value added is the time spent that add value to the product/services.
Step 1:Find value added lead time
| Value added lead time | |||
| cutting and assembly | 8 Minutes | ||
| Decorating process | 10 Minutes | ||
| Total | 18 Minutes |
Step 2: find within batch wait time
Non -value added lead time= (Move time+within batch wait time+value added lead time)
within batch wait time is calculated as :- total value added time (batch size-1)
18 (12-1)
=198 minutes
Step3 : find non value added lead time
Non -value added lead time= (Move time+within batch wait time+value added lead time)
=12 minutes + 198 minutes+18 minutes
=228 minutes
Answer C)
Please upvote
Please write out correct answer and whether it’s A, B, C or D. Thank you. Christmas...
Christmas Express makes wreaths in batch sizes of 25. The cutting & assembly process takes 6 minutes per wreath and the decorating process time is 9 minutes per wreath. It takes 6 minutes to move the wreaths from the cutting & assembly process to the decorating process. Compute the value-added, non-value-added, and the total lead time of the wreath process. Value-added lead time: Non-value-added lead time: Move time Within batch wait time Total lead time Compute the value-added ratio. Round...
Christmas Express makes wreaths in batch sizes of 30. The cutting & assembly process takes 4 minutes per wreath and the decorating process time is 15 minutes per wreath. It takes 4 minutes to move the wreaths from the cutting & assembly process to the decorating process. Compute the value-added, non-value-added, and the total lead time of the wreath process. Value-added lead time: Non-value-added lead time: Move time Within batch wait time Total lead time Compute the value-added ratio. Round...
The High Altitude Ski Company manufactures skis in the finishing and assembly process. Skis are manufactured in 50-ski batch sizes. The finishing time is 2 minutes per ski. The assembly time is 7 minutes per ski. It takes 18 minutes to move a batch of skis from finishing to assembly. a. Compute the value-added, non-value-added, and total lead time of this process.
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC boand assembly operation, a number。individuals are esponsible for assenting electronic components into pn te i ut boards. Each operator s es ons le r so den g e net erdg to a given set of instructions. Operators work on batches of s0 printed dircuit boards. Each board requires 4 minutes of board assembly time. After each...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed,...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed,...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...
Lead Time
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...
Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of Soprinted circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the...