The estimated development cost of this new service is $12,000 for all the six locations. If the ramp-up and marketing support cost are estimated at $2,300 for each location. Calculate the estimated cash flow for the six (6) consulting service locations if the total revenue for the entire locations is $19,816. Will the new consulting firm break even, make profit or loss for this new service? NB: This is a single time period cash flow question.
Total cash flow
Total revenue= 19816
Less: estimated development cost= 12000
LesS:Total ramp up and marketing cost= 2300*6 = 13800
Net cash flow= -5984
Hence the new consulting firm will make a loss.
The estimated development cost of this new service is $12,000 for all the six locations. If...
Development cost
$
1,300,000
Estimated development time
9
months
Pilot testing
$
200,000
Ramp-up cost
$
400,000
Marketing and support cost
$
150,000
per year
Sales and production volume
60,000
per year
Unit production cost
$
100
Unit price
$
210
Interest rate
8
%
Assume all cash flows occur at the end of each period.
a. What is the net present value (discounted at
8%) of this project? Consider all costs and expected revenues.
(Enter your answer in thousands...
The product development cost of Canon CI-700 is as follows. Suppose production volume is 5,000 per year, what is annual profit? How many years does it take to break-even? (10pt) Setup cost $3 million Ramp-up cost $2 million Marketing and support cost $1 million/year Unit production cost $400/unit Unit price $800/unit
1. Certain new machinery, when placed in service, is estimated to cost $180,000. It is expected to reduce net annual operating expenses by $36,000 per year for 10 years and to have a $30,000 MV at the end of the 10th year. Assume that the firm is in the federal taxable income bracket of $335,000 to $10,000,000 and that the state income tax rate is 6%. State income taxes are deductible from federal taxable income. Suppose the machinery had been...
A new registration system for the university is being considered. The acquisition (development) cost is $50,000. For the life of the system (5 years), the estimated operating costs are $10,000 per year and the estimated benefit is $5 per student per year. 2. Consider the acquisition cost as a sunk cost. How many students are required to register per year to pay the fixed operating costs? a. b. Calculate the break-even point, number of students per year to pay for...
The Tuff Wheels was getting ready to start its development
project for a new product to be added to their small motorized
vehicle line for children. The new product is called the Kiddy
Dozer. It will look like a miniature bulldozer, complete with
caterpillar tracks and a blade. Tuff Wheels has forecasted the
demand and the cost to develop and produce the new Kiddy Dozer. The
table below contains the relevant information for this project.
Development cost
$
800,000
Estimated...
The Tuff Wheels was getting ready to start its development project for a new product to be added to their small motorized vehicle line for children. The new product is called the Kiddy Dozer. It will look like a miniature bulldozer, complete with caterpillar tracks and a blade. Tuff Wheels has forecasted the demand and the cost to develop and produce the new Kiddy Dozer. The table below contains the relevant information for this project. Development cost Estimated development time...
The Tuff Wheels was getting ready to start its development
project for a new product to be added to their small motorized
vehicle line for children. The new product is called the Kiddy
Dozer. It will look like a miniature bulldozer, complete with
caterpillar tracks and a blade. Tuff Wheels has forecasted the
demand and the cost to develop and produce the new Kiddy Dozer. The
table below contains the relevant information for this project.
Development cost
$
1,100,000
Estimated...
The Tuff Wheels was getting ready to start its development project for a new product to be added to their small motorized vehicle line for children. The new product is called the Kiddy Dozer. It will look like a miniature bulldozer, complete with caterpillar tracks and a blade. Tuff Wheels has forecasted the demand and the cost to develop and produce the new Kiddy Dozer. The table below contains the relevant information for this project. Development cost Estimated development time...
The Tuff Wheels was getting ready to start its development project for a new product to be added to their small motorized vehicle line for children. The new product is called the Kiddy Dozer. It will look like a miniature bulldozer, complete with caterpillar tracks and a blade. Tuff Wheels has forecasted the demand and the cost to develop and produce the new Kiddy Dozer. The table below contains the relevant information for this project. Development cost Estimated development time...
Problem 3-10 The Tuff Wheels was getting ready to start its development project for a new product to be added to their small motorized vehicle line for children. The new product is called the Kiddy Dozer. It will look like a miniature bulldozer, complete with caterpillar tracks and a blade. Tuff Wheels has forecasted the demand and the cost to develop and produce the new Kiddy Dozer. The table below contains the relevant information for this project. Development cost Estimated...