A 150 m reach of sewer is to be designed to serve the area of the following details.
A 60 hectare (hec) drainage basin containing 40 hec net residential area with average 5 dwelling units per hec with 5 residents, and 20 hec zoned commercial area.
Take wastewater generation for
Residential = 225 L/capita/day
Commercial = 1500 L/hec/day
Peak I&I allowance = 800 L/hec/day
Peaking factor (PF) = 15.05 Q-0.167
If the street elevation at upper manhole is 105 m and at the lower manhole is 102 m. Assume a minimum earth cover of 1.5 m, design the required sewer and provide all the necessary drawings.
Mannings n was not given in question hence
we assumed it as 0.015.Sewer line will atleast 1.5m below ground
level.
Thank you.
A 150 m reach of sewer is to be designed to serve the area of the...
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...