Rick’s vacuum of Muncie uses the pull method to supply hoses to an assembly line. Rick’ss employee Dave Carey is in charge of the assembly line, which requires 900 hoses per day. One containers typically waits 6 hours in the fabrication cell. Each container holds 400 hoses, and one container requires 43 hours in processing time. Setup time is zero. Currently 5 containers are used for this item. 1 day is equal to 24 hours.
A. What is the average waiting time for one container expressed in days.
B. What is the average processing time for one container expressed in days
C. What is the value of the policy variable alpha
(A) Average waiting time for one container expressed in days = 0.2083 days
6hrs / 24hrs = 0.2500 days
(B) Average processing time for one container expressed in days = 1.7916 days
Processing time per container = 43 hrs / 24 hrs = 1.7916 days
(C) Value of the policy variable alpha
Number of containers = 5
Demand rate = 900 per day
Container size = 400 hoses
Container size x Number of containers = Demand rate x (Average
processing time for one container + Average waiting time for one
container) x (1 + α)
i.e 400 x 5 = 900 x (1.7916 + 0.2500) x (1+α)
i.e 2,000 = 220 x (1 + α)
i.e α = 1.088 or 108.8731%
Rick’s vacuum of Muncie uses the pull method to supply hoses to an assembly line. Rick’ss...
The welding department supplies parts to the final assembly line. Management decides to implement a kanban system and has collected the following data. The daily demand is 2,600 units. The production lead time is 6 days (this includes processing time, transport time, and waiting time). Management has decided to have 2 day(s) of safety stock One container fits 350 units How many kanban containers will be needed to support this system? (Round up to next whole number). containers
Boehm Compressors uses a lean production assembly line to make its compressors. In one assembly area, the demand is 100 parts per eight-hour day. It uses a container that holds eight parts. It typically takes about six hours to round-trip a container from one work center to the next and back again. It also desires to hold 15% safety stock of this part in the system. If it reduced the number of containers by one, how would this impact the...
Gestalt, Inc. uses a kanban system in its automobile production facility in Germany. This facility operates 20 hours per day to produce the Jitterbug, a replacement for the obsolete but immensely popular Jitney Beetle. Suppose that a certain part requires 120 seconds of processing at machine cell 33B and an average container of parts averages 1.6 hours of waiting time there. Management has allowed a 12 percent buffer for unexpected occurrences. Each container holds 33 parts, and 9 containers are...
Lady Bug Machineries uses a lean production assembly line to make its generators. In one assembly area, the demand is 200 parts per 8-hour day. It uses a container that holds 10 parts. It typically takes about 5 hours to round-trip a container from one work center to the next and back again. They also desire to hold a 20% safety stock of this part in the system. Based on the required safety stock of zero and the number of...
You are asked to analyze the kanban system of LeWin, a French manufacturer of gaming devices. One of the workstations feeding the assembly line produces part M670N. The daily demand for M670N is 1,750 units. The average processing time per unit is 0.005 day. LeWin's records show that the average container spends 1.100 days waiting at the feeder workstation. The container for M670N can hold 400 units. 16 containers are authorized for the part. Recall that is the average processing...
Bradley's Copiers sells and repairs photocopy machines. The manager needs weekly forecasts of service calls so that he can schedule service personnel. Use the actual demand in the first period for the forecast for the first week so error measurement begins in the second week. The manager uses exponential smoothing with α- 0.4. Forecast the number of calls for week 6, which is next week. Week Actual Service Calls 28 34 3 38 4 23 25 5 The forecast for...
Maggie Moylan Motorcycle Corp. uses kanbans to support its transmission assembly line. Determine the size of the kanban for the mainshaft assembly and the number of kanbans needed. Setup cost $20 Annual holding cost $200 per mainshaft Daily production 360 mainshafts/day Annual usage 25,000 (50 weeks x 5 days each x daily usage of 100 mainshafts) Lead time 3 days Safety stock 1.00 days' production Kanban container size = mainshafts (round your response to the nearest whole number).
Maggie Moylan Motorcycle Corp. uses kanbans to support its transmission assembly line. Determine the size of the kanban for the mainshaft assembly and the number of kanbans needed. Setup cost $20 Annual holding cost $220 per mainshaft Daily production 320 mainshafts/day Annual usage 20,000 (50 weeks 5 days each x daily usage of 80 mainshafts) Lead time 4 days Safety stock 0.50 days' production Kanban container size = 60mainshafts (round your response to the nearest whole number). Number of kanbans...
Explain how the production schedule is developed and communicated to the shop-floor in a Just-in-Time (JIT) manufacturing system. Q. B8 (a) (10 marks) Define kanban as it is understood in JIT systems and explain the role and operation of a conveyance or C kanban in the production system. (b) (6 marks) (c) Data for a particular part that is controlled by a two-card kanban system on a JIT feeder line is as follows: daily demand: 500 units average waiting and...
Maggie Moylan Motorcycle Corp. uses kanbans to support its transmission assembly line. Determine the size of the kanban for the mainshaft assembly and the number of kanbans needed Setup cost Annual holding cost $400 per mainshaft $20 320 mainshafts/day Daily production Annual usage 20,000 (50 weeks x5 days each x daily usage of 80 mainshafts) 3 days Lead time 1.00 days' production Safety stock Kanban container size = 52 mainshafts (round your response to the nearest whole number) Number of...