Question

A waste management company handles large dumpsters of construction debris. The sorting process starts by downloading...

A waste management company handles large dumpsters of construction debris. The sorting process starts by downloading the dumpster from the transport truck and then dumping its contents into a large hopper as shown below. The waste management plant uses a hydraulic cylinder arrangement to tilt the dumpster to the point that the force of gravity will empty the contents. The plant operator activates an electric pump that pumps hydraulic oil into the input piston at an absolute pressure of 3.50 106 Pa and drives the output plunger, which has a radius of 0.110 m. If the design of the dumping arrangement is such that the output plunger remains perpendicular to the floor of the dumpster, determine the torque the plunger creates about an axis at the end of the dumpster.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

what is the distance from output plunger to the end of dumpster ????? please see the figure ( you have not provided the figure) . Some distance must be given in the figure................

------------------------------------------------

we know

torque = force * lever arm

and

force = pressure * area

here, pressure will be gauge pressure

gauge pressure = absolute pressure - atmospheric pressure

so,

torque = (P - Patm ) * * r2 * d

torque = ( 3.50e6 - 1.013e5) * * 0.112 * d

torque = 129195.7 * d

just multiply the given distance in the diagram and you have the answer. Let me know if you have any doubt.

Thank you.

Add a comment
Know the answer?
Add Answer to:
A waste management company handles large dumpsters of construction debris. The sorting process starts by downloading...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A waste management company handles large dumpsters of construction debris. The sorting process starts by downloading...

    A waste management company handles large dumpsters of construction debris. The sorting process starts by downloading the dumpster from the transport truck and then dumping its contents into a large hopper as shown below. The waste management plant uses a hydraulic cylinder arrangement to tilt the dumpster to the point that the force of gravity will empty the contents. The plant operator activates an electric pump that pumps hydraulic oil into the input piston at an absolute pressure of 2.80...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT