A car Rental rents cars using a two-step process as seen below:

1) Suppose the Car Rental is supply constrained. What is the cycle time (in minutes) of this process?
2) Suppose the Car Rental is demand constrained and rents 20 cars per hour. What is the Car Rental's labor utilization (%)?
3) Suppose the Car Rental is demand constrained and now rents 15 cars per hour. Once a new shift begins in the morning, how long (in hours) will it take to complete the process of renting 50 cars?
1)
Capacity of each step = Number of employees * 60 / processing time in minutes
Capacity of step 1 = 3*60/6.5 = 27.7 cars per hour
Capacity of step 2 = 2*60/3 = 40 cars per hour
Capacity of step 1 is lower. Therefore, it is the bottleneck
Cycle time = 1 / Capacity of bottleneck
= 1/27.7 hours
= 2.17 minutes (this can also be computed as processing time / number of employees = 6.5/3 = 2.17 minutes)
2)
Demand rate = 20 cars per hour
Flow rate = Minimum of demand rate or bottleneck capacity
= Minimum of 20 or 27.7
= 20 cars per hour
Labor utilization = Total work content per hour / (Number of employees * 60 minutes per hour)
= (6.5+3)*20/(5*60)
= 63.3 %
3)
Given demand rate = 15 cars per hour
Demand rate is lesser than capacity
Therefore, total time in hours to complete the process of renting 50 cars
= 50/15
= 3.33 hours
A car Rental rents cars using a two-step process as seen below: 1) Suppose the Car...
Share&Care is a nonprofit car share company that rents cars.
When a customer makes a reservation, they specify their pick up
time and the number of time slots they will hold the vehicle, where
each time slot equals 15 minutes. For example, if the pick up time
is 1pm, then possible drop off times are 1:15 (1 slot), 1:30 (2
slots), etc. Share&Care charges $1.25 for each time slot in the
reservation. To discourage customers from returning the rented cars...
Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one takes an average of 60 minutes to paint each unit. Drying takes place in an oven that can hold up to 100 units and it takes 5 minutes to load each unit. Once all the units are loaded into the oven, it takes 6 hours to dry each load. Assume that the process is capacity constrained (so the demand rate...
PART I: Multiple Choice Write all answers to the following questions. No partial credit available. Consumption utility is composed of price and convenience. True or False? A firm reduces inefficiencies by making trade-offs. True or False? A firm can increase its profitability by: A. increasing costs and reducing price. B. moving away from the efficient frontier. C. increasing inefficiencies. D. reducing inefficiencies. Operations comes from the Latin word "opus," which means: A. activity. B. helping people. C. improvement. D. work....
1. The process is performed by several resources. 2. Resources are shared across assembly lines (i.e., workers must multitask and perform multiple activities for every flow unit.) 3. The resource that limits hourly production is not the same resource that limits the process lead-time. From 2002 to 2009, Honda’s 1800cc cruiser-style motorcycle, the VTX1800, was assembled in Marysville, Ohio from four major subassemblies. The following is a simplified explanation of the assembly process. All resources are indicated in bold. •...
Zipcar: “It’s Not About Cars—It’s About Urban Life” Imagine a world in which no one owns a car. Cars would still exist, but rather than owning cars, people would just share them. Sounds crazy, right? But Scott Griffith, CEO of Zipcar, the world’s largest car-share company, paints a picture of just such an imaginary world. And he has nearly 800,000 passionate customers—or Zipsters, as they are called—who will back him up. Zipcar specializes in renting out cars by the hour...