1)
Load of machine A = SUMPRODUCT of Processing time and Forecast demand
= 80*10+60*10+40*5+20*5
= 1700 minutes
Load of machine B = SUMPRODUCT of Processing time and Forecast demand
= 80*15+60*10+40*10+20*5
= 2300 minutes
Load of machine C = SUMPRODUCT of Processing time and Forecast demand
= 80*15+60*10+40*15+20*5
= 2500 minutes
Load of machine D = SUMPRODUCT of Processing time and Forecast demand
= 80*5+60*10+40*10+20*10
= 1600 minutes
Load of machine C is the highest. Therefore, it is the bottleneck
1)
Work center C is the bottleneck. Hence, it is of greatest concern for the operations manager.
2)
Contribution per BN minute of Harlan model = (200-80)/15 = $ 8
Contribution per BN minute of Gaylen model = (150-60)/10 = $ 9
Contribution per BN minute of Leah model = (100-40)/15 = $ 4
Contribution per BN minute of Matthew model = (75-20)/5 = $ 11
Products are prioritized for production in order of their contribution per BN minute
Therefore, priority of products for production is: Matthew, Gaylen, Harlan and Leah
3)
BN minutes remaining on machine C after production of Matthew, Gaylen and Harlan = 2400-(20*5+60*10+80*15)
= 500 minutes
Production of Leah = 500/15 = 33 units
Optimal product mix is:
Harlan = 80
Gaylen = 60
Leah = 33
Matthew = 20
Problem 2 Schmidt Industries makes four different snake traps; the Harlan, the Gaylen, the Leah and...
2. King Supply makes four different types of plumbing fixtures: W, X, Y and Z. The contribution margins for these products are: $70 for Product W, 560 for Product X, $90 for Product Y and S100 for Product Z. Fixed overhead is estimated at S5,500 per week. The manufacture of each fixture requires four machines, Machines #1, 2, 3 and 4, Each of the machines is available for 40 hours a week and there is no setup time required when...
Problem 3.14 A machine shop has four machines of five different types and operates 40 hours per week. Part-mix ratios, batch quantities, part routings, machines, servers, and production times are given in the table below for the five part styles produced in the shop. Operation sequence for each part style is in the order of station number. Part styles are identified by letter and stations are identified by number. Determine (a) which station is the bottleneck, (b) total production rate...
A company makes four products: Product A sells for $50 but needs $10 of materials; Product B sells for $75 but needs $30 of materials; Product C sells for $100 but needs $50 of materials; Product D sells for $150 but needs $75 of materials. The labor cost is $15/hr. The processing requirements for each product on each of the four machines are shown in the table. Table 6 Work Center Processing Time (min/unit) A B C D W 3...
1. Archer Industries sells three different sets of sportswear. Sleek sells for $30 and has variable costs of $18; Smooth sells for $50 and has variable costs of $30; Potent sells for $80 and has variable costs of $45. The sales mix of the three sets is: Sleek, 50%; Smooth, 30%; and Potent, 20%. Instructions What is the weighted-average unit contribution margin? 2. sony Inc. sells two product lines. The sales mix of the product lines is: Standard, 60%; and...
1. Your plant has three milling machines dedicated to production of a single product. Each batch requires a setup time of 25 minutes per batch, the processing time per unit is 5 minutes, and the batch size is set at 100 units. Each machine processes an entire batch at one time. The machines are staffed 8 hours per day. A. (10 points) If the average arrival rate to the plant is 2.5 batches per day, what is the average utilization...
A company would like to determine the best production schedule using a manufacturing process with four machines: W, X, Y, and Z. Each machine can be used for 2400 minutes per week. The weekly demands and the processing time on machines are shown below. Product A, 150 units/week, 6, 10, 6, 0 minutes; Product B, 90 units/week, 0, 9, 7, 8 minutes; Product C, 120 units/week, 8, 8, 7, 5 minutes; Product D, 130 units/week, 7, 0, 5, 8 minutes....
Cooper River Glass Works (CRGW) produces four different models
of desk lamps as shown on the flowchart. The operations manager
knows that total monthly demand exceeds the capacity available for
production. Thus, she is interested in determining the product mix
which will maximize profits. Each model's price, routing,
processing times, and material cost is provided in the flowchart.
Demand next month is estimated to be
300 units of model Alpha,150 units of model Bravo, 175 units
of model Charlie, and...
j
Canine Kennels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see the figure below). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product's price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed...
- ry u l UUC using the presellegue 1.1. 35. Target Costing. Table Manufacturing, Inc., makes wood tables for commercial use. The marketing department has identified a market for a specific table that the company does not currently produce, and it expects that each table could be sold for $2.000. Management requires a profit of 40 percent of the selling price Required: Determine the highest cost (target cost management would be willing to accept to produce this product. 36. Constrained...
6.6 (LO 2), AP Yard Tools lawnmowers unit contribution margin are as follows. s manufactures lawnmowers, weed-trimmers, and chainsaws. Its sales mix and pute break-even point n unts for acompany with more than one produt Sales Mix Unit Contribution Lawnmowers Weed-trimmers Chainsaws 20% 50% 30% $30 $20 $40 Yard Tools has fixed costs of $4,200,000 Instructions Compute the number of units of each product that Yard Tools must sell in order to break even under this product mix. Tanek Industries...