Heidi makes rag quilts. Each child-sized quilt contains 4.25 yards of flannel priced at $4.80 per yard and thread costing $0.24 per quilt. Heidi also allows 0.10 yards of fabric for waste per quilt. Direct labor for each quilt requires 2 hours of cutting and 4 hours of sewing. Cutters’ direct labor rate is $7.25 per hour, and sewers’ direct labor rate is $8.50 per hour. Rest periods of 0.01 hours per quilt are allowed for both sewers and cutters, with an additional 0.02 hours per quilt allowed for machine downtime. What is the standard direct materials cost per quilt?
a. $17.80
b. $21.12
c. $19.50
d. $21.95
| b. $21.12 | |
| Direct material cost per quilt will be | |
| Flannel (4.25 x $4.80 per yard) | $20.40 |
| Fabric wasted (0.10 x $4.80) | $0.48 |
| Thread | $0.24 |
| $21.12 | |
Heidi makes rag quilts. Each child-sized quilt contains 4.25 yards of flannel priced at $4.80 per...
Q 11.24: Sports Outfitters manufactures athletic shoes. The direct materials price list for each shoe is as follows: 0.25 pounds of rubber for sole, $14.00 per pound 0.4 yards of cloth for outer shoe, $4.75 per yard 0.3 yards of cloth for inner lining, $2.18 per yard Thread, $0.15 Laces, $0.34 Allowance for waste, $0.07 Direct labor includes molders, cutters, and sewers. Standard direct labor hours per shoe are 0.3 hours for molding, 0.2 hours for cutting, and 0.75 hours...