Assignment LP Model
The Shang-ho Project Development and Construction Company has just been awarded a chemical plant construction contract. The contract terms require that at least five (5) other smaller companies be awarded subcontracts for portions of the total work. Shang-ho therefore requested bids from five (5) shortlisted small companies to do subcontract work in five (5) areas. Because of the production capacity, each company can work only in one area.
The bids submitted by the companies, in thousands of dollars, are as follows:
| Company | 1 | 2 | 3 | 4 | 5 |
| A | $10 | $6 | $4 | $8 | $3 |
| B | 2 | 9 | 7 | 7 | 6 |
| C | 6 | 11 | 12 | 5 | 9 |
| D | 5 | 4 | 2 | 1 | 4 |
| E | 5 | 9 | 8 | 5 | 9 |
Required:
a. Use the Hungarian (manual) method, to determine which bid Shang-ho should accept in order to minimize overall costs. [12 marks]
b. Write an LP formulation that could be used to solve this problem. [13 marks]
Answer:
Hungarian (manual) method
Step 1: Subtract row minimums from each row

Step 2: Subtract column minimums from each column

Step 3. Cover all the zeros of the matrix with the minimum number of horizontal or vertical lines

Step 4. Note that the number of these lines = 4 which is less than the no. of resources (= 5), so we yet have to achieve optimality.
Step 5. Subtract smallest uncovered no. (= 1, in this case) from all uncovered elements, and add it to all elements that are covered twice (horizontal and vertical lines). Then repeat Step 3.

Note that since the number of lines is equal to that of the resources (= 5), we have reached optimality. The optimal assignment is as follows:

LP formulation
Let Xij be the binary integer such that Xij=1 when i-th company is assigned to the jth task.
Minimize Z =
10 X11 + 06 X12 + 04 X13 + 08 X14 + 03 X15 +
02 X21 + 09 X22 + 07 X23 + 07 X24 + 06 X25 +
06 X31 + 11 X32 + 12 X33 + 05 X34 + 09 X35 +
05 X41 + 04 X42 + 02 X43 + 01 X44 + 04 X45 +
05 X51 + 09 X52 + 08 X53 + 05 X54 + 09 X55
Subject to,
Xi1 + Xi2 + Xi3 + Xi4 + Xi5 = 1; i=1,2,..,5
X1j + X2j + X3j + X4j + X5j = 1; j=1,2,..,5
Xij = {0,1}
---------------------

Solution

NOTE:: I HOPE YOUR HAPPY WITH MY ANSWER....***PLEASE SUPPORT ME WITH YOUR RATING..
THANK YOU
Assignment LP Model The Shang-ho Project Development and Construction Company has just been awarded a chemical...
Five construction companies each offer bids on three DISTINCT Department of Transportation (DOT) contracts. A particular company will be awarded at most one DOT contract. a) How many different ways can the bid be awarded? b) Under the assumption that the simple events are equally likely, find the probability that company 2 is awarded a DOT contract. c) Suppose that companies 4 and 5 have submitted non-competitive bids. If the contracts are awarded at random by the DOT, find the...
Assignment 2 Question 1 Your company was awarded a culvert contract. The contract manager has appointed you to manage the project and has requested you to provide a schedule for the client. The contract manager handed you the table below, showing a breakdown of activities involved, together with their duration. The Start date is the 01/02/2021 (1st February 2021) Working week of 5 days, 40 hours must be use. Task Name 1 Setting out Excavation 2 Earthworks/Site Clearing 3 Bulk...
Q4. The Ventron Engineering Company has just been awarded a £2 million development contract by the British Army Aviation Systems Command to develop a blade spar for its Heavy Lift Helicopter program. The blade spar is a metal tube that runs the length of and provides strength to the helicopter blade. Due to the unusual length and size of the Heavy Lift Helicopter blade, Ventron is unable to produce a single-piece blade spar of the required dimensions using existing extrusion...
Question 1: What is a joint venture and why might two construction firms choose to form one? (4 points) Case Study 1: Please answer the first 4 questions with the following case data for Project 101 and Project 102. A construction company began operations on January 2, 2010. During the year the company was awarded three construction contracts. The company incurred $300,000 operating expenses for the year for which $275,000 has been paid while the balance is owed as of...
financial management Sprint Bolt Ltd is a producer of specialised sport shoes. The company has been conducting research and development of a new model, where the lower mould can automatically adjust itself to avoid foot injury. The model has been tested and the managing board is happy to launch its production if it is financially viable. The company has already spent $800,000 for research and development. The new model will have a five- year lifetime, after that the company will...
Scenario: Your organisation, ABC construction group has made a winning bid to construct a new manufacturing plant. The client expects the plant to be functional within a year. You are assigned as the Project Manager to ensure that the whole project stays on schedule. The two important conditions as per the client contract are:- ABC construction group will incur a penalty if the work is not completed by the deadline of 47 weeks from now. ABC construction group will be...
TORENTO CONSTRUCTION: ETHICAL CONTRACTING On December 27, 2010, Cary Holmes, manager of the Supply Chain Management (SCM) group at Torento Construction Inc. (NCG), was in his office in Torento, Ontario, trying to organize the thoughts running through his head as a result of a recent bidding to save operating costs at NCG. There was no problem in terms of the final outcome; in fact, the bid was going to result in cost savings of 25 per cent, which was exactly...
Books Inc. is a company that sells college textbooks. Books Inc. has been successful in the past, but the CEO, Mr. Lawrence, has recently discovered some problems. The company’sprofits have been decreasing considerably over the last couple of months. Books Inc. was started in 2012 when Caroline Garitano and Robert Lawrence came up with the idea of selling their old college textbooks online. When Caroline and Robert started the business, they did not think about organization structure and control measures....
Help needed for Project procurement to answer Questions 1-10: Building Trust Pauly Shore is a junior procurement manager for the Goldwell Restaurant Group. He is responsible for the procurement of IT commodities for the data center. After months of negotiating with the three best and lowest-priced bidders for the computer paper contract, Pauly selected Frankie’s Paper Company. Pauly’s decision was made after a round of golf at Frankie’s country club. On the eighteenth hole, Frankie extended his hand to Pauly and...
can
you please answer question 1 and 3 please
ABC General Contractors ABC General Contractors was an established construction company handling small-to medium- sized commercial and industrial construction projects. Some recent projects that the company had completed were a 20,000-square-foot factory building, a four-story office building, and a water filtration plant. TELEVISION TOWER BID The company was now in the process of preparing a bid for a television station for the erection of a 225-foot-high television antenna tower and the...