Question
The Green Thumb Water Sprinkler Company was founded in 1948 by Arthur Green, an entrepreneur with an avid interest in home gardening. Today the successful company, known as Arthur Green, Inc., is run by Arthur’s descendants. Among other things Arthur Green produces a line of high-quality sprinklers targeted at upper-income hobbyists. The company’s products are considered very “retro” in design and are seen by customers as unique and harkening back to an earlier time. To reinforce this image company catalogs and websites feature photos of the late Arthur Green working in his garden and wearing a pith helmet, popular in the past with some gardeners. A stylized drawing of Arthurs’s pith helmet appears on the company’s logo, and one of the real Arthurian headgear is lovingly displayed behind glass at the company’s headquarters in Oconomowoc, Wisconsin.


One product made by Arthur Green is the Model #984 Basic Lawn Sprinkler, a mainstay of the company’s product line and little-changed since first introduced in 1953.

The #984 Sprinkler is very basic in design and easy to assemble. A product structure tree is given later in this problem as well as basic information about each item in the tree. Capacity is limited in that a maximum of 300,000 sprinklers may be shipped in any given week. Note especially the items Raw Aluminum Tubing and Bulk Paint. The tubing ½” in diameter and is purchased in 20-foot sections. 5000 of these 20-foot tubes can be shipped on a single semi flatbed trailer. The lengths of tubing are then cut to form the Frame Tube and the Sprinkler Tube. The Bulk Paint is purchased in semi tanker loads of 8500 gallons each.

Considering the Master Production Schedule and other information given on the following page:


a. Develop MRP reports for each of the ten items of interest in the #984 problem. For Raw Aluminum Tubing and Bulk Paint your report should show the number of truck/tanker loads to be ordered in each time bucket.


b. For the planning scenario in part a above you also need an estimate of scrap aluminum tubing to be sold for recycling on a weekly basis. Determine on a week-by-week basis the revenue that can come from selling scrap aluminum.


c. Mall-Mart Stores, Inc., a very good customer, has suddenly asked whether Arthur Green can ship an additional 200,000 #984 sprinklers in Week 4. This is on top of other orders reflected in the Master Production Schedule. Modify the Master Production Schedule such that Arthur Green can:


· Meet the new quantity from Mall-Mart as quickly as possible.

· Fulfill all other existing orders in the MPS.

· Incur no more than a 10% change in MPS quantities week-to-week.

· Week 4 shipments can be no more than (125,000)(1.1)=137,500 units.



Master Production Schedule Week 10 12 ipment Quantity emtn 125,000 100,000 145,000 175,000 200,000 220,000 220,00 230,000 235,000 Item Ordering Policy Lot-800 Beginning Inventory Scheduled Receipts Sprinkler Water Motor AssemblyAny Batch Size Hose Receptacle Assembly Lots 10,000 Frame Assembly Any Batch Size Any Batch Size Lot- 100,000 Lot- 1,000 Lot for Lot Lot- 250,000 Lot- 1,000,000 Lot-8500 gallons 0 10,000 Sprinkler Tube Metal Screw Water Motor Frame Tube 50,000 250,000 in Week 2 End Plate Bulk Paint 3200 gallons Raw Aluminum Tubing Lot 3500 2 Truckloads 5 Truckloads in Week 1 sections Additional Information The End Plate has a 2-week leadsime All other items have a lead sine of I week. The grade and gauge of aluminum tubing used here weighs 15 pounds per linear foot. The current market price for scrap aluminum tubing is $0.40 per pound. The vendor for the water motor has some significant quality issues. All water motors are inspected by Green Thumb on arrival from the vendor and 1 motor in 200 is found to be unusable. Of course, this must be taken into consideration in planning. The motors in beginning inventory have been inspected and all are useable.
media%2Fbf3%2Fbf38ce68-3760-4ec3-81cd-1c
0 0
Add a comment Improve this question Transcribed image text
Answer #1
Sprinkler Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 125000 100000 145000 175000 200000 220000 220000 230000 235000
Scheduled receipt 0 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 5000 5000 5000 5000 0 0 600 0 0 0 0 400 600
Net requirement 0 0 0 120000 100000 145000 174400 200000 220000 220000 230000 234600
Planned order receipt 120000 100000 145600 174400 200000 220000 220000 230400 235200
Planned order release 0 0 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0
Water motor assembly Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 0 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0
Scheduled receipt 0 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 0 0 0 0 0 0 0 0 0 0 0 0 0
Net requirement 0 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0
Planned order receipt 120000 100000 145600 174400 200000 220000 220000 230400 235200 0
Planned order release 0 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0 0
HR Assembly Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 0 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0
Scheduled receipt 0 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 0 0 0 0 0 4400 0 0 0 0 9600 4400 4400
Net requirement 0 0 120000 100000 145600 170000 200000 220000 220000 230400 225600 0
Planned order receipt 120000 100000 150000 170000 200000 220000 220000 240000 230000
Planned order release 0 0 120000 100000 150000 170000 200000 220000 220000 240000 230000 0 0
Frame Assembly Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 0 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0
Scheduled receipt 0 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 0 0 0 0 0 0 0 0 0 0 0 0 0
Net requirement 0 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0
Planned order receipt 120000 100000 145600 174400 200000 220000 220000 230400 235200 0
Planned order release 0 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0 0
Bulk paint Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 0 3562.5 2968.75 4322.5 5177.5 5937.5 6531.25 6531.25 6840 6982.5 0 0
Scheduled receipt 0 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 3200 3200 0 5531.25 1208.75 4531.25 7093.75 562.5 2531.25 4191.25 5708.75 5708.75 5708.75
Net requirement 0 362.5 2968.75 0 3968.75 1406.25 0 5968.75 4308.75 2791.25 0 0
Planned order receipt 8500 8500 8500 8500 8500 8500
Planned order release 0 0 8500 0 8500 8500 0 8500 8500 8500 0 0 0
Sprinkler tube Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0 0
Scheduled receipt 0 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 10000 10000 0 0 0 0 0 0 0 0 0 0 0
Net requirement 0 110000 100000 145600 174400 200000 220000 220000 230400 235200 0 0
Planned order receipt 110000 100000 145600 174400 200000 220000 220000 230400 235200 0 0
Planned order release 0 110000 100000 145600 174400 200000 220000 220000 230400 235200 0 0 0
Metal screw Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 0 720000 600000 873600 1046400 1200000 1320000 1320000 1382400 1411200 0 0
Scheduled receipt 0 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 50000 50000 30000 30000 56400 10000 10000 90000 70000 87600 76400 76400 76400
Net requirement 0 670000 570000 843600 990000 1190000 1310000 1230000 1312400 1323600 0 0
Planned order receipt 700000 600000 900000 1000000 1200000 1400000 1300000 1400000 1400000
Planned order release 0 700000 600000 900000 1000000 1200000 1400000 1300000 1400000 1400000 0 0 0
Water motor Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 0 122449 102040.8 148571.4 177959.2 204081.6 224489.8 224489.8 235102 240000 0 0
Scheduled receipt 0 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 50000 50000 551 510 939 980 898 408 918 816 816 816 816
Net requirement 0 72448.98 101489.8 148061.2 177020.4 203102 223591.8 224081.6 234183.7 239183.7 0 0
Planned order receipt 73000 102000 149000 178000 204000 224000 225000 235000 240000 0 0
Planned order release 0 73000 102000 149000 178000 204000 224000 225000 235000 240000 0 0 0
Frame tube Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0 0
Scheduled receipt 0 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 0 0 0 0 0 0 0 0 0 0 0 0 0
Net requirement 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0 0
Planned order receipt 120000 100000 145600 174400 200000 220000 220000 230400 235200 0 0
Planned order release 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0 0 0
Plastic cap Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 0 360000 300000 436800 523200 600000 660000 660000 691200 705600 0 0
Scheduled receipt 0 0 250000 0 0 0 0 0 0 0 0 0
Projected on-hand 1000000 1000000 640000 590000 153200 130000 30000 120000 210000 18800 63200 63200 63200
Net requirement 0 0 0 0 370000 470000 630000 540000 481200 686800 0 0
Planned order receipt 0 0 500000 500000 750000 750000 500000 750000 0 0
Planned order release 0 0 0 0 500000 500000 750000 750000 500000 750000 0 0 0
End Plate Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 0 120000 100000 145600 174400 200000 220000 220000 230400 235200 0 0
Scheduled receipt 0 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 350000 350000 230000 130000 984400 810000 610000 390000 170000 939600 704400 704400 704400
Net requirement 0 0 0 15600 0 0 0 0 60400 0 0 0
Planned order receipt 0 0 1000000 1000000 0 0
Planned order release 0 0 1000000 0 0 0 0 1000000 0 0 0 0 0
Raw Al tubing Week 1 2 3 4 5 6 7 8 9 10 11 12
Gross requirement 5.17 4.43 6.45 7.73 8.87 9.75 9.75 10.21 10.43 0 0 0
Scheduled receipt 5 0 0 0 0 0 0 0 0 0 0 0
Projected on-hand 2 1.83 0 0 0 0 0 0 1 1 1 1 1
Net requirement 0 2.60 6.26 7.69 8.86 9.51 9.46 9.88 9.80 0 0 0
Planned order receipt 2.8 6.3 7.7 9.1 9.8 9.8 10.5 10.5 0 0 0
Planned order release 0 2.8 6.3 7.7 9.1 9.8 9.8 10.5 10.5 0 0 0 0

Computations

2 Sprinkler Week 1 Gross requirement 4Scheduled receipt Projected on-hand Net requirement 5000 MAX(0,C5+D4+D7-D3) -MAX(0,D5+E25 26 27 28 Scheduled receipt 29 Projected on-hand 30 31 Planned order receipt 32 Planned order release D31 E31 Frame Assemb49 Metal screw Week 1 4 3 (D32+D16) -3 (E32+E16) 3 (F32+F16) 3 (G32+G16) 51 52 Scheduled receipt 53 Projected on-hand 54 Net73 74 Plastic cap 75 76 Scheduled receipt 77 Projected on-hand 78 Net requirement 79 Planned order receipt 80 Planned order r

Add a comment
Know the answer?
Add Answer to:
The Green Thumb Water Sprinkler Company was founded in 1948 by Arthur Green, an entrepreneur with...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT