Lee Limited‘s factory comprises of two production departments, Milling and Finishing, and two service departments Maintenance...

Lee Limited‘s factory comprises of two production departments, Milling and Finishing, and two service departments Maintenance and Administration. The following estimated data are provided:

    Production department

        Service department

Milling

Finishing

Maintenance

Administration

Budgeted overheads

R524 000

R480 000

R240 000

R150 000

Machine hours

    30 000

    20 000

Area occupied (m²)

      6 300

      2 700

       1 200

          900

Number of employees

        150

         100

            40

            30

Note:                                                                                                                                                 

  • Administration department cost is allocated based on number of employees.
  • Maintenance department cost is allocated based on area occupied.
  • Production overheads are calculated based on machine hours.

Required:     

Calculate the Production Overhead for the Administration Department. (6)    

Calculate the Production Overhead for the Maintenance Department. (5)  

Calculate the Production Overhead for Milling and Finishing (separately) based on machine hours. (5)

Differentiate between period cost and product cost. (4)

                                                                                                                 

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Lee Limited‘s factory comprises of two production departments, Milling and Finishing, and two service departments Maintenance...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Anderson Enterprises has three service departments, Administration, Maintenance and security and two production departments, Machining and...

    Anderson Enterprises has three service departments, Administration, Maintenance and security and two production departments, Machining and Assembly. Total Manufacturing overhead was either directly traced or allocated to all of the departments resulting gin a total of $300,000 of overhead in the Maintenance Department, $240,000 in the administration department, $135,000 in the security department, $1,000,000 in the machining department and $300,000 in the assembly department. The company allocates service department cost using the step method. The maintenance department overhead is allocated...

  • 4.   ABC Company has two service and three production departments. Building Maintenance and Factory office are...

    4.   ABC Company has two service and three production departments. Building Maintenance and Factory office are the service departments. The production departments are ASSEMBLY, Machining and Finishing. The following data have been estimated for next years operations: Direct labor hours: Asswmbly,45,000; Machining,35,000;Finishing 40,000 Floor space occupied: factory office 15%; Assembly, 35%; Machining 25%, Finishing 25% The direct charges expected to be made to the departments are as follows: Building maintenance $120,000 Factory office $171,000 Assembly $378,000 Machining $225,000 Finishing $225000...

  • 1. ABC Company has two service and three production departments. Building Maintenance and Factory office are...

    1. ABC Company has two service and three production departments. Building Maintenance and Factory office are the service departments. The production departments are ASSEMBLY, Machining and Finishing. The following data have been estimated for next years operations: Direct labor hours: Asswmbly,45,000; Machining,35,000;Finishing 40,000 Floor space occupied: factory office 15%; Aaaembly, 35%; Machining 25%, Finshing 25% The direct charges expected to be made to the departments are as follows: Building maintenance $120,000 Factory office $171,000 Assembly $378,000 Finishing $225000 The building...

  • Rowe Industries Ltd operates a manufacturing plant with three production departments: Machining, Assembly and Finishing, and...

    Rowe Industries Ltd operates a manufacturing plant with three production departments: Machining, Assembly and Finishing, and three service departments: Canteen, Store and Engineering Shop, as shown in Table 1. TABLE 1: DETAILS OF PRODUCTION AND SERVICE DEPARTMENTS Details Machining Assembly Finishing Store Canteen Engineering Shop Allocated Overhead $586 000 $418 000 $322 000 $118 000 $115 000 $158 000 Number of Employees 40 75 60 10 – 15 Number of Orders 100 80 125 – – 55 Service Hours 1500...

  • Petty Corporation has two production departments, Milling and Finishing. The company uses a Job-order costing system...

    Petty Corporation has two production departments, Milling and Finishing. The company uses a Job-order costing system and computes a predetermined overhead rate in each production department. The Milling Depart predetermined overhead rate is based on machine-hours and the Finishing Department's predetermined overhead rate is based on direct labor-hours. At the beginning of the current year, the company had made the fo estimates: Milling 20,000 2,000 $148,000 $ 1.90 Finishing 14,000 8,000 $88,000 Machine-hours Direct labor-hours Total fixed manufacturing overhead cost...

  • QUESTION 2) Hannover Manufacturing Company has three service departments and three production departments. The company budgeted...

    QUESTION 2) Hannover Manufacturing Company has three service departments and three production departments. The company budgeted its manufacturing overhead (MOH) cost for the upcoming year of 2020 as follows: Service Departments Production Departments Factory Repair and Management Cafeteria Maintenance Cutting Molding Finishing 425,000 375,000 95,000 700,000 920,000 485,000 I. Allocation in USD). Space occupied (m²) Number of employees Maintenance hours 500 1,000 200 3,000 4,500 4,000 125 55 22 680 150 720 80 50 0 250 400 300 Machine hours...

  • Mitz company has two service​ departments, maintenance and human resources. marvelous company also has two production​...

    Mitz company has two service​ departments, maintenance and human resources. marvelous company also has two production​ departments, mixing and finishing. maintenance costs are allocated based on square footage while human resources costs are allocated based on number of employees. the following information has been gathered for the current​ year: maintenance human resources mixing finishing direct costs ​$50,400 ​$33,600 ​$42,000 ​$70,000 square footage ​1,600 800 ​3,200 ​2,400 number of employees 16 24 48 64 assume the step-down method is used to...

  • Rice company has two production departments called assembly and finishing. the maintenance department serves both production...

    Rice company has two production departments called assembly and finishing. the maintenance department serves both production departments. maintenance costs are allocated based on labor hours. budgeted fixed costs for the maintenance department are​ $40,000. budgeted variable costs for the maintenance department are​ $4.00 per labor hour. other relevant data​ follow: assembly finishing capacity available ​18,000 labor hours ​12,000 labor hours capacity used ​15,000 labor hours ​9,000 labor hours actual maintenance department​ costs: fixed ​$36,000 variable ​$100,000 the amount of fixed...

  • 2. The Galaxy Company has two service departments (Power and maintenance) and two production departments (Machinery...

    2. The Galaxy Company has two service departments (Power and maintenance) and two production departments (Machinery and Assembly). Additional information is given below: Kilowatt Maintenance Cost Hours Hours Machinery 450,000 39,000 1,600 Assembly 210.000 15,000 2,400 Power 135,000 5,500 1,000 Maintenance 90,000 6,000 600 Costs of Power department are allocated on the basis of Kilowatt Hours. The Costs of Maintenance department are allocated on the basis of Maintenance Hours. Total machine hours worked in Machinery Department is 2,500 and total...

  • 2. The Galaxy Company has two service departments (Power and maintenance) and two production departments (Machinery...

    2. The Galaxy Company has two service departments (Power and maintenance) and two production departments (Machinery and Assembly). Additional information is given below: Kilowatt Maintenance Cost Hours Hours Machinery 450,000 39,000 1,600 Assembly 210.000 15,000 2,400 Power 135,000 5,500 1,000 Maintenance 90,000 6,000 600 Costs of Power department are allocated on the basis of Kilowatt Hours. The Costs of Maintenance department are allocated on the basis of Maintenance Hours. Total machine hours worked in Machinery Department is 2,500 and total...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT