Question

Complete the following 3 problems and attach your work. The UMass IIE student chapter is going...

Complete the following 3 problems and attach your work.

  1. The UMass IIE student chapter is going to run a fundraising event from 1pm through 5pm. Due to the large scale of the event, student workers will be hired to work for the event and each worker will be assigned to a particular shift. There are three shifts: 1pm-3pm, 2pm-4pm, 3pm-5pm. The pay for each of the three shifts is $20, $24 and $28 per worker respectively. The minimum number of workers needed for each hour is listed below: 1pm-2pm: 20, 2pm-3pm: 25, 3pm-4pm: 25, 4pm-5pm: 30. ASCE would like to minimize the hiring cost while satisfying the demand of workers in each hour. Answer the following questions:
  1. Define the decision variables.
  2. Write down the objective function.
  3. Write down the constraint that the demand of workers for 2pm-3pm is satisfied.

  

  1. For the optimization problem below:
  1. Neatly sketch the feasible region.
  2. Plot one objective function line and indicate the direction of improvement.
  3. Give the optimal solution and the corresponding objective function value.

Maximize Z=3x1+4x2

       ST:   4x1+2x2≤20

6x1+6x2≤30

2x1+4x2≤16

x1,x2≥0

   

  1. For the linear programming problem in Question 2, answer the following questions regarding solving it with the simplex method.
  1. Develop the augmented form for this problem.
  2. Identify the slack variables, an initial basic feasible (BF) solution (including basic and nonbasic variables), and the value of the objection function. Finally, determine whether the current BF solution is optimal and explain why/why not.
  3. Perform one iteration to proper form from Gaussian elimination complete with the minimum ratio test, identification of the entering and leaving basic variable, and resulting values of both the BF solution and the objective function.
0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Complete the following 3 problems and attach your work. The UMass IIE student chapter is going...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question 3 The following table shows the staffing requirements for a restaurant at different hours. Assume...

    Question 3 The following table shows the staffing requirements for a restaurant at different hours. Assume each staff member works four-hour shifts. 8am 9am 10am 11am Noon 1pm 2pm 3pm 4pm 5pm 6pm 7pm Requirements 2 3 5 8 8 6 5 8 8 6 4 3 Use the first-hour principle to find the personnel schedule. For each hour, determine the amount of workers that should be assigned, the amount that are on duty and the amount of excess staff....

  • for last thing, these are 2 methods that we learned in class Theorem 1 (Sufficient Optimality...

    for last thing, these are 2 methods that we learned in class Theorem 1 (Sufficient Optimality Criterion): If x0 and y0 are feasible solutions to the primal and dual problems such that z = cx0 = y0b = w, then x0 and y0 are optimal solutions to their respective problems. Theorem 2 (Strong Duality): In a primal-dual pair of LPs, if either the primal or the dual problem has an optimal feasible solution, then the other problem does also have...

  • Problem 1-1 A farmer owns 450 acres of land. He is going to plant each acre...

    Problem 1-1 A farmer owns 450 acres of land. He is going to plant each acre with wheat or corn. Each acre planted with wheat yields $4000 profit, requires three workers, and requires two tons of fertilizer. Each acre planted with corn yields $2000 profit, requires two workers, and requires four tons of fertilizer. There are currently 1000 workers and 1200 tons of fertilizer available. To hedge against risk, the farmer wants to sure that the acres of wheat do...

  • Exercise 2 Linear Programming 1.         The Scrod Manufacturing Co. produces two key items – special-purpose Widgets...

    Exercise 2 Linear Programming 1.         The Scrod Manufacturing Co. produces two key items – special-purpose Widgets (W) and more generally useful Frami (F). Management wishes to determine that mix of W & F which will maximize total Profits (P). Data                                                                      W      F             Unit profit contributions                     $ 30   $ 20             Demand estimates (unit/week)               250      500             Average processing rates – each product requires processing on both machines (units/hour)                                     Machine #1                        2          4                                        Machine #2                ...

  • Use the scenario below to answer all of the questions. Show all of your work on handwritten pages...

    Use the scenario below to answer all of the questions. Show all of your work on handwritten pages. Take pictures of your page. Upload the pictures to this assessment on Engage. A farmer in upstate New York has a 100-acre farm to plant red beans and romaine lettuce. Every acre planted with beans requires 50 gallons of water per acre and consumes 20 pounds of fertilizer. Every acre planted with lettuce requires 75 gallons of water and 15 pounds of...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT