Minicase Maxine Peru Ceo Peru Resources Hardly Noticed Plate Current Price High Quality Hy Q26808116 . . .
The spreadsheet at the Online Learning Center presents the base-case analysis for the mining project. Inflation is assumed to be 3.5%, but most costs increase in line with inflation. Thus, we deal with real quantities in the spreadsheet and keep all quantities except for depreciation at their constant real values. The real value of the depreciation expense thus falls by 3.5% per year. For example, real depreciation for the expensive design in year t is:
Real
depreciation = 
The real discount rate is (1.14/1.035) - 1 = 0.10 = 10%.
Notice that the cheaper design seems to dominate the more expensive one. Even if the expensive design ends up costing $10 million, which appears to be the best-case outcome, the cheaper design saves $1.7 million up front, which results in higher net present value. If the cost overruns on the expensive design, the advantage of the cheap design will be even more dramatic.
We are told that the two big uncertainties are construction costs and the price of the transcendental zirconium (TZ). The following table does a sensitivity analysis of the impact of these two variables on the NPV of the expensive design. The range of initial costs represents a pessimistic outcome of a 15% overrun (i.e., $1.5 million) combined with environmental regulation costs of an additional $1.5 million. The optimistic outcome, which we arbitrarily take to entail costs of only $8 million, is probably less relevant. It seems from the case description that there is little chance of costs coming in below $10 million.
|
Range of Input Variables |
Resultant Net Present Values |
|||||
|
Variable |
Pessimistic |
Expected |
Optimistic |
Pessimistic |
Expected |
Optimistic |
|
Initial cost |
$13m |
$10m |
$8m |
-$0.72m |
$1.63m |
$3.20m |
|
TZ price |
$7,500 |
$10,000 |
$14,000 |
-$1.06m |
$1.63m |
$5.94m |
The following table repeats this analysis for the cheaper design. Here, the uncertainty in initial cost is due solely to the environmental regulations. We are told that this design will not be subject to significant other cost overruns.
|
Range of Input Variables |
Resultant Net Present Values |
|||||
|
Variable |
Pessimistic |
Expected |
Optimistic |
Pessimistic |
Expected |
Optimistic |
|
Initial cost |
$9.8m |
$8.3m |
NA |
$0.68m |
$1.63m |
NA |
|
TZ price |
$7,500 |
$10,000 |
$14,000 |
-$0.83m |
$1.86m |
$6.16m |
Notice that the NPV of the cheaper design exceeds the NPV of the expensive one by about $0.22 million regardless of the price of TZ.
In this case, there do not seem to be any inherent relationships among the chief uncertainties of this project. The price of TZ is likely to be unaffected by the cost of opening a new mine. Thus, scenario analysis does not add much information beyond that provided by sensitivity analysis.
One can make a case for delaying construction. If the firm waits a year to see how the price of TZ evolves, the firm may avoid the negative NPV that would result from a low price. Whether it is worth waiting depends on the likelihood that the price will fall.
There is less of a case to be made for delaying construction over the uncertainty of cost overruns. It is unlikely that much of the uncertainty regarding initial cost would be resolved by waiting-the firm probably needs to go into production to learn if there will be overruns.
If the firm goes ahead with the cheaper design, it does not seem necessary to wait to see how the environmental regulations turn out. NPV is positive regardless of the outcome for this variable, so it would not affect the decision of whether to go ahead with the project. The option to walk away from the project would be irrelevant, at least with regard to this variable.
Minicase Maxine Peru Ceo Peru Resources Hardly Noticed Plate Current Price High Quality Hy Q26808116 ....
A binding rent-control price ceiling does NOT result in: inefficiently high quality of the good being sold. inefficient allocation of the good to consumers. wasted resources of consumers caused by time spent searching for the good. inefficiently low transaction costs.
Vince Limited, maker of high quality hand phone cases, has experienced steady growth over the last 5 years. However, increased competition has led Joe, the CEO, to believe that an aggressive campaign is needed next year to maintain the entity's present growth. The financial year begins in January and ends in December. The accountant has presented Joe with the following data for the current year, for use in preparing next year's advertising campaign. Cost Schedules Variable costs Direct labour per...
Your Assignment · You are an outside consulting organization who has been retained by the CEO to fix the problems and make sure the mandate is driven throughout the organization. identify what strategic initiatives and changes you will recommend and the tactics to implement those strategies and changes based on this case study New Product Development Process Improvement Case Study Background: Horizon Giftables, Inc. is a 35-year-old consumer products company that manufactures and distributes home accessory products and décor items through...
2) What were some of the key challenges they encountered? How did they overcome them? 3) What were some of the key takeaways they learned to use in the future? When I assumed the leadership of Heinz’s Asia/Pacific business, in 1993, the company’s revenues from that part of the world were hardly a blip—and I’d never visited most of the countries in the region. I made my first trip there soon after I took the job, and it really opened...