A production facility has a design capacity of 500 units a day and an effective capacity...

A production facility has a design capacity of 500 units a day and an effective capacity of 480 units. Which of the following are potential “determinants” of its effective capacity, accounting for the gap between 500 and 480?

        I. The need for periodic maintenance of the equipment in the facility.

        II. The actual output of the facility.

        III. Lunch breaks and coffee breaks taken during a typical day in the facility.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Design Capacity: Design capacity is the maximum output of a production facility in a given period of time under ideal conditions.

Effective Capacity: Effective capacity refers to the actual capacity expected from the production facility at current operating constraints. Effective capacity will lesser or equal to design capacity.

There is a difference between design capacity (500 units) and effective capacity (480 units) which is 20 units.

The potential determinants of its effective capacity, accounting for the gap between 500 and 480 are as follows:

i. The need for periodic maintenance of the equipment in the facility: Equipment and machinery are very essential in production planning and any issue with equipment and machinery could reduce the production for any production facility. So time to time, equipment and machinery should be maintained properly and updated as per the industry standard.

iii.  Lunch breaks and coffee breaks are taken during a typical day in the facility: Human factors affect the effective capacity in any production facility. Employee motivation, turnover, overtime, and absenteeism all affect the effective output. So the employee spends more time on production facilities will have more output for the firm. Employees spending more time in lunch breaks and other tea-coffee breaks will actually reduce the capacity. So managers should take care of productive hours of employees in the production facility.

Add a comment
Know the answer?
Add Answer to:
A production facility has a design capacity of 500 units a day and an effective capacity...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A company manufactures a product using machine cells. Each cell has a design capacity of 250...

    A company manufactures a product using machine cells. Each cell has a design capacity of 250 units per day and an effective capacity of 230 units per day. At present, actual output averages 200 units per cell, but the manager estimates that productivity improvements soon will increase output to 224 units per day. Annual demand is currently 60,000 units. It is forecasted that within two years, annual demand will triple. How many cells should the company plan to acquire to...

  • Listed here are the total costs associated with the production of 1,000 drum sets manufactured by...

    Listed here are the total costs associated with the production of 1,000 drum sets manufactured by TrueBeat. The drum sets sell for $540 each.    Costs Plastic for casing—$15,000 Wages of assembly workers—$90,000 Property taxes on factory—$8,000 Accounting staff salaries—$42,000 Drum stands (1,000 stands purchased)—$38,000 Rent cost of equipment for sales staff—$36,000 Upper management salaries—$205,000 Annual flat fee for factory maintenance service—$20,000 Sales commissions—$25 per unit Machinery depreciation, straight-line—$35,000 New Plant? Because TrueBeat’s capacity is limited to 8,000 units in...

  • Question 9 9) New Plant? Because TrueBeat's capacity is limited to 8,000 units in their current...

    Question 9 9) New Plant? Because TrueBeat's capacity is limited to 8,000 units in their current production facility, management would like to explore the impact of building a new production facility. The company is considering a new production facility and equipment that will decrease their variable expenses by 30% but increase fixed expenses by 50%. TrueBeat still plans to produce and sell the same number of units in Year 4 (base). The new plant will give them a relevant range...

  • Problem 7.1 Question Help Borges Machine Shop, Inc., has a 1-year contract for the production of...

    Problem 7.1 Question Help Borges Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: Annual contracted units Annual fixed cost Per unit variable cost General Purpose Equipment (GPE)...

  • Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized...

    Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized oil field on Alaska’s north coast. The field is still producing at its maximum rate, 325,000 barrels of oil per day (BOPD). However, to sustain this rate the company started a waterflood of the reservoir two years ago. Now a capacity bottleneck in the water disposal process is threatening to curtail production. In waterflooding, salt water from the Beaufort Sea is treated to remove...

  • 1. Grover Company has the following data for the production and sale of 2,000 units. Sales...

    1. Grover Company has the following data for the production and sale of 2,000 units. Sales price per unit $ 800 per unit Fixed costs: Marketing and administrative $ 400,000 per period Manufacturing overhead $ 200,000 per period Variable costs: Marketing and administrative $ 50 per unit Manufacturing overhead $ 80 per unit Direct labor $ 100 per unit Direct Materials $ 200 per unit    What is the prime cost per unit? a.) $100 b.) $280 c.) $300 d.)...

  • Question 9 1) Summarize the information for TrueBeat from Q9 & 10 of HW1.1 assuming they...

    Question 9 1) Summarize the information for TrueBeat from Q9 & 10 of HW1.1 assuming they produce and sell 1,000 drum sets during the year. Remember to use 2 decimals for "per unit" values. Total Dollars True Beat - Summarized connect given data Average Cost per Unit Direct materials 19 Direct labor $ 90 Variable manufacturing overhead $ 35 Fixed manufacturing overhead $ Fixed selling & administrative expense $ Variable selling & administrative expenses 25 Sales price per unit 516...

  • Question 9a, 9b, 9c, and 9b and Question 6e and 6f (Also please review if ive...

    Question 9a, 9b, 9c, and 9b and Question 6e and 6f (Also please review if ive done the assignment correct) 1) Summarize the information for TrueBeat from 09 & 10 of HW 1.1 assuming they produce and sell 1,000 drum sets during the year. Remember to use 2 decimals for “per unit" values. Total Dollars TrueBeat - Summarized connect given data Average Cost per Unit Direct materials Direct labor $ 90 Variable manufacturing overhead $ 35 Fixed manufacturing overhead $...

  • Summary should briefly analyze the central problems and issues of the case and provide some analysis...

    Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...

  • Ashley Oakley was hired by the Battleground Nurseries (BN), a commercial nursery and landscape supply company...

    Ashley Oakley was hired by the Battleground Nurseries (BN), a commercial nursery and landscape supply company in Oak Ridge, NC, as an Analyst in their newly-formed Project Office (PO). She reported to work and was assigned a small cubicle with an old laptop computer. Not what she had hoped for in her first job, but she was grateful to land her first job in a rapidly growing economy and resolved to give it her best effort. The PO reported to...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT