Arthur Meiners is the production manager of Wheel-Rite, a small producer of metal parts. Wheel-Rite supplies Cal-Tex, a larger assembly company, with 10,700
wheel bearings each year. This order has been stable for some time. Setup cost for Wheel-Rite is $41 and holding cost is $0.50 per wheel bearing per year. Wheel-Rite can produce 480 wheel bearings per day. Cal-Tex is a just-in-time manufacturer and requires that 50 bearings be shipped to it each business day.
a) What is the optimum production quantity?.
b) What is the maximum number of wheel bearings that will be in inventory at Wheel-Rite?
c) How many production runs of wheel bearings will Wheel-Rite have in a year?
d) What is the total setup plus holding cost for Wheel-Rite?
Production rate(p) = 480 per day
Demand rate(d) = 50 per day
Annual demand(D) = 10700 units
Set up cost(S) = $41
Holding cost (H) = $0.50
A) Optimum production size(Q) = sqrt of {2DS / H [1-(d/p)]}
= sqrt of {(2x10700x41) /0.50[1-(50/480)]}
= Sqrt of [877400/0.50(1-0.10417) ]
= sqrt of [877400/(0.50 x 0.89583)]
= sqrt of (877400/0.447915)
= √1958853.8003
= 1400 units
b) Maximum inventory ( I - max) = (Q/p) (p-d) = (1400/480)(480-50) = 2.917 x 430 = 1254.31 or rounded off to 1254 units
C) Number of production run per year = D/Q = 10700/1400 = 7.64
d) Annual holding cost = [(I-max / 2) H] = (1254/2)0.50 = $313.50
Annual setup cost = (D/Q) S = (10700/1400)41 = $313.36
Total cost = Annual holding cost + Annual setup cost
= $313.50 + $313.36
= $626.86
Arthur Meiners is the production manager of Wheel-Rite, a small producer of metal parts. Wheel-Rite supplies...
Arthur Meiners is the production manager of Wheel-Rite, a small producer of metal parts. Wheel-Rite supplies Cal-Tex, a larger assembly company, with 10,700wheel bearings each year. This order has been stable for some time. Setup cost for Wheel-Rite is $39 and holding cost is $0.60 per wheel bearing per year. Wheel-Rite can produce 520 wheel bearings per day. Cal-Tex is a just-in-time manufacturer and requires that 48 bearings be shipped to it each business day. a) What is the optimum...
The Cut-Rite Company is a major producer of industrial lawn mowers. The cost to Cut-Rite for hiring a semi-skilled worker for its assembly plant is $3000, and the cost for laying off one worker is $2000. With its current work force of 720 workers, the plant can produce 36,000 lawn mowers per quarter. Regular-time capacity in any quarter is directly proportional to the number of employees. Overtime is limited to a maximum of 5,000 mowers per quarter. The costs to...
Need help within 30 minutes please! JL.52 A producer of industrial climate control modules has recently changed to cellular manufacturing. The production facility operates 250 days per year and has annual demand of 6,500 units They can produce up to 80 modules each day. It costs $18.50 to set up a work cell to produce this module. The cost of each module is $32 and annual holding costs are $4 per unit. Setup labor cost is $14 per hour. What...
The production floor produces 8500 units/day and the associated direct-operated store sells 50 units/hour with the selling price at $120/unit. The direct-operated store operates 12 hours/day and 365 days/year, but the production works for 250 working days/year. Given that the production setup cost per production run is $1500 and the holding cost per year is $5/unit. (a) Calculate the optimal batch size for each production run. (b) What is the maximum inventory level with regard to the optimal batch size?...
Emarpy Appliance is a company that produces all kinds of major appliances. Bud Banis, the president of Emarpy, is concerned about the production policy for the company's best-selling refrigerator. The annual demand for this has been about 7,250 units each year, and this demand has been constant throughout the year. The production capacity is 190 units per day. Each time production starts, it costs the company $110 to move materials into place, reset the assembly line, and clean the equipment....
QUESTION 2 A company is about to begin production of a new product. The manager of the department wants to know how often the machine used to produce the current item will be available for the production of the new product. The machine produces the current item at a rate of 220 units a day. 70 units will be used daily in assembling the final product. Assembly takes place five days a week, 50 weeks a year. The manager estimates...
Ross White’s machine shop uses 2,500 brackets dur- ing the course of a year, and this usage is relatively constant throughout the year. These brackets are purchased from a supplier 100 miles away for $15 each, and the lead time is 2 days. The holding cost per bracket per year is $1.50 (or 10% of the unit cost) and the ordering cost per order is $18.75. There are 250 working days per year. (a) What is the EOQ? (b) Given...
I Think I have the first part down. I just need help on the last
four questions with the 12 day cycle. Thank you!
A company is about to begin production of a new product. The manager of the department wants to know how often the machine used to produce the current item will be available for the production of the new product. The machine produces the current item at a rate of 170 units a day. 80 units will...
JL.51 Carl's Custom Cans produces small containers which are purchased by candy and snack food producers. The production facility operates 250 days per year and has annual demand of 12,000 units for one of its custom cans. They can produce up to 110 of these cans each day. It costs $58.51 to set up one of their production lines to run this can. (Carl pays $16 per hour for setup labor.) The cost of each can is $2.20 and annual...
Bradley's Copiers sells and repairs photocopy machines. The manager needs weekly forecasts of service calls so that he can schedule service personnel. Use the actual demand in the first period for the forecast for the first week so error measurement begins in the second week. The manager uses exponential smoothing with α- 0.4. Forecast the number of calls for week 6, which is next week. Week Actual Service Calls 28 34 3 38 4 23 25 5 The forecast for...