A quality control inspector samples 40 screws from a machine, and calculates the average as 1.960, and standard deviation as 0.08. The machine is set to produce screws which are 2 inches long on average. If the screws produced are too long or too short, the machine is shut down for repairs. The machine is assumed OK until proven otherwise. (The population of the screw lengths produced by the machine is normally distributed.) Use α = 0.05
Calculate the test statistic. What is the conclusion of this test?
|
test statistic = 3.16; evidence not convincing ... keep operating |
||
|
test statistic = -3.16; shut the machine down for repairs. |
||
|
test statistic = -2.50; shut the machine down for repairs. |
||
|
test statistic = 3.16; shut the machine down for repairs. |
||
|
test statistic = -3.16; evidence not convincing ... keep operating |
* I found the test statistic to be -3.16, but I do not know if the machines should be left operating. Please help.
A quality control inspector samples 40 screws from a machine, and calculates the average as 1.960,...
Elroy had been with Barnes Machine Company a year since finishing a BS in industrial engineering (IE). Barnes had been in business for over 50 years, but the company had only recently moved from Detroit to Gainesville, Georgia. The public reason for the move was the economics of the old facility. Privately, based on comments he had heard, Elroy believed a shift to nonunion labor was a larger motive. Elroy’s boss is the production supervisor, Mr. Hill. Because the plant...