:...
manufacturing plng/ control
1. Suppose that your company sells a product for which the annual demand is 10,000 units. Holding costs are $1.00 per unit per year, and setup costs are $200 per order (a) What is the economic order quantity for your product? (b) What will be the annual total cost holding and ordering? 2. A company has currently 100 workers. A worker works 40 hours a week, and can at most work 20 hours of overtime per week....
TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company's products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2,380 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...
TufStuff, Inc., sells a wide range of drums, bins, boxes, and
other containers that are used in the chemical industry. One of the
company’s products is a heavy-duty corrosion-resistant metal drum,
called the WVD drum, used to store toxic wastes. Production is
constrained by the capacity of an automated welding machine that is
used to make precision welds. A total of 2,240 hours of welding
time is available annually on the machine. Because each drum
requires 0.4 hours of welding...
TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company’s products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2,120 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...
TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company’s products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2,220 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...