Question

1. Jidoka is tool of          a.       100% quality inspection          b.       Integrating the human into...

1. Jidoka is tool of

         a.       100% quality inspection

         b.       Integrating the human into an automated system

         c.       Utopia

         d.      Setup reduction

         e.       Inventory reduction

2.The setup time for a batch of 250 products is 30 minutes while the production time is 5 minutes for each product. What will be the product manufacturing time for each unit?

         a.       5 minutes

         b.       12 minutes

         c.       0.12 minutes

         d.      5.12 minutes

         e.       Cannot be calculated

3. The setup time for a batch of 250 products is 30 minutes while the production time is 5 minutes for each product. If the batch size goes up to 300, what will be the effect on product manufacturing time?

         a.       No effect

         b.       Increase by 0.12 minutes

         c.       Decrease by 0.1 minutes

         d.      Increase by 0.02 minutes

         e.       Decrease by 0.02 minutes

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1. The answer is b.

Jidoka is term used for automation using human intelligence. This helps in identifying the problem causes and eliminate the root cause of defects thus improving the processes.

Add a comment
Know the answer?
Add Answer to:
1. Jidoka is tool of          a.       100% quality inspection          b.       Integrating the human into...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Suppose a resource has setup times and a setup time must be incurred each time the...

    Suppose a resource has setup times and a setup time must be incurred each time the resource switches production to a different product. Requiring the resource to make a new product (which requires its own setup) is likely to have what effect on the process? Inventory for existing products remains the same but the process must now carry inventory of the new product. Inventory of all products is likely to increase. Inventory of existing products decreases even though the process...

  • Needing the correct answer to both questions. Thanks! Answer is not complete. Suppose a resource has...

    Needing the correct answer to both questions. Thanks! Answer is not complete. Suppose a resource has setup times and a setup time must be incurred each time the resource switches production to a different product. Requiring the resource to make a new product (which requires its own setup) is likely to have what effect on the process? °Inventory for existing products remains the same but the process must now carry inventory of the new product. OInventory of all products is...

  • An order for 160 of a product is processed on work centers A and B. The...

    An order for 160 of a product is processed on work centers A and B. The setup time on A is 30 minutes, and run time is ten minutes per piece. The setup time on B is 40 minutes, and the run time is six minutes per piece. The move time between A and B is ten minutes. There is no queue at either workstation Calculate the total manufacturing lead time for the order Select one: O O O O...

  • 1. Your plant has three milling machines dedicated to production of a single product. Each batch...

    1. Your plant has three milling machines dedicated to production of a single product. Each batch requires a setup time of 25 minutes per batch, the processing time per unit is 5 minutes, and the batch size is set at 100 units. Each machine processes an entire batch at one time. The machines are staffed 8 hours per day. A. (10 points) If the average arrival rate to the plant is 2.5 batches per day, what is the average utilization...

  • FLEXIBLE MANUFACTURING SYSTEM (FMS)

    A semi-automated flexible manufacturing cell (FMC) is used to produce threeproducts. The products are made by two automated processing stations followedby an assembly station. There is also a load/unload station. Material handlingbetween stations in the FMC is accomplished by automated guided vehicles(AGVs) that move tote bins containing the particular components to beprocessed and then assembled into a given product. The AGVs transfer tote binsbetween stations. In this way, the AGVs are kept busy while tote bins arequeued in front of...

  • please answer this, the answer is number f sorry typo, number f is the question. please...

    please answer this, the answer is number f sorry typo, number f is the question. please answer this number f A manufacturing company is introducing a new product. This product requires five processes: A, B, C, D, and E in sequence. The equipment required for each process is available in the company now and is dedicated to the production of another type of products. Although some capacity is available on all the equipment types, management is not sure whether they...

  • 4. Pink Bags (PB) is a designer of high-quality backpacks and purses. Each design is made...

    4. Pink Bags (PB) is a designer of high-quality backpacks and purses. Each design is made in small batches. Each spring, PB comes out with new designs for the backpack and for the purse. The company uses these designs for a year and then moves on to the next trend. The bags are all made on the same fabrication equipment that is expected to operate at capacity. The equipment must be switched over to a new design and set up...

  • 1.     A processor makes two components, A and B, which are then packaged together as the final pr...

    1.     A processor makes two components, A and B, which are then packaged together as the final product (each product sold contains one A and one B). The processor can do only one component at a time: either it can make As or it can make Bs. There is a setup time when switching from A to B. Current plans are to make 100 units of component A, then 100 units of component B, then 100 units of component A,...

  • Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following...

    Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. b. The root causes of the activity cost (such as plant layout, process design, and product design). C. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection, 1. It takes 48 minutes and five pounds of material...

  • Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC boand assembly o...

    Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC boand assembly operation, a number。individuals are esponsible for assenting electronic components into pn te i ut boards. Each operator s es ons le r so den g e net erdg to a given set of instructions. Operators work on batches of s0 printed dircuit boards. Each board requires 4 minutes of board assembly time. After each...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT