Mean = 12.00

Standard deviation (SD) = 0.05

Desired performance is 12 +/- 3 standard deviation where \sigma = 0.045

So , Upper specification limit (USL) = 12 + 3\sigma = 12 + (3 × 0.045) = 12 + 0.135 = 12.135

Lower specification limit (LSL) = 12 - 3\sigma = 12-(3 × 0.045) = 12-0.135 = 11.865

Cpl = (Mean - LSL) / (3 x SD) = (12.00-11.865)/(3x0.05) = 0.135/0.15 = 0.900

Cpu = (USL - Mean) / (3 x SD) = (12.135-12.00)/(3x0.05) = 0.135/0.15 = 0.900

Process capability index (Cpk) = Minimum of (Cpu, Cpl)

= Minimum of (0.900 , 0.900)

= 0.900

Add a comment
Know the answer?
Add Answer to:
Problem 6s.42 18 Question Help Linda Boardman, Inc., an equipment manufacturer in Boston, has submitted a...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Linda​ Boardman, Inc., an equipment manufacturer in​ Boston, has submitted a sample cutoff valve to improve...

    Linda​ Boardman, Inc., an equipment manufacturer in​ Boston, has submitted a sample cutoff valve to improve your manufacturing process. Your process engineering department has conducted experiments and found that the valve has a mean ​(muμ​) of 12.00 and a standard deviation ​(sigmaσ​) of 0.06. Your desired performance is muμ ​= 12.00 plus or minus ±3 standard​ deviations, where sigmaσ ​= 0.070. For the given​ information, the process capability index ​(Cpk​) = _____ ​(round your response to three decimal​ places).

  • Linda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample cutoff valve to improve...

    Linda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample cutoff valve to improve your manufacturing process. Your process engineering department has conducted experiments and found that the valve has a mean (μ) of 9.00 and a standard deviation (σ) of 0.04. Your desired performance is μ 9.00 3 standard deviations, where ơ-0.020. For the given information, the process capability index (Cpk)(round your response to three decimal places)

  • Linda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample cutoff valve to improve...

    Linda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample cutoff valve to improve your manufacturing process. Your process engineering department has conducted experiments and found that the valve has a mean (u) of 10.00 and a standard deviation (o) of 0.05. Your desired performance is u = 10.00 + 3 standard deviations, where o = 0.060. For the given information, the process capability index (Cok) = (round your response to three decimal places).

  • Question 10 1 pts Linda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample...

    Question 10 1 pts Linda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample cutoff valve to improve your manufacturing process. Your process engineering department has conducted experiments and found that the valve has a mean (u) of 8.00 and a standard deviation (o) of .04. Your desired performance is u = 8.0 +30, where o= .045. a. What is the Upper Specification = [ Select] and the Lower Specification = [Select] b. What is the Cpk of...

  • Problem 7.1 Question Help Borges Machine Shop, Inc., has a 1-year contract for the production of...

    Problem 7.1 Question Help Borges Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: Annual contracted units Annual fixed cost Per unit variable cost General Purpose Equipment (GPE)...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT