Question

Before Development: Cover mpervious (roads, soil c) Wooded (good cover, soil c) Meadow (good condition, soil c) Lodge Grounds

CN before = 71.12
CN after = 76.5

0 0
Add a comment Improve this question Transcribed image text
Answer #1

0看巘レ@c弋Lo eseleposar P- Pain tall = 5.8 inches to.SS : Potential theter otteet nei- gins- plaximum unG 10 00 Lo 2 4구49-incheo

Add a comment
Know the answer?
Add Answer to:
CN before = 71.12 CN after = 76.5 Before Development: Cover mpervious (roads, soil c) Wooded...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question 04 (20 pts) [will be graded] Use the NRCS (SCS) method to estimate rainfall excess...

    Question 04 (20 pts) [will be graded] Use the NRCS (SCS) method to estimate rainfall excess for an area before and after development. The rainfall is estimated at 15 cm. The hydrologic soil type is A. The pre-development condition is open space with grass on above 50% of the area with fair condition. The post- development condition is residential with a 38% impervious cover. If the watershed were 10.1 ha, how many m3 of ponding is necessary to store all...

  • ng an average soil moisture condition on hydrologic soils group C, calculate the runoff volume (inches)...

    ng an average soil moisture condition on hydrologic soils group C, calculate the runoff volume (inches) for a 100-acre suburban development with the following land use when rainfall is 4 inches. You must use the NRCS-CN method and Table 5.11, Figure 5.11, or Equation 5.26. Percentage of Land 20 40 30 10 Land Use 4- acre residential lots 1/8- acre condominiums Commercial area with curbs Open space grass cover-85% What is the required area of a retention basin, in square...

  • Use the Rational Method to evaluate the effect of a proposed subdivision development on the 10-...

    Use the Rational Method to evaluate the effect of a proposed subdivision development on the 10- year peak discharge for a 40-acre subcatchment near Iowa City (section 6. The pre development and post-development water shed characteristics are shown below. The Hydrologic Soil Group is B for the soils at the site. Before/After Before Development 40 % Lawns (Good Condition) After Development | 70% Multi-Unit (Attached) Land Use | 60 % Parks te(minutes) 60 30% Parks 15 Estimate the Rational Method...

  • I need Summary of this Paper i dont need long summary i need What methodology they used , what is the purpose of this p...

    I need Summary of this Paper i dont need long summary i need What methodology they used , what is the purpose of this paper and some conclusions and contributes of this paper. I need this for my Finishing Project so i need this ASAP please ( IN 1-2-3 HOURS PLEASE !!!) Budgetary Policy and Economic Growth Errol D'Souza The share of capital expenditures in government expenditures has been slipping and the tax reforms have not yet improved the income...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT