4. Given the following table: Arrival Time Burst Time Process P1 P2 P4 WN a) Calculate the average waiting time if shortest j
0 0
Add a comment Improve this question Transcribed image text
Answer #1

(a) Shortest Job Preemptive Algorithm-

Date : Page No. Burst Time Arrival Time 0 Process Remaining 8 2 ko P24 P3 24 2 3 Gantt Chart- TPL/PL/PL/P4/P3) P21 a 1 2 3 5

(b) Round Robin with Time Quantum 3-

Remaing 200ESS Arival PLO P2 Time 130 + yo 80 20 . P4 3 Time Quantum = 3 Process Queue : PL 82 pF et 8 Cantt Chart TPL o 3 P2

Add a comment
Know the answer?
Add Answer to:
Practice question! Answer fast or no upvote. 4. Given the following table: Arrival Time Burst Time...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 4. Consider a ready queue with four processes :- Process Arrival Time Burst Time (ms) P1...

    4. Consider a ready queue with four processes :- Process Arrival Time Burst Time (ms) P1 Priority P2 P3 P4 P5 For each of the following CPU scheduling algorithms, determine the turnaround and average waiting time for each of the process :- a. Shortest remaining Time First b. Shortest Job First C. Priority Scheduling (Both pre-emptive and non-preemptive) d. Round Robin (quantum is 1 ms)

  •          Process                    Arrival Time            &nbsp

             Process                    Arrival Time                             Burst Time                         P1                                0                                              2                         P2                                1                                              1                         P3                                2                                              4                         P4                                3                                              2                         P5                                4                                              1 Consider a set of processes given above with the arrival time and the length of CPU burst time given in cycles. Show a Gantt chart and calculations of average turnaround time and average waiting time of these processes under the shortest job first (SJF) with preemption CPU scheduling algorithm and the round-robin...

  • Answer the following using the processes and their corresponding arrival time and burst time. These processes...

    Answer the following using the processes and their corresponding arrival time and burst time. These processes are being scheduled using a preemptive, round-robin scheduling algorithm with a time quantum of 2 units. PID Arrival Time Burst Time P1 0 4 P2 1 5 P3 2 3 P4 3 2 P5 4 6 1. Use a Gantt chart to represent the above processes (5 points) 2. Calculate the average waiting time for each process (5 points) 3. Calculate the completion time...

  • (Algorithm Computation Question) Given the following processes and associated arrival time and burst time. Process   Arrival...

    (Algorithm Computation Question) Given the following processes and associated arrival time and burst time. Process   Arrival Time     Burst Time P1                0.0                    6 P2                2.0                    5 P3                3.0                    2 P4                4.0                    3 1) Calculate the average waiting time if the CPU scheduling uses FCFS algorithm. 2) Calculate the average waiting time if the CPU scheduling uses Non-Preemptive SJF algorithm.

  • Consider the following set of processes, with the length of the CPU-burst time given in milliseconds:

    Consider the following set of processes, with the length of the CPU-burst time given in milliseconds:Processburst TimePriorityP1103P211P323P414P552For each of the scheduling algorithms, FCFS, Shortest-Job-First (SJF, non-preemptive), Priority (smaller priority number implies higher scheduling priority), and RR (quantum = 1) do the following.Draw a Gantt chart to show how these processes would be scheduled.Give the turnaround time (total time from the first arrival into ready state until CPU-burst is completed) of each process.Give the waiting time (total time spent in the Ready state) of each process.Give...

  • Given the following set of processes with corresponding execution times (in ms), arrival times and priority...

    Given the following set of processes with corresponding execution times (in ms), arrival times and priority (1 – highest).  For each scheduling algorithm: Construct a table showing which process is active and for how long until all processes are completely serviced (as done in class). Calculate the average waiting time and turnaround time. Process ID Burst (ms) Arrival time P1 9 0 P2 12 0 P3 3 0 P4 30 0 P5 20 0 P6 10 0 First Come First Serve...

  • Part 2 Round Robin Scheduling Process Burst Time in Ms P1 4 P2 2 P3 1...

    Part 2 Round Robin Scheduling Process Burst Time in Ms P1 4 P2 2 P3 1 Calculate the average waiting time and turnaround time using round robin scheduling, where the time quantum q = 2 ms According to the Round Robin algorithm, the arrival of processes is shown in the following Gantt chart. P1 P2 P3 P1 P2 P3 P1 P2 P3 P1 0                 2                 4                  6                8                 10               12                14               15              16               18...

  • Given the following set of processes---with the specified length of the CPU burst, arrival time, and...

    Given the following set of processes---with the specified length of the CPU burst, arrival time, and priority---compute response time for P1-P5 with round-robin scheduling with time quantum of 10 units. Also compute average response time. Assume that a newly arriving process arrives first at time T- and a process that is preempted due to the completion of its quantum arrives at time T+ in the waiting queue. (Note: Show the Gantt chart and other working details in your worksheet.) Process...

  • 8. Consider the following 5 processes in the ready queue: Process Burst Priority Arrival time n...

    8. Consider the following 5 processes in the ready queue: Process Burst Priority Arrival time n w P1 P2 w N P3 P P - W WE O P4 N P5 N A O Draw Gantt charts illustrating the execution of these processes for each of the following algorithms: (a) preemptive SJF, (b) RR (with quantum = 1), (C) FCFS, and (d) preemptive priority, and calculate the respective turnaround and waiting times.

  • From the Gantt chart, the waiting time and the turnaround time are calculated as:

    Round Robin Schedulin ProcessBurst Time in MsP14P22P32Calculate the average waiting time and turnaround time using round robin scheduling, where the time quantum q = 2 ms According to the Round Robin algorithm, the arrival of processes is shown in the following Gantt chart. From the Gantt chart, the waiting time and the turnaround time are calculated as: Waiting time for P1= Waiting time for P2 = Waiting time for P2 = Therefore, the average waiting time = Turnaround time =

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT