Zales Jeweller uses rubies and sapphires to produce two types of rings. A type 1 ring requires two rubies, three sapphires and one hour of jeweller’s labour time. A type 2 ring requires three rubies, two sapphires and two hours of jeweller’s labour time. Each type 1 ring sells for R1 200 and each type 2 ring sells for R1 500. All rings produced by Zales can be sold. At present, Zales has 100 rubies, 120 sapphires and 70 hours of jeweller’s labour time. Extra rubies can be bought at R300 per ruby. Market demand requires at least 20 type 1 rings and 24 type 2 rings.
What is the most that Zales will be willing to pay for another hour of jeweller’s labour time? How many hours may be obtained at this price?
) What is the most that Zales will be willing to pay for
another hour of jeweller’s labour
time? How many hours may be obtained at this price? (7
marks)
ANS :-
zales will be willing to pay at most r600 (shadow price of jewellers labow time for another hour of jeweller labow time as allowable increase is 2 so 2 more howrs can be abtained in this price
Zales Jeweller uses rubies and sapphires to produce two types of rings. A type 1 ring...
Zales Jeweller uses rubies and sapphires to produce two types of rings. A type 1 ring requires two rubies, three sapphires and one hour of jewller's labour time. A type 2 ring requires three rubies, two sapphires and two hours of jeweller's labour time. Each type 1 ring sells for R1200 and each type 2 ring sells for R1500. All rings produced by Zales can be sold. At present, Zales has 100 rubies, 120 sapphires and 70 hours of jeweller's...
Type or paste question here
A refinery produces two types of lubricating oil, type A and type B. To produce 1000 litres of type A oil requires two hours in process 1, two hours in process 2 and six hours in process 3. To produce 1000 litres of type B oil requires four hours in process 1, two hours in process 2 and three hours in process 3. The availability of the process 1 plant is twelve hours per day,...
Q. An automobile parts manufacturer produces two types of automobile parts used for making four wheelers. Type 1 requires ½ hour of labor and 1 hour of machine time. Type 2 requires 1 hour of labor time and 2 hours of machine time. There are 500 hours available per week of labor and 700 machine hours available. Type 1 has a profit margin of $ 35 a unit and Type 2 have a profit margin of $ 50 a unit....
A company wishes to produce two types of souvenirs: Type A and Type B. Each Type A souvenir will result in a profit of $1, and each Type B souvenir will resul in a profit of $1.20. To manufacture a Type A souvenir requires 2 minutes on Machine I and 1 minute on Machine II. A Type B souvenir requires 1 minute on Machine I and 3 minutes on Machine II. There are 3 hours available on Machine 1 and...
A company manufactures two types of electric hedge trimmers, one of which is cordless. The cord-type trimmer requires 2 hours to make, and the cordless model requires 4 hours. The company has only 800 work hours to use in manufacturing each day, and the packaging department can package only 300 trimmers per day. If the company profits are $36.50 for the cord-type model and $73.00 for the cordless model, how many of each type should the company produce per day...
Wild West produces two types of cowboy hats. A Type 1 requires twice as much labor time as a Type 2. If all the available labor time is dedicated to Type 2 alone, the company can produce a total of 400 Type 2 hats a day. The respective market limits for the two types are 150 and 200 hats per year. The revenue is $8 per Type 1 hat and $5 per Type 2 hat. a) Determine the number of...
A system is subject to two types of failure. When a failure occurs, it is type 1 with 40% probability The time from when the system is repaired until a new failure occurs exponentially distributed with mean of 30 days. If the failure is type 1, two different components are repaired by two repairmen in exponentially and independently distributed periods each with a mean of 2 days. If the failure is type 2, one component is repaircd by one repairman...
Davis Division uses two raw materials-X33 and Z42-to produce its product called Base 23, a chemical base for interior house paint. The materials are mixed in the following standard proportions to yield 100 litres of Base 23: Cost Quantity (litres) per Litre Material $ 1 5 Х33 80 242 20 It requires 5 hours of direct labour at $15 per hour to produce 100 litres of Base 23. On average, the division can produce and sell 20,000 litres of Base...