a.  Cost of Labour per Hour $10

Time of Worker 1: Steps 1 & 2: 30sec & 25sec =55 sec

Time of Worker 2: Steps 3 & 4: 35sec & 25sec =60 sec

Time of Worker 3: Step   5 : 25sec =25 sec

Time of Worker 4: Step 6 : 50sec =50 sec

Time of Worker 5: Step 7 : 40sec =40 sec

Total Time for manufacturing a bicycle= 55+60+25+50+40=230secs

if $10 is for 1 hour = 60 min =60*60 = 3600 secs

then for 230 secs =10/3600*230 = $ .64 per unit of bicycle

Thus Cost of direct labour per unit of bicycle = $ .64

b.   Time required for 1 bicycle: 230 secs

No. of bicycles in 1 hour or 3600secs=1/230*3600=15.65 = 15 approx.

Selling Price of 15 Bicycle = $6*15 =$ 90

Less: Direct Labour per hour =$ 10

: Sourced Part for 15 Bicycle. = $1*15 =$ 15

: Fixed Cost per hour i.e.for 15 Bicycle. =$

Add a comment
Know the answer?
Add Answer to:
Help Save Saw Homework Asas Inc. is a toy bicycle manufacturing company producing a five-inch small...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Atlas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike...

    Atlas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: Step 1 (30 sec.): The plastic tube for the frame is cut to size. Step 2 (20 sec.): The tube is put together. Step 3 (35 sec.): The frame is...

  • Atlas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike...

    Atlas Inc. is a toy bicycle manufacturing company producing a five-inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here:             • Step 1 (25 sec.): The plastic tube for the frame is cut to size.                    • Step 2 (25 sec.): The tube is put together.                                      • Step 3 (20 sec.):...

  • Atlas Inc. is a toy bicycle manufacturing company producing a five inch small version of the...

    Atlas Inc. is a toy bicycle manufacturing company producing a five inch small version of the bike that Lance Armstrong rode to win his first Tour de France. The assembly line at Atlas Inc. consists of seven work stations, each performing a single step. Stations and processing times are summarized here: Step 1 (50 sec.): The plastic tube for the frame is cut to size. Step 2 (40 sec.): The tube is put together. Step 3 (55 sec.): The frame...

  • PowerToys Inc. produces a small remote-controlled toy truck on a conveyor belt with nine stations. Each...

    PowerToys Inc. produces a small remote-controlled toy truck on a conveyor belt with nine stations. Each station has, under the current process layout, one worker assigned to it. Stations and processing times are summarized in the following table: Station Task Processing Times (seconds) 1 Mount battery units 70 2 Insert remote control receiver 80 3 Insert chip 90 4 Mount front axle 60 5 Mount back axle 65 6 Install electric motor 50 7 Connect motor to battery unit 75...

  • A company produces gold picture frames. The cost per picture frame is: Materials                            &nbsp

    A company produces gold picture frames. The cost per picture frame is: Materials                                                        $9 Packaging                                                     $1 Decorations on the frame                           $5 Shipping and handling                                $1.5 Each worker earns $30,000 annually in salary and benefits. The number of workers changes based on the level of production. This means this is a variable cost. The artist who creates the designs on the picture frames is paid $25,000 annually. Senior management are paid a total of $200,000 annually. Other annual costs are:...

  • manufacturing plng/ control 1. Suppose that your company sells a product for which the annual demand...

    manufacturing plng/ control 1. Suppose that your company sells a product for which the annual demand is 10,000 units. Holding costs are $1.00 per unit per year, and setup costs are $200 per order (a) What is the economic order quantity for your product? (b) What will be the annual total cost holding and ordering? 2. A company has currently 100 workers. A worker works 40 hours a week, and can at most work 20 hours of overtime per week....

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company's products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2,380 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company’s products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2,240 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company’s products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2,120 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company’s products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2,220 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT