


Q.2 (12 Marks) An owner of a ceramic tile factory contacted a Geotechnical consultant to design...
"Annexure B" ASSIGNMENT 2 DESIGN BRIEF Due to increasing pedestrian traffic of students travelling from halls of residence to the engineering block at one of its devised a plan, which includes a new means of crossing a busy road safely and without causing traffic delay. A solution to protect student safety for crossing the busy road is to design and build a pedestrian bridge. This will eliminate traffic congestion and delays as well as eliminate conflict between pedestrians and motorists....