Question

A 1750kg car starts at the bottom of a 20m tall hill traveling at 15 m/s....

A 1750kg car starts at the bottom of a 20m tall hill traveling at 15 m/s. During the trip up the hill, air resistance does -50 kJ of work on the car, and friction does an additional -120 kJ of work on the car. What is the minimum amount of work the engine must do in order for the car to reach the top of the hill?

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A 1750kg car starts at the bottom of a 20m tall hill traveling at 15 m/s....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A car of mass 1100 kg starts from rest at sea level and climbs a hill...

    A car of mass 1100 kg starts from rest at sea level and climbs a hill of height 50.0 m. At the top of the hill, the car has a speed of 25.0 m/s, and at this instant, the driver shuts off the engine of the car. The car then coasts down the other side of the hill to height of 15.0 m above sea level. Assume that friction and air resistance are negligibly small. a) (6 pts) How much...

  • a 1750kg car is parked at the top of a hill with an incline of 12...

    a 1750kg car is parked at the top of a hill with an incline of 12 degrees. Its brakes fail and the car starts rolling down the hill. a) how long will it take for the car to travel 200m and reach the bottom of the hill? (the coefficient of rolling friction between the tires and the road is 0.10) b) what will be its velocity at the bottom?

  • 5. A 1000-kg car is at the top of a hill as shown, where its elevation...

    5. A 1000-kg car is at the top of a hill as shown, where its elevation above the bottom of the hill is 120 m. a. What is its gravitational potential energy? 120 m b. If the cart starts from rest and rolls down the hill with negligible friction and air resistance, what will its kinetic energy be when it reaches the bottom? c. What will be its speed when it reaches the bottom? Suppose instead that there is noticeable...

  • 7. A 1300 kg car drives up a 17 m high hill (the elevation of the...

    7. A 1300 kg car drives up a 17 m high hill (the elevation of the hill is 17 meters). During the drive two nonconservative forces do work on the car: the force of friction and the force generated by the car’s engine. The work done by friction adds 331 kJ to the internal energy. The work done by the engine is 634 kJ. (a) What is the change in the car’s kinetic energy? (b) If the car started up...

  • A 1250 kg car drives up a hill that is 16.2 m high. During the drive,...

    A 1250 kg car drives up a hill that is 16.2 m high. During the drive, two nonconservative forces do work on the car: (i) the force of friction, and (ii) the force generated by the car's engine. The work done by friction is -2.91 times 10^5 J; the work done by the engine is 6.64 times 10^5 J. Find the change in the car's kinetic energy from the bottom of the hill to the top of the hill.

  • A cyclist reaches the bottom of a hill with a speed of 18 m/s. Neglecting air...

    A cyclist reaches the bottom of a hill with a speed of 18 m/s. Neglecting air resistance and other friction, to what maximum height can they coast up the hill without pedalling? a) 19 m b) 20 m c) 17 m d) 18 m

  • A 1500-kg car starts from rest and accelerates uniformly to 18.0 m/s in 12.0 s over...

    A 1500-kg car starts from rest and accelerates uniformly to 18.0 m/s in 12.0 s over a dry concrete road. Assume that kinetic friction remains constant at 400 N during this time. – (a) Find the net work done on the car and the work done by the engine. – (b) How many revolutions does each tire make over the 12.0 s interval? What is the angular speed of the wheels when the car has traveled half the total distance?...

  • work , energy and power 120 m A boy rides a soapbox car down a hill...

    work , energy and power 120 m A boy rides a soapbox car down a hill as shown. The total mass of the 60 m boy and the car is 50 kg. If 1 000) of work are done against friction, the total kinetic energy of car and rider at the bottom is

  • Wiring problem. In the elevator shaft of a tall building, there are 11 identical electrical wires...

    Wiring problem. In the elevator shaft of a tall building, there are 11 identical electrical wires of finite resistance running from the top of the shaft to the bottom. An electrician needs to determine which wires at the bottom correspond to which wires at the top in order to repair the elevator. One battery and one ammeter are available, and the electrician can connect and disconnect any number of wires at either end. (a) If the electrician starts at the...

  • The 1930 kg cable car shown in the figure descends a 200-m-high hill. In addition to...

    The 1930 kg cable car shown in the figure descends a 200-m-high hill. In addition to its brakes, the cable car controls its speed by pulling an 1760 kg counterweight up the other side of the hill. The rolling friction of both the cable car and the counterweight are negligible. (Figure 1) Part A How much braking force does the cable car need to descend at constant speed? Express your answer with the appropriate units. Value Units Submit Request Answer...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT