The Again Agame Company produces a game with plastic injection molded parts (along with many other game parts). They receive the demand orders for their shop for the following week and then set up the plastic molding machine to make the parts.
Note:
Friday Night Inventory = Monday morning – demand during that week (if negative, you have a shortage so inventory = 0 and calculate your shortage cost)
Scenario 1:
You will be provided with your order size and will reorder when your quantity reaches 20 (or below) on Monday. Start with your team’s order size in inventory.
The company will produce according to average demand. Each week they make exactly what will be required on average: 20.
What are your Setup, Inventory, stock-out and overall costs at the end of the game?
Scenario 2:
Chose your order size and a reorder point (trigger point). Keep a consistent policy for the whole game.
What are your Setup, Inventory, Shortage, and overall costs at the end of the game?
Conetns in the problem:-
gain Agame Inventory System The Again Agame Company produces a game with plastic injection molded parts (along with many other game parts). They receive the demand orders for their shop for the following week and then set up the plastic molding machine to make the parts.
Note:
Friday Night Inventory = Monday morning – demand during that week (if negative, you have a shortage so inventory = 0 and calculate your shortage cost)

Again Agame Inventory System The Again Agame Company produces a game with plastic injection molded parts...
The ABC Company had two options for sourcing molded plastic parts, and these options are presented in the table below. Now, the ABC Company has identified another potential supplier for the molded plastic parts. The new supplier has bid $0.0600 per part but also will impose a shipping and handling charge of $0.0100 per unit. Additional inventory handling charges should amount to $0.0080 per unit. Finally, purchasing costs are estimated at $10 per month for the length of the 36-month...
Statewide Auto Parts uses a four-week periodic review system to reorder parts for its inventory stock. A one-week lead time is required to fill the order. Demand for one particular part during the five-week replenishment period is normally distributed with a mean of 20 units and a standard deviation of 8 units. Do not round intermediate calculations. At a particular periodic review, 7 units are in inventory. The parts manager places an order for 20 units. What is the probability...
Jill's Job Shop buys two parts (Tegdiws and Widgets) for use in its production system from two different suppliers. The parts are needed throughout the entire 52-week year. Tegdiws are used at a relatively constant rate and are ordered whenever the remaining quantity drops to the reorder level. Widgets are ordered from a supplier who stops by every five weeks. Data for both products are as follows: ITEM TEGDIW WIDGET Annual demand 14,000 9,000 Holding cost (% of item cost)...
A plastic injection molding (PIM) machine for Lego figures makes two different parts (yellow bodies and red hats). One of each part goes into a final assembly, and the takt time for the assembly station is the same as the production cycle time = 30 sec/assembly. The cycle time for the PIM machine is 180 seconds to make 18 parts. The setup time to switch between molds on the PIM machine is 12 minutes. To manage inventory, a Kanban system...
Hello I need help to figure out the MIN Inventory for my stimulation game. I got the daily ending inventory but how do I get the min inventory and total capactiy needed in excel. For example, I got my available capacity of 20, and the daily ending inventory by taking the beginning inventory-the demand+available capacity. But I'm not sure how to calculate min inventory and total capacity needed in excel. Also can you please help with Order point below. thank...
Jill's Job Shop buys two parts (Tegdiws and Widgets) for use in its production system from two different suppliers. The parts are needed throughout the entire 52-week year. Tegdiws are used at a relatively constant rate and are ordered whenever the remaining quantity drops to the reorder level. Widgets are ordered from a supplier who stops by every two weeks. Data for both products are as follows: ITEM TEGDIW WIDGET Annual demand 9,000 9,000 Holding cost (% of item cost)...
Problem 14-35 (Algorithmic) Statewide Auto Parts uses a four-week periodic review system to reorder parts for its inventory stock. A one-week lead time is required to fill the order. Demand for one particular part during the five-week replenishment period is normally distributed with a mean of 22 units and a standard deviation of 8 units. a. At a particular periodic review, 9 units are in inventory. The parts manager places an order for 17 units. What is the probability that...
Using a computerized Inventory Management System, a Paint Supply Store franchise continuously monitors the inventory of all the paint located at each of their 15 stores and their distribution warehouse. The Paint Supply Store franchise sells an average of 64 gallons of Green Paint every week (for 52 weeks per year). They purchase Green Paint from their supplier at a price of $3.50 per gallon. [The company does not hold Safety Stock] It takes 2.25 weeks to receive an order...
Crew Soccer Shoes Company is considering a change in its current inventory control system for soccer shoes. The information regarding the shoes is as follows: Average demand = 200 pairs/week Lead time = 4 weeks Order cost = $60/order Unit cost = $16.50 Carrying charge rate = 0.30 Desired service level = 95 percent Standard deviation of weekly demand = 35 Number of weeks per year= 52 The company decides to use a fixed-order-quantity system. What is the economic order...
can you show how to do this work
Question 13 Using a computerized Inventory Management System, a Paint Supply Store franchise continuously monitors the inventory of all the paint located at each of their 15 stores X and their distribution warehouse. The Paint Supply Store franchise sells an average of 74 gallons of Purple Paint every week (for 52 weeks per year, Standard Deviation of the Demand - 8 gallons). They purchase Purple Paint from their supplier at a price...