The capital cost of Waste-Water Treatment Plant for Gambang Town
of 150,000 people
was estimated to be RM75.00 per person in 1995. If the modest
estimate of the rate of
inflation is 4.0% for the period to 2015, what is the per capita
capital cost of the
Treatment Plant now?
for 1995 capital cost is 75 per person.
so total capital cost for Waste-Water Treatment Plant= 75*150000
=11250000
here rate of infletion is given. means every year 4% will cumpounded in capital cost.
A=P(1+r)n
A=11250000(1+0.04)20
(r= interest rate, n= cumpound year time duration, P= amount)
A=24650135
so total capital cost for Waste-Water Treatment Plant is 24650135
so per capita capital cost of theTreatment Plant = 24650135/ total population
=24650135/150000
=164.33
The capital cost of Waste-Water Treatment Plant for Gambang Town of 150,000 people was estimated to...
A model town with a population of 100000 people has a drinking water treatment plant. As an engineer, you are asked to design a sand filter system for the town. Determining: a) the total area of the filter, b) how many filter cells are needed if each filter cell has an area of 30 m2, c) depth of the sand, d) filtration rate, e) backwash rate if a rotary-jet-type surface wash is used, and f) the quantity of treated water...
What are major differences between water treatment and waste water treatment plant? What is Short-Circuiting? Describe three Classifications of wastewater! What is Comminutor? What is activated sludge system? Describe it.
A new water treatment facility will be built to supply water to the town of Freemont. The town's population is currently 14,000 and the per capita water use is 100 gal per day. The new facility will be designed to account for increases in both per capita water use and population growth, and projections for water use will be determined for fifty years in the future. The population of the town of Freemont grows at an average rate of 2%...
Please help with this environmental engineering problem
A new water treatment facility will be built to supply water to the town of Freemont. The town's population is currently 14,000 and the per capita water use is 100 gal per day. The new facility will be designed to account for increases in both per capita water use and population growth, and projections for water use will be determined for fifty years in the future. The population of the town of Freemont...
A 50-mgpd (million gallons per day) water treatment plant was proposed in 2017 for Ureka. A 60- mgpd plant using the same treatment process was built in 2010 in Vancouver for $50,000,000. Given the following additional information and assumptions: Poor site condition in Vancouver required an additional $3,000,000 for foundations, which is not anticipated for Ureka. Assume the power sizing size exponent = 0.67. Assume inflation will persist at an average 5% per annum. Assume the location index for Vancouver...
A new water treatment facility will be built to supply water to the town of Freemont. The town’s population is currently 14,000 and the per capita water use is 100 gal per day. The new facility will be designed to account for increases in both per capita water use and population growth, and projections for water use will be determined for fifty years in the future. The population of the town of Freemont grows at an average rate of 2%...
EXAMPLE 6.8 Sizing a Primary Clarifier A town of 30,000 sends 0.5 m3 of wastewater per person per day to the waste- water treatment plant. A conventional circular primary clarifier would be designed to have an average detention time of 2.0 hours and an average overtlow rate of 40 m/d, whereas a high-rate clarifier would have an average overflow rate of 1,500 m/d. a. What would be the dimensions of the conven tional clarifier? Ab Db b. How much area...
The town of Recycleville has 30,000 citizens.Each home in Recycleville generates 1.1 tons of solid waste per year and has an average of 2.4 residents per service customer.The town has no commercial businesses or schools.The local landfill has space for 100,000 tons and charges $10 per ton.Once the landfill is full,the waste will need to be sent to a remote landfill at a cost of $90 per ton.What is the 10-year average disposal cost for the town,assuming a rate of...
16. A water treatment plant will last for 15 years. The cost of the water treatment process has been decreasing according to a uniform gradient. The cost in year 1 was $10,000 and in year 2 it was $9,500, with costs decreasing by $500 each year till years 15. At an interest rate of 10% per year, the present worth (in year 0) of the water treatment cost is closest to A. $52,321 B. $56,061 C. $96,136 D. $55,984 17....
The purchased equipment cost, PEC (or delivered equipment cost, E) for a plant which produces 70000 ton methanol per year is estimated to be 110 x 106 TL. All other costs are close to the average values found for typical chemical plants. The cost data: Raw Material (Carbondioxide, Hydogen) and catalyst cost, Crm= 15 x 106 TL/year Operating Labor Cost, Col= 5 x 106 TL/year Utility Cost (Electricity, water, etc.), Cur= 6 x 106 TL/year Waste Treatment Cost, Cwr= 4...