You developed the WBS of multiple levels, including work packages at the low- est level based on the initial project requirements below, which were further elaborated. Building a single-family, partially custom-designed home as required by Mrs. and Mr. John Thomas on Strath Dr., Alpharetta, Georgia. The single-family home will have the following features: 3,200 square-feet home with 4 bedrooms and 2.5 bath- rooms Flooring hard wood in the first floor, tiles in the kitchen and bathrooms, carpet in bedrooms Granite kitchen countertops, GE appliances in the kitchen 3-car garage and external landscaping Ceiling 10 in first floor and vaulted 9 ceilings in bed- rooms High-level Assumptions and Constraints The list of options is limited and the cost of the house would vary based on options selected. The client must choose one from among the models offered. 7-year warranty for structure and 2-year warranty for finish- ing components After the WBS was developed, it is necessary to identify risks associated with the project and include prioritized risks in revising cost and schedule estimates. For this purpose, you were asked to develop a comprehensive risk manage- ment plan.
TASK TO COMPLETE:
Develop a risk breakdown structure in Microsoft Excel or in Microsoft word (using tables).
| Risk Breakdown Structure for single-family, partially custom-designed home | Risk Breakdown Structure for single-family, partially custom-designed home | |||||||
| People | Deliverables | Time | Costs | Quality | Contract | Market | Category wise - Internal Risk | Category wise - External Risk |
| Labor Shortage | Probability of Technical Success | Schedule Delays | Estimating Errors | Warranty Exposure and Issues with approved Warranty | Lack of Clarity | Various Opportunity in the Current Market | Labour, Materials, Site, Sub- Contractor | Economic, Physical |
| Labor strike | Issues with parts and Components | Issue may arise with Schedules changes | Exchange Rates | Performance Issue | Disputes | Threats in current Market | Construction, Client, Design | Political |
| Skill Deficiency | Design not released officially and Under Approval Process, | Force Majeure | Issue may arise with Scope changes | Defect and Defective for various parts and Components/ Subcontractor Items | Failure and Performance issues with Subcontractor | Probability for the project success | Contractual, Internal Environmental | Technological Changes and Legal Obligation |
| Issue with Unions | Design those approved need review over time, | Penalty consideration | Funding | Company and Project Finance | ||||
| Performance issue with Subcontractor People | Problem Escalation | Location and Management | ||||||
You developed the WBS of multiple levels, including work packages at the low- est level based...